HomeMy WebLinkAbout2015 06 22 Consent 302 Sheoah Blvd Drainage ProjectCOMMISSION AGENDA ITEM 302 REQUEST: Informational Consent X Public Hearings Regular June 22, 2015 KS KL Regular Meeting City Manager Department The Public Works Department requesting authorization to issue a purchase order to Barracuda Building Corporation for construction of the Sheoah Boulevard Drainage Improvements in the amount of $42,089 plus a 10% contingency. SYNOPSIS: The Sheoah Boulevard Drainage Improvements project consists of grading, stormwater, and roadway improvements along the west side of Sheoah Boulevard between Shepard Road and Aberdeen Lane. This agenda item is to award the work to the lowest responsive bidder, Barracuda Building Corporation, in the amount of $42,089. CONSIDERATIONS: . The existing swale drainage system along the west side of Sheoah Boulevard between Shepard Road and Aberdeen Lane has periodically experienced drainage problems due to poor soil conditions, poor grading, and impacts from vehicles driving over or parking in the swale. The Sheoah Boulevard Drainage Improvements Project addresses these problems and consists of the following items: • Installation of a raised curb and gutter adjacent to the roadway shoulder for the first 280 -feet along the west side of Sheoah Blvd. from Shepard Road • Re- grading of the existing swale including importing of clean fill material • Replacement of the existing underdrain system • Sidewalk and roadway improvements at the southwest corner of Sheoah Blvd. and Shepard Road to improve drainage and pedestrian safety Consent 302 PAGE 1 OF 2 - June 22, 2015 The Sheoah Boulevard Drainage Improvements project was issued for bidding to three qualified contractors who have performed similar work for the City in the past. Barracuda Building Corporation had the lowest bid in the amount of $24,995 and the project was awarded to Barracuda Building Corporation. Shortly after commencing work, it was discovered that the existing underdrain had to be removed and replaced. The cost to replace the underdrain system is $17,094, which brings the modified total project cost to $42,089. Since the modified total project cost exceeds the City Manager's approval limit, City Commission approval is required. . Construction is expected to be complete by the end of June 2015. FISCAL IMPACT: The project cost is $42,089 plus a 10% contingency, funded by the Stormwater Utility Fund. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends the City Commission approve issuing a purchase order to Barracuda Building Corporation for construction of the Sheoah Boulevard Drainage Improvements in the amount of $42,089 plus a 10% contingency, and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1. Exhibit A - Barracuda Building Corporation Proposal (2 pages) Consent 302 PAGE 2 OF 2 - June 22, 2015 EXHIBIT A f: Barracuda Building Corporation CGC #1504612 March 26, 2015 Mr. Ken Hutchings, Public Works Superintendent City of Winter Springs, FL 1126 E SR 434 Winter Springs, FL 32708 RE: Reconstruction of Roadway Edge at Intersection Shepard Rd & Sheoah Blvd Winter Springs, FL Construction Proposal Dear Mr. Hutchings, Barracuda Building Corp. proposes to construct the following scope of work for the sum of twenty four thousand nine hundred ninety five dollars ($24,995.00) including labor, materials, equipment, insurance & taxes: • Temp toilet • Temp water (meters provided by others) • Clearing & grubbing • Imported fill as needed to grade area behind new curb • Cleanup for our scope of work • Re -rock base 24" thick under new curb • New concrete flume, sidewalk & F curb • 20 SF of detectable warning system @ concrete ramps • 14 SY of 2" thick asphalt paving with re -rock base around existing inlet • Bahia sod — 6000 SF The following is a list of clarifications & qualifications to our proposal: • Permits are excluded • Relocation or repairs of existing utilities is excluded, including irrigation • Maintenance of traffic by the City of Winter Springs We thank you for the opportunity to bid this project & we look forward to working with you. If you will kindly sign this proposal below, we can schedule your work at your convenience. Sincerely, Jim Thompson, President Barracuda Bldg. Corp. Accepted by: Date: City of Winter Springs, FL 1000 Ocoee- Apopka Road, Suite 400 Apopka, FL 32703 Phone: (407)814x8644 Fax: (407)814x8044 Barracuda Building Corporation CGC41504612 May 28, 2015 Mr. Ken Hutchings, Public Works Superintendent City of Winter Springs, FL 1126 East SR 434 Winter Springs, FL 32708 RE: Reconstruction of Roadway Edge at Intersection Shepard Rd & Sheoah Blvd Winter Springs, FL Underdrain Change Order Proposal Dear Mr. Hutchings, Barracuda Building Corp. proposes to constructthe following scope of work for the sum of seventeen thousand ninety four dollars ($17,094.00) including labor, materials, equipment, insurance & taxes: • Clearing & grubbing • Cleanup for our scope of work • Grading • Demo & removal of the existing underdrain under roadway • Now underdrain 282 LF (this includes filter fabric, 6" HDPE sock perforated pipe, #4 crushed concrete,1 cleanout) • Wellpoint dewatering system associated with the new underdrain system The following is a breakdown of our pricing for this project: • Remobilization = $1,229.00 • Demo & removal of existing underdrain system = $1,888.00 • New underdrain system = $10,787.00 • Wellpoint system = $3,190.00 Total $17,094.00 The following is a list of clarifications & qualifications to our proposal: • Permits are excluded • Relocation or repairs of existing utilities is excluded, including irrigation • MOT by the City of Winter Springs We thank you for the opportunity to perform this project & we look forward to working with you. Please issue the PO at your earliest convenience. We are proceeding with this work per your directions today. ncerely, Jim Thompson, President Barracuda Bldg. Corp. 1000 Ocoee - Apopka Road, Suite 400 Apopka, FL 32703 Phone: (407814 -8644 Fax: (407)814 -8044