Loading...
HomeMy WebLinkAbout2015 06 08 Consent 302 Bridge Master PlanCOMMISSION AGENDA ITEM 302 Informational Consent X Public Hearings Regular June 08, 2015 KS KL Regular Meeting City Manager Department REQUEST: The Public Works Department requesting City Commission adoption of the proposed Bridge Master Plan. SYNOPSIS: The Bridge Master Plan is an engineering evaluation of 15 major bridges in the City. The Master Plan identifies any deficiencies, and includes cost estimates plus a prioritization schedule for necessary bridge repairs and /or replacements. The Bridge Master Plan was recently completed by Volkert, Inc., and concluded that the City's bridges are all in satisfactory condition and have an average time to replacement of 38 years. The Master Plan identified approximately $2.0 million in repairs to be performed over the next 10 years on the 15 bridges. CONSIDERATIONS: In October 2014 the Public Works Department hired Volkert., Inc. to prepare a citywide Bridge Master Plan. The purpose of the master plan was to: 1) assess the condition of 15 vehicular bridges in the City; 2) prepare a prioritized list of necessary bridge repairs with estimated costs; and 3) determine the years to replacement and cost to replace for all 15 bridges. Volkert, Inc. was selected to perform the Bridge Master Plan for the City because they are the current Florida Department of Transportation (FDOT) bridge inspection consultant. FDOT currently performs bridge inspections of all City -owned bridges every two years, at no cost to the City, as part of FDOT's statewide bridge inspection program. After each inspection, the City is provided an inspection report that Consent 302 PAGE 1 OF 3 - June 08, 2015 summarizes the bridge condition, identifies deficiencies, and recommends any corrective actions. Volkert has inspected the City's bridges for the past several years as part of their inspection contract with FDOT. The City owns and maintains 12 bridges that are on the FDOT inspection schedule, listed as follows: • Northern Way South Loop over Howell Creek • Northern Way North Loop over Howell Creek • Northern Way North Loop over Bear Creek • Murphy Road over Gee Creek • South Edgemon Avenue over Gee Creek • Sheoah Blvd. over Sheoah Creek • Shepard Road over Sheoah Creek • Winter Springs Blvd. over Howell Creek • Winter Springs Blvd. over Bear Creek • Winding Hollow Blvd. over Little Lake Howell Creek • Hayes Road over Gee Creek • Moss Road over Gee Creek The Dyson Drive bridge over Howell Creek is half in the City and half in Seminole County. Since this bridge was recently replaced by Seminole County it was not included in the Bridge Master Plan. In addition to the 12 bridges listed above, Staff had the following three additional bridges /crossings included in the Bridge Master Plan: • Shore Road over Gee Creek • Alton Road over Gee Creek • Costa Rica Drive over Gee Creek (owned by Hacienda Village) The Bridge Master Plan (see Exhibit A attached) identified approximately $2.0 million in recommended repairs to the 15 bridges. Approximately $1.7 million of the repairs are at one bridge, the Northern Way North Loop over Howell Creek. This bridge is classified as "scour critical," meaning that due to unknown information about the bridge's foundation system, the integrity of the foundation may be vulnerable to erosion during extreme storm events. If the repair cost is indeed in the range of $1.7 million, a bridge replacement at a cost of $1.4 million would be more cost effective. Staff intends to implement further testing at the Northern Way North Loop bridge over Howell Creek, as recommended in the Master Plan, to determine the foundation system in place and possibly mitigate some of the potential repair costs. The remainder of the recommended repairs will be scheduled for repairs over the next two years, with the prioritization to follow the recommendations in the Master Plan as listed in Appendix D. The Bridge Master Plan includes an estimated schedule and replacement cost for all 15 bridges. The average time to replace for all bridges is 38 years, which is a good indicator of the overall satisfactory condition of the City's bridges. The earliest bridge replacement is Northern Way South Loop over Howell Creek, which is recommended for replacement in 8 years at a cost of $731,000. Staff intends to monitor this bridge over the next several years and will work closely with FDOT and the FDOT bridge inspection consultant to determine when a replacement should be scheduled. The funding source for a bridge replacement is likely to be the One -Cent Consent 302 PAGE 2 OF 3 - June 08, 2015 Infrastructure Sales Tax (3rd generation) passed in 2014. After the Northern Way South Loop bridge over Howell Creek, the next scheduled bridge replacement is in 22 years for the Shepard Road bridge over Sheoah Creek. FISCAL IMPACT: The City Commission's adoption of the Bridge Master Plan has no direct fiscal impact and this agenda item is not requesting any funding. Funding for future bridge repairs and /or replacements will follow the City's normal budgeting and approval process. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends the City Commission adopt the Bridge Master Plan. ATTACHMENTS: 1. Exhibit A - Bridge Master Plan (52 pages) Consent 302 PAGE 3 OF 3 - June 08, 2015 Bridge Master Plan Prepared for: City of Winter Springs Incorporated 1959 Prepared by: VOLKERT, INC. 1405 N. Westshore Blvd. Suite 600 Tampa, Florida 33607 (813) 875 -1365 May 2015 S 1Work - FloridaTiry of Winter SpringslWorcKowr. doc N\011111111111/1/ ii o S 3 • STA�E�,�J;' 90,E • O R 4 May 1, 2015 Project No: 453100.63 City of Winter Springs Department of Public Works City Hall 1126 E. State Road 434 Winter Springs, FL 32708 Attention: Brian Fields, P.E. Reference: Bridge Master Plan Gentlemen: We are pleased to submit this report which focuses on budgetary planning for long term maintenance of the City's bridges. The objectives are to assess the maintenance needs for the bridges and provide the City with annualized budgetary information supporting a long term bridge maintenance program. SUMMARY The City is responsible for 15 bridges that carry vehicular traffic. We have developed a listing of deficiencies for each of the vehicular bridges, prepared cost estimates for repairs and replacements, and incorporated time frame prioritization to estimate the annualized cost. DESCRIPTION OF THE CITY'S BRIDGES Following is a listing of the City's 15 bridges that are included in this budget planning report. The table identifies a few specific data items about each bridge including age; classifications regarding structural deficiency, functional obsolescence, and scour criticalness; and ratings for load and sufficiency. City of Winter Springs Department of Public Works 05/01/15 Page 2 of 6 BRIDGE INVENTORY IDENTIFIERS AGE CLASSIFICATIONS RATINGS APPROX . FSOLE SCOUR LOAD BRIDGE FACILITY FEATURE AGE OF DEFICIENT DEFICIENT OBSOLETE CRITICAL SUFF. RATING HEALTH NO. CARRIED INTERSECTED BRIDGE (Y /N) (Y /N) (Y /N) RATING (INVENTORY) INDEX (YRS) TONS NORTHERN HOWELL 775703 WAY SOUTH CREEK 41 N N N 54.3 17.0 77.18 LOOP 775704 MURPHY RD GEE CREEK 41 N N N 98.6 42.7 49.24 SOUTH 775705 EDGEMON GEE CREEK 41 N N N 98.4 39.1 70.46 AVE 775707 SHEOAH SHEOAH 42 N Y N 76.8 39.6 77.23 BLVD CREEK 775708 SHEPARD SHEOAH 42 N Y N 63.5 23.0 99.33 RD CREEK NORTHERN HOWELL 775709 WAY NORTH CREEK 33 N N Y 85.3 29.9 68.52 LOOP 775710 NORTHERN BEAR CREEK 33 N N N 89.3 38.5 85.62 WINTER 775711 SPRINGS HOWELL 32 N N N 94.7 58.9 81.11 BLVD CREEK WINTER 775712 SPRINGS BEAR CREEK 27 N N Y 95.1 38.5 80.52 BLVD WINDING LITTLE LAKE 775713 HOLLOW HOWELL 19 N N N 89.3 56.4 60.10 BLVD CREEK 775714 HAYES RD GEE CREEK 17 N N N 97.4 33.0 74.77 775715 MOSS RD GEE CREEK 16 N N N 99.3 35.9 77.15 N/A SHORE RD GEE CREEK UNKNOWN N N N 100.0 N/A N/A N/A ALTON RD GEE CREEK UNKNOWN N N N 100.0 N/A N/A N/A COSTA RICA GEE CREEK UNKNOWN N N N 90.1 N/A N/A The columns in the table above are explained as follows: To be Structurally Deficient the major components of a bridge are in poor condition, or the overall structural evaluation is basically intolerable requiring a high priority of replacement. Additionally, a waterway that is basically intolerable requiring a high priority of replacement will render a classification of structurally deficient. To be Functionally Obsolete the deck geometry, the underside clearances, or the overall structural evaluation or the waterway adequacy must be basically intolerable requiring a high priority of corrective action. To be Scour Critical the bridge abutments or pier foundations are rated as unstable due to observed scour at the bridge site or scour potential as determined from a scour evaluation study. S: \Work - Florida \City of Winter Springs \Word \Report. doe City of Winter Springs Department of Public Works 05/01/15 Page 3 of 6 The Sufficiency Rating is a value from zero to 100 that is used for evaluating highway bridge data. It is indicative of a bridge's sufficiency to remain in service. The sufficiency rating is calculated using four separate factors: Structural Adequacy and Safety, Serviceability and Functional Obsolescence, Essentiality for Public Use, and Special Reductions. An entirely sufficient bridge would have a sufficiency rating of 100 and an entirely insufficient or deficient bridge would have a zero. An Inventory Load Rating results in a load level which can safely utilize the bridge for an indefinite period of time. The Health Index is a tool that measures the overall condition of the bridge taking into consideration 10 to 12 different bridge elements. A lower health index means that more work would be required to improve the bridge to an ideal condition. A health index below 85 generally indicates that some repairs are needed, although it does not mean the bridge is unsafe. A low health index may also indicate that it would be more economical to replace the bridge than to repair it. FINDINGS — BASIC COSTS Bridge Repair Costs We collected and reviewed the bridge inspection reports for the City's 12 Florida Department of Transportation (FDOT) qualifier bridges and their 3 non - qualifier bridges. We estimated quantities for the repairs and estimated the repair costs based primarily on using FDOT historical bid prices. Individual cost estimates for repair of the bridges are contained in Appendix B. Some of the most common deficiencies that were documented were cracked and spalled areas of concrete, missing or damaged railings, deck joint deficiencies, guardrail damage, slope and bank erosion, and bridge deck expansion joint deficiencies. The total estimated construction cost of repairing the current deficiencies in the City's 15 bridges is approximately $2,013,339 which includes allowances for mobilization, maintenance of traffic, contingencies, price escalation, design, and construction engineering and inspection (CEI). This is a one -time cost and only one mobilization per bridge is assumed. Bridge Replacement Costs We applied the FDOT Bridge Cost per Square Foot prices (Appendix C) considering the existing plan area for bridge removal and the current FDOT bridge section requirements for new construction. Individual cost estimate spreadsheets for the replacement of the bridges are located in Appendix C. The total cost of replacing all 15 bridges is estimated to be approximately $13,769,201. This includes an allowance for utilities, approach roadway, maintenance of traffic, contingencies, design, and CEI. S: \Work - Florida \City of Winter Springs \Word \Report. doe City of Winter Springs Department of Public Works 05/01/15 Page 4 of 6 ANNUALIZED COSTS Annualized costs were developed as average amounts over the respective periods of time for repair and replacement. Repairs The itemized repairs for each bridge were segregated into four work priority groups: Emergency, Urgent, Routine, and Informational. The work priority groups were developed based on the "Florida Greenbook" and FDOT's Bridge Maintenance Management Handbook. Within each group are priority levels A, B, C, etc. which generally related to primary members, secondary members, and operational conditions respectively. These four groups are more completely defined and described in the bridge evaluation memorandum in Appendix A. The FDOT Bridge Maintenance and Repair Handbook was also consulted in order to itemize quantities for the various repairs, and is a good resource for the means and methods in which to complete the documented repairs. We assigned a year by which the repairs generally would be expected to be completed according to the priority groups as summarized below: 1 year: Emergency IA, IB, and IC; Urgent IIA, IIB, IIC 2 years: Urgent IID 3 years: Routine IIIA, IIIB, IIIC 8 years: Informational IVA and 10 years: Informational IVB The breakdown of categorized repairs is summarized in Appendix D. Appendix D also documents the annualized cost calculations for repairs of each bridge. Replacements A formula to estimate remaining service is not found in AASHTO or FDOT publications making estimates somewhat subjective. Although 75 years is often applied as a "ballpark" figure, service life can vary widely from bridge to bridge. For our approach, we developed a replacement year for each bridge considering the era in which the structure was built, the environment, the structure type, and the current Structural Evaluation by FDOT (Appendix E). Those replacement years were applied to the individual replacement costs shown in Appendix C. That calculation is presented in Appendix E. S: \Work - Florida \City of Winter Springs \Word \Report. doe City of Winter Springs Department of Public Works 05/01/15 Page 5 of 6 SCOUR CRITICAL BRIDGES The City has two bridges, Bridge No. 775709 and Bridge No. 775712, which are identified as Scour Critical bridges. Both of these bridges have a scour evaluation report and a scour critical bridge plan of action associated with them, and both the report and plan of action have recommendations for alleviating the scour issues at each bridge. The plan of action was updated in June 2014 by Volkert, Inc. after the completion of the latest inspection (also conducted by Volkert, Inc.). After further review and discussion of this information, it is our opinion to follow the guidelines and recommendations presented within these documents, including the scope of repairs as presented. These items have been added to our proposed bridge repair estimates in Appendix B, and the associated costs have been updated based on current MOT Statewide Cost Averages. One possible way to mitigate some of the potential cost of the proposed scour countermeasures is to implement further testing to determine the foundation system for the bridges. Currently both bridges have a foundation system defined as "unknown" and thusly assumptions have to be made which can lead to conservative estimates for remediation. The cost (per bridge) to conduct the foundation testing and subsequently revise the scour report/plan of action would be on the order of $40,000 and $50,000 respectively. This initial fee could produce a smaller total cost of rehabilitation for the City in the long run. The consideration of providing these repairs or replacing the bridge entirely is dependent upon many factors. Analyzing the cost analysis presented in this report, as well as the functional life remaining for both bridges, it would seem to benefit the City more to repair Bridge 775712 rather than replace it, due to the relatively low repair to replacement cost ratio and the approximation of 47 years until replacement is necessary or required. Bridge 775709 however, purely based on a cost estimate standpoint, could be a candidate to replace rather than repair, as our estimates are actually showing a higher total cost to repair the bridge. It should be noted that these are only estimates and can only provide initial analysis. Further investigation may need to be conducted by the City to determine the viability of these options. CONCLUSIONS Based on our findings, a total of approximately $2,013,339 is needed for repairs to the current bridges. As shown in Appendix D, based on the category of repairs documented, approximately $1,853,244 should be budgeted annually. As you can see, this annual budget is actually a very high percentage of the total estimate, with the majority of funds required for the first year of repairs at both scour critical bridges. Therefore, the City could plan to address the two scour critical bridges separately for the first year (approximate cost of $1,759,443), but allow the remaining bridges to be considered together, as this would result in a significantly reduced annual budget for years 2 -10. S: \Work - Florida \City of Winter Springs \Word \Report. doe City of Winter Springs Department of Public Works 05/01/15 Page 6 of 6 For the replacement of the bridges, a total of approximately $13,769,201 is needed. The average annual cost calculated in Appendix E is approximately $426,803. This number; however, represents budgeting for the replacement of the bridges based on today's economy with today's pricing. Considering the average years to replacement of all the 15 bridges is approximately 38 years, more emphasis should be put on the total amount needed, as the City decides on planning its budget long term. It should be noted that only the current inventory of 15 bridges was considered. Should the City assume responsibility for additional bridges, additional funding would be required. Additionally, storm events, vehicular collisions, and other conditions would certainly change the state of the City's bridges. The budget should be periodically re- evaluated. This evaluation applies broad averages and makes certain assumptions and considerations of how the City's bridge program might be managed but specifically does not attempt to develop a total bridge maintenance program. Volkert appreciates the opportunity to provide these professional engineering services to the City of Winter Springs. Please contact us if you have any questions or comments. Very truly yours, VOLKERT, INC. 01 /& Mark S. Lauckner, P.E. P.E. No. 58663 Project Manager SAWork - Fiorida\City of Winter SpringslWord\Report.doc Volkert, Inc. Certificate of Authorization No. 4641 APPENDIX A MEMORANDUM Project No. 453100.63 To: Mr. Brian Fields, P.E. From: Mr. Mark S. Lauckner, P.E. Date: May 1, 2015 RE: Bridge Master Plan This memorandum is to summarize the priority levels and the definitions thereof that we are suggesting for the repairs recommended for the referenced bridges. These were developed with primary guidance obtained from the "Florida Greenbook" 2011 along with secondary guidance found in the FDOT's Bridge Maintenance Management Handbook, 1996 and FDOT's Bridge Operations and Maintenance Manual, 1995 regarding bridge work need categories. A major difference between FDOT's publications and the Greenbook is FDOT does not include upgrades to safety features as does the Greenbook. It should be noted that, according to the FDOT Bridge Maintenance Management Handbook, prioritization is independent from the need to accomplish the work. This makes prioritization a somewhat subjective exercise. It should also be noted that in scheduling the work, greater economy can sometimes be obtained in combining similar work types. Thus some lower priority work may need to be scheduled ahead of other higher priority work items. We have included four priority groups as follows: I. Emergency Maintenance II. Urgent Maintenance and Upgrading Safety Features III. Routine Maintenance IV. Informational Within each group are priority levels A, B, C, etc. which generally relate to primary members, secondary members and operational conditions respectively. S: \Work - Florida \City of Winter Springs \Word \Priorities.doc The groups and levels generally correspond to FDOT's work need categorization except that upgrading safety features (Priority II D) was added following Urgent Maintenance and preceding Routine Maintenance. PRIORITY GROUP I MAINTENANCE ACTIVITY TYPE: EMERGENCY MAINTENANCE Emergency maintenance operations are those required to immediately restore the highway to a safe condition. Ref.- Florida Greenbook, Chapter 10 Article F.1. Repairs must begin immediately to restore critical damages on the structure and to ensure the safety of the traveling public. Ref.- FDOT Bridge Operations and Maintenance Manual, Article 311 C.1. Priority I A, "Imminent" Failure Condition (Numerical Condition Rating (NCR) = 1) Major deterioration, section loss, or damage of primary structural members or components. Bridge is closed to traffic until corrective action is taken. Ref.- FDOT, Bridge Maintenance Management Handbook, Article 5.1.1. Priority I B, Critical Condition (NCR = 2) Advanced deterioration or damage of primary structural members or components. Unless closely monitored, traffic to the bridge may be restricted or the bridge may be closed until corrective action is taken. Ref.- FDOT, Bridge Maintenance Management Handbook, Article 5.1.2. Priority I C, Operational Conditions Any condition or damage that is a clear and present danger to the structure or to motorists, pedestrians, or mariners traveling on or under the bridge. Ref.- FDOT, Bridge Maintenance Management Handbook, Article 5.1.3. PRIORITY GROUP II MAINTENANCE ACTIVITY TYPE: URGENT MAINTENACE AND UPGRADING SAFETY FEATURES Restore deteriorated primary components of the bridge to a safe and serviceable condition. Ref.- FDOT Maintenance Management Handbook, Article 5.2. S: \Work - Florida \City of Winter Springs \Word \Priorities.doc Special maintenance operations are defined as those projects that are neither urgent nor routine in nature, but are occasionally required to improve or maintain a street or highway in a quality condition. Special maintenance should include the upgrading of the highway safety features, as well as the repair or replacement of damaged or deteriorated highway components. Ref: "Florida Greenbook" Chapter 10, Article E3. Repairs which must be completed to correct deficiencies or defects in order to protect the integrity of the structure or to maintain a desired level of performance. Ref: FDOT Bridge Operations and Maintenance Manual, Article 3. 11. C. 2. Priority II A, Urgent, Serious Conditions (NCR = 3) Loss of section, deterioration, spalling, or scour that seriously affect primary structural members or components. Local failures are possible. Ref: FDOT Bridge Maintenance Management Handbook, Article 5.2. 1. Priority II B, Urgent, Poor Conditions (NCR = 4) Advanced section loss, deterioration, spalling, or scour that may affect primary structural members or components. Ref: FDOT Bridge Maintenance Management Handbook, Article 5.2.2. Priority II C, Urgent, Operational Conditions Any condition or damage to equipment or element that prevents the equipment from performing its intended function at an acceptable level of reliability and /or effectiveness. Ref: FDOT Bridge Maintenance Management Handbook, Article 5.2.3. Priority II D, Upgrading Safety Features The improvement or correction of situations that may result in fatal or serious crashes. Ref: "Florida Greenbook, " Chapter 10, Article E. The fact that a major portion of maintenance effort is necessary to merely preserve the economic investment in a facility should not be considered as justification for sacrificing the requirements for maintaining or improving the safety characteristics of a street or highway. Ref: "Florida Greenbook, " Chapter 10, Article A. Every effort should be made to ensure the highest safety payoff from the maintenance dollar. Ref: "Florida Greenbook, " Chapter 10, Article E. S: \Work - Florida \City of Winter Springs \Word \Priorities.doc PRIORITY GROUP III MAINTENANCE ACTIVITY TYPE: ROUTINE MAINTENANCE Routine maintenance operations are those that may be predicted and planned in advance. These operations, which may be preventive or corrective in nature, should be conducted on a regularly scheduled basis using standard procedures. Ref: "Florida Greenbook, " Chapter 10, Article E2. The routine category includes minor repair and associated tasks necessary to maintain (keep) a safe and efficient transportation system, including the cleaning, maintenance, and minor repair of bridge structures. Ref: FDOT Bridge Maintenance Management Handbook, Article 5.3. Maintenance or repairs which must be completed to maintain existing level of performance and to prevent additional deterioration or to extend the service life of the structure. Ref: FDOT Bridge Operations and Maintenance Manual, Article 3.11.C.3. Priority III A, Fair Conditions (NCR = 5) All primary structural elements are sound (i.e. no loss of strength), but may have minor section loss, cracking, spalling, or scour. Priority III B, Secondary Structural Elements/Members Advanced section loss, deterioration, or spalling of secondary structural members such as bracing, lacing bars and batten plates on tangent multi -beam and multi - girder bridges. Priority III C, Non - Structural Elements/Members Advanced section loss, deterioration, or spalling of non - structural members such as deck expansion joints, drainage systems, bridge railing, fender systems, slope protection, and walkways. Includes any condition or damage to equipment or element that allows the equipment or element to perform its intended function, but at a reduced level of reliability and /or effectiveness. PRIORITY GROUP IV MAINTENANCE ACTIVITY TYPE: INFORMATIONAL Work needs in this category are intended to correct superficial deterioration or problems that do not currently affect the strength of the bridge. Included in this category are minor maintenance and repairs to secondary and non - structural members as well as cosmetic and preventive maintenance to primary structural members. Ref: FDOT Bridge Maintenance Management Handbook, Article 5.4. S: \Work - Florida \City of Winter Springs \Word \Priorities.doc Work that is superficial to the integrity of the structure. Ref: FDOT Bridge Operations and Maintenance Manual, Article 3. 11. C. 4. Priority IV A, Satisfactory Conditions (NCR = 6) Conditions are sufficient to meet the structural or functional requirements of the element; however, elements show some minor deterioration. Priority IV B, Good Conditions (NCR = 7) Generally good conditions with some minor problems. The distinction between the NCR of 6 and 7 is not so much a qualitative distinction, but rather a quantitative distinction. A NCR 7 defect may have similar conditions as for a NCR 6, only fewer of them. S: \Work - Florida \City of Winter Springs \Word \Priorities.doc APPENDIX B VOLKERT Project No.: 453100.63 Description: Northern Way South Loop over Howell Creek Designer: MME Date: 12.17.14 No. Inspector Recommendations 1 Clean and seal deck joints over the end bents 2 Seal open joint between northwest wingwall cap and sheet pile panel 3 Remove graffiti on the structure underside 2 2 Bridge 775703 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 Priority III C III A IV 13 Pay Item IDescription I Unit I Quantityl Rate I Total Group III A 411 -1 Epoxy material for Crack Injection - Structures Rehab GA 1 $ 141.67 $ 141.67 411 -2 Cracks Inject & Seal - Structures Rehab LF 15 $ 46.69 $ 700.35 Sub -Total $ 842.02 Group III C 458 -1 -21 Bridge Deck Expansion Joint, Rehabilitation, Poured Joint with Backer Rod LF 71 $ 56.16 $ 3,987.36 Sub -Total $ 3,987.36 Group IV B 563 -4 Anti - Graffiti Coating, Non - Sacrificial SF 1627 $ 0.95 $ 1,545.65 Sub -Total $ 1,545.65 TOTAL $ 6,375.03 S: \Work - Florida \City of Winter Springs \Excel \Bridge Repair Cost Estimates.xlsBrdg 775703 VOLKERT Project No.: 453100.63 Description: Murphy Rd over Gee Creek Designer: MME Date: 12.17.14 No. Inspector Recommendations 1 Replace all cushion blocks for guardrail 2 Repair 7 deficiencies including spalls, delaminations and a popout, listed in Table 1 of the addendum 3 Apply coating on lower 6 inches of walls on all three cells to protect from scale 4 Remove vegetation and install toe wall protection west end of culvert 5 Fill and stabilize east end of culvert 4 4 5 Brdg 775704 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 Priority 11 III A III A III C III C Pay Item Description Unit Quantity Rate Total Group II D 536 -83 -1 Guardrail Post Replacement, Regular EA 30 $ 50.00 $ 1,500.00 Sub -Total $ 1,500.00 Group III A 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 2.2 $ 400.00 $ 880.00 400 -150 Cleaning and Sealing Existing Concrete Surfaces SF 120 $ 25.00 $ 3,000.00 Sub -Total $ 3,880.00 Group III C 110 -1 -1 Clearing & Grubbing AC 0.04 $ 8,322.45 $ 332.90 530 -3 -4 Rip Rap - Rubble, F &I, Ditch Lining TN 4.3 $ 81.99 $ 352.56 400 -4 -1 Concrete Class IV, Culverts CY 0.6 $ 1,285.83 $ 771.50 Sub -Total $ 1,456.95 TOTAL $ 6,836.95 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsBrdg 775704 No. 1 2 3 4 5 1 2,3,4 VoIJCERT Project No.: 453100.63 Description: South Edgemon Ave over Gee Creek Designer: MME Date: 12.17.14 Inspector Recommendations Replace all cushion blocks Repair through holes in Wall 1 lower east end and east end of Wall Repair spall top face of southwest wingwall at headwall Repair delamination top face of northeast wingwall at headwall Fill and stabilize void in southeast approach mowing strip Bridae 775705 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 Priority 11 III A III A III A III C Pay Item IDescription I Unit I Quantity I Rate I Total Group II D 536 -83 -1 Guardrail Post Replacement, Regular EA 22 $ 50.00 $ 1,100.00 Sub -Total $ 1,100.00 Group III A 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.2 $ 400.00 $ 80.00 Sub -Total $ 80.00 Group III C 339 -1 Miscellaneous Asphalt Pavement TN 0.1 $ 156.43 $ 15.64 Sub -Total $ 15.64 TOTAL $ 1,195.64 S: \Work - Florida \City of Winter Springs \Excel \Bridge Repair Cost Estimates.xlsBrdg 775705 VOLKERT Project No.: 453100.63 Description: Sheoah Blvd over Sheoah Creek Designer: MME Date: 12.17.14 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 No. Inspector Recommendations Priority 1 Clean and seal the asphalt cracks over both abutment joints III C 2 Clean and seal the expansion joints in the sidewalks over both abutments III C 3 Clean and paint the bridge rail post anchor bolts III C 4 Replace split / decayed bridge rail post anchor bolt spacer II D 5 Repair the settled and displaced rip rap bags at the left (west) side of Abutment 2 III C 6 Clean and back fill the hole in the concrete slope protection at the southeast corner III C 7 Clean and paint or replace the utility hangers for the PVC conduit along the west edge IV A 8 Repair the broken PVC conduit connection on the west edge IV A 4 1 2 3 5 6 6 7 8 Bridae 775707 Pay Item IDescription I Unit I Quantity I Rate I Total Group II D 536 -83 -1 Guardrail Post Replacement, Regular EA 26 $ 50.00 $ 1,300.00 Sub -Total $ 1,300.00 Group III C 305 -1 Bituminous Crack and Joint Sealing for Asphaltic Concrete Roadway LF 70 $ 40.00 $ 2,800.00 458 -1 -21 Bridge Deck Expansion Joint, Rehabilitation, Poured Joint with Backer Rod LF 10 $ 56.16 $ 561.60 561 -2 lCoating Existing Structural Steel SF 3 $ 50.00 $ 150.00 530 -1 Rip Rap, Sand - Cement CY 0.9 $ 559.84 $ 503.86 142 -70 Fill Sand CY 1 $ 49.83 $ 49.83 524 -2 -2 Concrete Slope Pavement, Non - Reinforced, 4" SY 1 $ 102.10 $ 102.10 Sub -Total $ 4,167.39 Group IV A 561 -2 Coating Existing Structural Steel SF 1 $ 50.00 $ 50.00 1055 -11 -244 Utility Fitting, F &I, PVC, Union, 8 "- 19.9" EA 1 $ 1,091.27 $ 1,091.27 Sub -Total $ 1,141.27 TOTAL $ 6,608.66 S: \Work - Florida \City of Winter Springs \Excel \Bridge Repair Cost Estimates.xlsBrdg 775707 VOLKERT Project No.: 453100.63 Description: Shepard Rd over Sheoah Creek Designer: MME Date: 12.17.14 No. Inspector Recommendations 1 Remove corrosion and paint the right side bicycle rail post fasteners 2 Replace decayed bridge rail cushion blocks 3 Properly align all rotated bridge rail cushion blocks and install anti - rotation nails 4 Fill and stabilize undermined area at west edge of northwest approach sidewalk at Abutment 1 2,3 1 4 4 Bridge 775708 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 Priority III C 11 11 III C Pay Item IDescription I Unit I Quantity I Rate I Total Group II D 536 -83 -1 Guardrail Post Replacement, Regular EA 32 $ 50.00 $ 1,600.00 Sub -Total $ 1,600.00 Group III C 561 -2 Coating Existing Structural Steel SF 3 $ 50.00 $ 150.00 142 -70 Fill Sand CY 1 $ 49.83 $ 49.83 514 -71 -2 Plastic Filter Fabric, Stabilization SY 1 $ 5.89 $ 5.89 Sub -Total $ 205.72 TOTAL $ 1,805.72 S: \Work - Florida \City of Winter Springs \Excel \Bridge Repair Cost Estimates.xlsBrdg 775708 VOLKERT Project No.: 453100.63 Description: Northern Way over Howell Creek Designer: MME Date: 12.17.14 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 No. Inspector Recommendations Priority 1 Repair spalling and delaminating at bottom face of End bent 3 cap III A 2 Seal backwall to cap joints III A 3 Replace northeast slope and eliminate backfill leakage III C 4 Realign channel to flow under Span 2 and bypass northeast wingwall II B 5 Install channel slope protection in front of Abutment 1 II B 6 Repair all open joints with backfill loss in northeast wingwall III A 7 Repair spall that has exposed steel at third angle break of northeast wingwall cap III A 8 Replace approach sidewalk sections at northeast approach III C 9 Remove graffiti on structure underside IV B 4,5 4,5 4,5 4,5 4,5 4,5 4,5 1,7 i i 7 Bridae 775709 Pay Item IDescription I Unit I Quantity I Rate I Total Group II B N/A Sonar Device EA 1 $ 25,000.00 $ 25,000.00 104 -11 Floating Turbidity Barrier LF 568 $ 7.33 $ 4,163.44 110 -1 -1 Clearing & Grubbing AC 0.46 $ 8,322.45 $ 3,828.33 120 -5 Channel Excavation CY 746 $ 9.72 $ 7,251.12 514 -71 -1 Plastic Filter Fabric, Subsurface SY 2238 $ 6.30 $ 14,099.40 530 -76 -4 lGabion Mat, 12" Thick SY 2238 $ 320.00 $ 716,160.00 530 -77 -2 JGabion Basket, 36" Thick SY 466 $ 95.00 $ 44,270.00 Sub -Total $ 814,772.29 Group III A 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 3.0 $ 400.00 $ 1,200.00 411 -1 Epoxy material for Crack Injection - Structures Rehab GA 6 $ 141.67 $ 850.02 411 -2 Cracks Inject & Seal - Structures Rehab LF 100 $ 46.69 $ 4,669.00 Sub -Total $ 6,719.02 Group III C 142 -70 Fill Sand CY 2 $ 49.83 $ 99.66 524 -2 -2 Concrete Slope Pavement, Non - Reinforced, 4" SY 12 $ 102.10 $ 1,225.20 522 -1 Concrete Sidewalk and Driveways, 4" Thick SY 12 $ 33.20 $ 398.40 Sub -Total $ 1,723.26 Group IV B 563 -4 Anti - Graffiti Coating, Non - Sacrificial SF 3287 $ 0.95 $ 3,122.65 Sub -Total $ 3,122.65 TOTAL $ 826,337.22 S: \Work - Florida \City of Winter Springs \Excel \Bridge Repair Cost Estimates.xlsBrdg 775709 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 4 3,12 3,12 13 1,2 7,8 7,8 6,10 6,10 5 9 14 11 VOUCERT Project No.: 453100.63 Description: Northern Way over Bear Creek Designer: MME Date: 12.17.14 Inspector Recommendations Repair delaminated patch at Slab Unit 1 -6 Repair spall in underside of Slab Unit 1 -9 Repair voids in slope protection at the ends of the northwest, southwest, and southeast retaining walls Install under drains in voids at retaining walls to control erosion Repair spall/delaminating patch on east end of northeast approach slab sidewalk Fill and stabilize undermined northeast approach slab sidewalk Repair diagonal crack at bottom face of northeast wingwall cap Repair crack in northeast wingwall Pile 1 Rebuild settled northwest sidewalk at the northwest approach slab sidewalk Repair undermined northeast sidewalk at approach transition/stabilize erosion on slope Remove graffiti under structure Repair erosion on northeast slope Upgrade the guardrail transitions at the bridge barriers Repair broken northwest PVC conduit Bridae 775710 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 Priority III A III A 11 11 III C III C III A III A III C III C IV B 11 11 IV A Pay Item IDescription I Unit I Quantity I Rate I Total Group II D 440 -1 -10 Underdrain, Type I LF 20 $ 37.19 $ 743.80 142 -70 Fill Sand CY 3 $ 49.83 $ 149.49 514 -71 -2 Plastic Filter Fabric, Stabilization SY 6 $ 5.89 $ 35.34 536 -8 Guardrail Bridge Anchorage Assembly, Furnish & Install EA 4 $ 2,473.99 $ 9,895.96 Sub -Total $ 10,824.59 Group III A 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 1.8 $ 400.00 $ 720.00 411 -1 Epoxy material for Crack Injection - Structures Rehab GA 1 $ 141.67 $ 141.67 411 -2 Cracks Inject & Seal - Structures Rehab LF 7 $ 46.69 $ 326.83 Sub -Total $ 1,188.50 Group III C 142 -70 Fill Sand CY 9 $ 49.83 $ 448.47 514 -71 -2 Plastic Filter Fabric, Stabilization SY 26 $ 5.89 $ 153.14 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.5 $ 400.00 $ 200.00 522 -1 Concrete Sidewalk and Driveways, 4" Thick SY 6 $ 33.20 $ 199.20 Sub -Total $ 1,000.81 Group IV A 1050 -11 -212 Utility Pipe, F &I, PVC, Casing /Conduit, 2 -4.9" LF 10 $ 16.33 $ 163.30 Sub -Total $ 163.30 Group IV B 563 -4 Anti - Graffiti Coating, Non - Sacrificial SF 3276 $ 0.95 $ 3,112.20 Sub -Total $ 3,112.20 TOTAL $ 16,289.40 S: \Work - Florida \City of Winter Springs \Excel \Bridge Repair Cost Estimates.xlsBrdg 775710 VOLKERT Project No.: 453100.63 Description: Winter Springs Blvd over Howell Creek Designer: MME Date: 12.17.14 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 No. Inspector Recommendations Priority 1 Clean and paint exposed rebar at the right barrier in Span 2 and the left barrier at Span 3 III C 2 Remove loose concrete and clean and paint exposed rebar at the south haunch spalls at Bent 2 III A 3 Remove drift from the channel under the structure /realign the channel II B 4 Remove / paint over graffiti at the underside of the structure IV B 5 Replace all broken and missing reflectors at the northwest and northeast guardrails II D 6 Relocate the utility hanger a tree is growing into at south side of Span 2 near Bent 2 or remove tree II B 7 Cut back tree branches overhanging the bridge II B 8 Provide a relief joint at the northwest approach curb and approach slab interface III C 9 Remove loose concrete and repair spalled area at the northwest approach curb III C 3,6,7 3 5 2 1,9 8 4 Brda 775711 Pay Item Description Unit Quantity Rate Total Group II B 110 -1 -1 Clearing & Grubbing AC 0.09 $ 8,322.45 $ 749.02 120 -5 Channel Excavation CY 167 $ 9.72 $ 1,623.24 Sub -Total $ 2,372.26 Group II D 536 -1 -1 Guardrail, Roadway LF 100 $ 16.07 $ 1,607.00 Sub -Total $ 1,607.00 Group III A 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.5 $ 400.00 $ 200.00 Sub -Total $ 200.00 Group III C 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.2 $ 400.00 $ 80.00 458 -1 -21 Bridge Deck Expansion Joint, Rehabilitation, Poured Joint with Backer Rod LF 5 $ 56.16 $ 280.80 Sub -Total $ 360.80 Group IV B 563 -4 Anti - Graffiti Coating, Non - Sacrificial SF 6490 $ 0.95 $ 6,165.50 Sub -Total $ 6,165.50 TOTAL $ 10,705.56 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsBrdg 775711 VOLKERT Project No.: 453100.63 Description: Winter Springs Blvd over Bear Creek Designer: MME Date: 12.17.14 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 No. Inspector Recommendations Priority 1 Remove corrosion from the aluminum rail anchor fasteners and apply a protective coating III C 2 Replace the missing anchor bolt nut at left Post 4 III C 3 Fill and stabilize Abutment 1 slope II B 4 Install erosion countermeasures on the Abutment 1 slope II B 5 Repair the spall in the north (left) curb at the west approach slab III C 6 Replace fractured and settled sidewalk panels at the northwest approach III C 7 Repair the void beneath the left approach sidewalk, west of the structure near the manhole III C 8 Seal the gap at the northwest approach curb and approach sidewalk interface III C 9 Repair the broken PVC conduit at the northeast corner of Abutment 3 IV A 3,4 3,4 3,4 3,4 1 2 5 6 7 7 8 8 Brda 775712 Pay Item IDescription I Unit I Quantity I Rate I Total Group II B 104 -11 Floating Turbidity Barrier LF 250 $ 7.33 $ 1,832.50 110 -1 -1 Clearing & Grubbing AC 0.06 $ 8,322.45 $ 499.35 120 -5 Channel Excavation CY 150 $ 9.72 $ 1,458.00 530 -3 -3 Rip Rap - Rubble, Bank and Shore TN 220 $ 76.80 $ 16,896.00 Sub -Total $ 20,685.85 Group III C 561 -2 Coating Existing Structural Steel SF 11 $ 50.00 $ 550.00 460 -112 Anchor Bolt Replacement EA 1 $ 621.33 $ 621.33 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.3 $ 400.00 $ 120.00 522 -1 Concrete Sidewalk and Driveways, 4" Thick SY 6 $ 33.20 $ 199.20 142 -70 Fill Sand CY 1 $ 49.83 $ 49.83 514 -71 -2 Plastic Filter Fabric, Stabilization SY 1 $ 5.89 $ 5.89 411 -1 Epoxy material for Crack Injection - Structures Rehab GA 1 $ 141.67 $ 141.67 411 -2 Cracks Inject & Seal - Structures Rehab LF 5 $ 46.69 $ 233.45 Sub -Total $ 1,921.37 Group IV A 1050 -11 -212 Utility Pipe, F &I, PVC, Casing /Conduit, 2 -4.9" LF 10 $ 16.33 $ 163.30 Sub -Total $ 163.30 TOTAL $ 22,770.52 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsBrdg 775712 Project No.: 453100.63 Description: Winding Hollow Blvd over Little Lake Howell Creek Designer: MME Date: 12.17.14 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 No. Inspector Recommendations Priority 1 Replace the sealant in the sidewalks at both abutment expansion joints III C 2 Remoove loose / spalled concrete and chain link fence post connections and repair /replace any loose or corroded anchor bolts II D 3 Repair undermining of the fabri form mat toe along the north side of the channel III C 4 Remoove loose concrete and repair spalls and delaminations at the south end of the southeast approach slab sidewalk III C 5 Fill and stabilize undermining of the approach sidewalks at the southwest, southeast, northwest, and northeast approaches III C 6 Repair the approach sidewalk panels to provide a smooth walking surface III C 7 Remove / paint over graffiti on the west face of the west barrier IV B 8 Replace guardrail Posts 10 and 12 at the southeast approach II D 9 Protect guardrail posts to eliminate impact hazard for pedestrians II D 10 Provide an object marker at the southeast approach II D 2 2 8 9 10 1 3,5 3,5 4,6 Brdg 775713 Pay Item Description Unit Quantity Rate Total Group II D 460 -112 Anchor Bolt Replacement EA 16 $ 621.33 $ 9,941.28 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 4.0 $ 400.00 $ 1,600.00 536 -83 -1 Guardrail Post Replacement, Regular EA 2 $ 50.00 $ 100.00 515 -1 -1 Pipe Handrail - Guiderail, Steel LF 300 $ 48.57 $ 14,571.00 705 -10 -3 Object Marker, Type 3 EA 1 $ 163.66 $ 163.66 Sub -Total $ 26,375.94 Group III C 458 -1 -21 Bridge Deck Expansion Joint, Rehabilitation, Poured Joint with Backer Rod LF 20 $ 56.16 $ 1,123.20 142 -70 Fill Sand CY 3 $ 49.83 $ 149.49 514 -71 -2 Plastic Filter Fabric, Stabilization SY 13 $ 5.89 $ 76.57 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.3 $ 400.00 $ 120.00 Sub -Total $ 1,469.26 Group IV B 563 -4 Anti - Graffiti Coating, Non - Sacrificial SF 120 $ 0.95 $ 114.00 Sub -Total $ 114.00 TOTAL $ 27,959.20 S: \Work - Florida \City of Winter Springs \Excel \Bridge Repair Cost Estimate s.xlsBrdg 775713 VOLKERT Project No.: 453100.63 Description: Hayes Rd over Gee Creek Designer: MME Date: 12.17.14 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 No. Inspector Recommendations Priority 1 Clean and paint flat washers for the handrails base plate anchor bolts IV A 2 Fill and stabilize undermining southwest, northwest, and northeast approach sidewalks III C 3 Fill and stabilize the erosion behind the southwest, northwest, and northeast wingwalls III C 2,3 2,3 Bridge 775714 Pay Item Description Unit Quantity Rate Total Group III C 142 -70 Fill Sand CY 17 $ 49.83 $ 847.11 514 -71 -2 Plastic Filter Fabric, Stabilization SY 9 $ 5.89 $ 53.01 Sub -Total $ 900.12 Group IV A 561 -2 Coating Existing Structural Steel SF 6 $ 50.00 $ 300.00 Sub -Total $ 300.00 TOTAL $ 1,200.12 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsBrdg 775714 VOLKERT Project No.: 453100.63 Description: Moss Road over Gee Creek Designer: MME Date: 12.17.14 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 01.07.15 No. Inspector Recommendations Priority 1 Replace the missing anchor bolt at the left aluminum bicycle rail Post 10 II D 2 Tighten the anchor bolt nuts at left rail Posts 9, 10, and 11 II D 3 Repair the open joints at both fascias at the interfaces with the arches III C 4 Repair the vertical cracks at the arch interfaces at both sides of the structure III A 5 Clean and paint the exposed steel in the spall at the west end of Arch 2 III A 6 Remove loose concrete and repair delamination in the north end of the sidewalk III C 7 Remove any unsound concrete and repair delaminations and failed repairs at the wingwall interfaces III A 8 Fill and stabilize undermining of the southwest, northwest, and northeast approach sidewalks III C 9 Replace one fractured sidewalk panel at the southwest approach III C 10 Fill and stabilize the void between northeast guardrail Posts 2 and 3 II D 4 4 5,7 3 6 8 8 9 Brda 775715 Pay Item Description Unit Quantity Rate Total Group II D 460 -112 Anchor Bolt Replacement EA 6 $ 621.33 $ 3,727.98 142 -70 Fill Sand CY 1 $ 49.83 $ 49.83 514 -71 -2 Plastic Filter Fabric, Stabilization SY 1 $ 5.89 $ 5.89 Sub -Total $ 3,783.70 Group III A 411 -1 Epoxy material for Crack Injection - Structures Rehab GA 3 $ 141.67 $ 425.01 411 -2 Cracks Inject & Seal - Structures Rehab LF 9 $ 46.69 $ 420.21 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.3 $ 400.00 $ 120.00 Sub -Total $ 965.22 Group III C 400 -4 -1 Concrete Class IV, Culverts CY 0.2 $ 1,285.83 $ 257.17 401 -70 -5 Restore Spalled Areas, Contractor's Option CF 0.1 $ 400.00 $ 40.00 142 -70 Fill Sand CY 1 $ 49.83 $ 49.83 514 -71 -2 Plastic Filter Fabric, Stabilization SY 1 $ 5.89 $ 5.89 522 -1 Concrete Sidewalk and Driveways, 4" Thick SY 3 $ 33.20 $ 99.60 Sub -Total I $ 452.49 TOTAL $ 5,201.41 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsBrdg 775715 No 1 2 3 VOLKERT Project No.: 453100.63 Description: Shore Road over Gee Creek Designer: MME Date: 04.10.15 Inspector Recommendations Clean and seal all culvert joints Fill and stabilize along the west toe wall Fill and stabilize the undecut area, northeast channel bank at the structure Install erosion countermeasures east side of the structure to prevent undermining DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 04.15.15 Priority III C III C III C III C Pay Item IDescription I Unit I Quantity Rate Total Group III C 411 -1 Epoxy material for Crack Injection - Structures Rehab GA 15 $ 141.67 $ 2,125.05 411 -2 Cracks Inject & Seal - Structures Rehab LF 273 $ 46.69 $ 12,746.37 142 -70 Fill Sand CY 2 $ 49.83 $ 99.66 514 -71 -2 Plastic Filter Fabric, Stabilization SY 5 $ 5.89 $ 29.45 400 -4 -1 Concrete Class IV, Culverts CY 0.7 $ 1,285.83 $ 900.08 530 -3 -4 Rip Rap - Rubble, F &I, Ditch Lining TN 1.4 $ 81.99 $ 114.79 Sub -Total $ 16,015.40 TOTAL $ 16,015.40 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsShore Rd ovr Gee Creek VOLKERT Project No.: 453100.63 Description: Alton Road over Gee Creek Designer: MME Date: 04.10.15 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 04.15.15 No. Inspector Recommendations Priority 1 Repair the crumbling south sidewalk over the structure III C 2 Remove dirt, vegetation, and trees restricting flow both channels III A Pay Item Description Unit Quantity Rate Total Group III A 110 -1 -1 Clearing & Grubbing AC 0.04 $ 8,322.45 $ 332.90 Sub -Total $ 332.90 Group III C 522 -1 Concrete Sidewalk and Driveways, 4" Thick SY 4 $ 33.20 $ 132.80 Sub -Total $ 132.80 TOTAL $ 465.70 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsAlton Rd ovr Gee Creek VOLKERT Project No.: 453100.63 Description: Costa Rica Drive over Gee Creek Designer: MME Date: 04.10.15 DESIGN COMPUTATIONS Sheet No: of Checker: MSL Date: 04.15.15 No. Inspector Recommendations Priority 1 Install /replace any missing sand bags north channel under structure III C 2 Remove aluminum curtain walls to allow observation of the condition of the back walls III A Pay Item Description Unit Quantity Rate Total Group III A 110 -3 Removal of Existing Structure SF 281 $ 21.91 $ 6,156.71 Sub -Total $ 6,156.71 Group III C 142 -70 Fill Sand CY 5 $ 49.83 $ 249.15 514 -71 -2 Plastic Filter Fabric, Stabilization SY 7 $ 5.89 $ 41.23 530 -1 Rip Rap, Sand - Cement CY 4.5 $ 559.84 $ 2,519.28 Sub -Total $ 2,809.66 TOTAL $ 8,966.37 S: \Work - Florida \City of Winter S pri ngs\Excel\B ridge Repair Cost Estimates.xlsCosta Rica Dr ovr Gee Creek APPENDIX C FDOT FLORIDA DEPARTMENT OF TRANSPORTATION TRANSPORTATION COSTS REPORTS Bridge Costs A highway bridge is defined as any span of 20 feet or more in length. Not all bridges go over bodies of water. Overpasses and ramps that are part of highway interchanges are bridges too. A large proportion of the statewide highway construction budget, usually in excess of 20 %, is devoted to bridge construction. Typically, the FDOT completes between 100 and 200 bridges each year. As a rule of thumb, bridges from 20 to 45 feet in length are short span bridges. Bridges from 45 to 150 feet are medium span bridges, and those extending over 150 feet are long span bridges. In recent years, the overall trend has been an increase in bridge construction costs. However, a few categories of costs have decreased. These estimates, based on FDOT experience, are only provided for use in preliminary planning, and should not be used as a substitute for detailed engineering estimates. New Construction (Cost per Square Foot) Bridge Type Low High Short Span Bridges: Reinforced Concrete Flat Slab Simple Span* $115 $160 Pre -cast Concrete Slab Simple Span* $110 $200 Reinforced Concrete Flat Slab Continuous Span* NA NA Medium and Long Span Bridges: Concrete Deck/ Steel Girder - Simple Span* $125 $142 Concrete Deck/ Steel Girder - Continuous Span* $135 $170 Concrete Deck/ Pre - stressed Girder - Simple Span $90 $145 Concrete Deck/ Pre - stressed Girder - Continuous Span $95 $211 Concrete Deck/ Steel Box Girder — Span Range from 150' to 280' (for curvature, add a 15% premium) $140 $180 Segmental Concrete Box Girders - Cantilever Construction, Span Range from 150' to 280' $140 $160 Movable Bridge - Bascule Spans and Piers $1,800 $2,000 * Increase the cost by twenty percent for phased construction. http: / /www.dot.state.f1.us /planning /policy /costs April 29, 2014 FDOT Li FLORIDA DEPARTMENT OF TRANSPORTATION TRANSPORTATION COSTS REPORTS Bridge Demolition and Widening (Cost per Square Foot) Bridge Demolition: Low High Typical Bridge Removal $35 $60 Movable Span Bridge (Bascule) $60 $70 Widening: Bridge Widening Construction $85 $160 FOR FURTHER INFORMATION: Structures Design Guidelines, FDOT Structures Manual, Volume 1, January 2014 http: / /www.dot.state.fl. us/ structures/ StructuresManual /CurrentRelease /Vol1 SDG.pdf CONTACT: Martin Markovich, Office of Policy Planning (850) 414 -4918, martin .markovich(a) dot. state. fl. us http: / /www.dot.state.f1.us /planning /policy /costs April 29, 2014 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Northern Way South Loop Howell Creek Bridge No.: 775703 EXISTING DIMENSIONS Total Bridge Length 46.2 Out to Out Width 35.2 REPLACEMENT DIMENSIONS Total Bridge Length 46.2 Out to Out Width 44.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 2032.8 $125 $254,100 Demolition 1626.24 $35 $56,918 Bridge Cost Subtotal: $311,018 Utilities @ 5% $15,551 Roadway @ 10% $31,102 Subtotal: $357,671 MOT @ 10% $35,767 Mobilization @ 10% $39,344 Subtotal: $432,782 Contigency @ 30% $129,835 Total Construction Cost: $562,617 Design @ 15% $84,393 CEI @ 15% $84,393 GRAND TOTAL $731,402 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Murphy Rd Gee Creek Bridge No.: 775704 EXISTING DIMENSIONS Total Bridge Length 41.3 Out to Out Width 40.0 REPLACEMENT DIMENSIONS Total Bridge Length 41.3 Out to Out Width 44.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 1817.2 $140 $254,408 Demolition 1652 $35 $57,820 Bridge Cost Subtotal: $312,228 Utilities @ 5% $15,611 Roadway @ 10% $31,223 Subtotal: $359,062 MOT @ 10% $35,906 Mobilization @ 10% $39,497 Subtotal: $434,465 Contigency @ 30% $130,340 Total Construction Cost: $564,805 Design @ 15% $84,721 CEI @ 15% $84,721 GRAND TOTAL $734,246 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected South Edgemon Ave Gee Creek Bridge No.: 775705 EXISTING DIMENSIONS Total Bridge Length 37.4 Out to Out Width 37.0 REPLACEMENT DIMENSIONS Total Bridge Length 37.4 Out to Out Width 44.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 1645.6 $140 $230,384 Demolition 1383.8 $35 $48,433 Bridge Cost Subtotal: $278,817 Utilities @ 5% $13,941 Roadway @ 10% $27,882 Subtotal: $320,640 MOT @ 10% $32,064 Mobilization @ 10% $35,270 Subtotal: $387,974 Contigency @ 30% $116,392 Total Construction Cost: $504,366 Design @ 15% $75,655 CEI @ 15% $75,655 GRAND TOTAL $655,676 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Sheoah Blvd Sheoah Creek Bridge No.: 775707 EXISTING DIMENSIONS Total Bridge Length 45.3 Out to Out Width 34.6 REPLACEMENT DIMENSIONS Total Bridge Length 45.3 Out to Out Width 44.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 1993.2 $125 $249,150 Demolition 1567.38 $35 $54,858 Bridge Cost Subtotal: $304,008 Utilities @ 5% $15,200 Roadway @ 10% $30,401 Subtotal: $349,610 MOT @ 10% $34,961 Mobilization @ 10% $38,457 Subtotal: $423,028 Contigency @ 30% $126,908 Total Construction Cost: $549,936 Design @ 15% $82,490 CEI @ 15% $82,490 GRAND TOTAL $714,917 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Shepard Rd Sheoah Creek Bridge No.: 775708 EXISTING DIMENSIONS Total Bridge Length 45.6 Out to Out Width 34.6 REPLACEMENT DIMENSIONS Total Bridge Length 45.6 Out to Out Width 44.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 2006.4 $125 $250,800 Demolition 1577.76 $35 $55,222 Bridge Cost Subtotal: $306,022 Utilities @ 5% $15,301 Roadway @ 10% $30,602 Subtotal: $351,925 MOT @ 10% $35,192 Mobilization @ 10% $38,712 Subtotal: $425,829 Contigency @ 30% $127,749 Total Construction Cost: $553,578 Design @ 15% $83,037 CEI @ 15% $83,037 GRAND TOTAL $719,651 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Northern Way North Loop Howell Creek Bridge No.: 775709 EXISTING DIMENSIONS Total Bridge Length 90.3 Out to Out Width 36.4 REPLACEMENT DIMENSIONS Total Bridge Length 90.3 Out to Out Width 44.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 3973.2 $125 $496,650 Demolition 3286.92 $35 $115,042 Bridge Cost Subtotal: $611,692 Utilities @ 5% $30,585 Roadway @ 10% $61,169 Subtotal: $703,446 MOT @ 10% $70,345 Mobilization @ 10% $77,379 Subtotal: $851,170 Contigency @ 30% $255,351 Total Construction Cost: $1,106,521 Design @ 15% $165,978 CEI @ 15% $165,978 GRAND TOTAL $1,438,477 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Northern Way Bear Creek Bridge No.: 775710 EXISTING DIMENSIONS Total Bridge Length 90 Out to Out Width 36.4 REPLACEMENT DIMENSIONS Total Bridge Length 90 Out to Out Width 44.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 3960 $125 $495,000 Demolition 3276 $35 $114,660 Bridge Cost Subtotal: $609,660 Utilities @ 5% $30,483 Roadway @ 10% $60,966 Subtotal: $701,109 MOT @ 10% $70,111 Mobilization @ 10% $77,122 Subtotal: $848,342 Contigency @ 30% $254,503 Total Construction Cost: $1,102,844 Design @ 15% $165,427 CEI @ 15% $165,427 GRAND TOTAL $1,433,698 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Winter Springs Blvd Howell Creek Bridge No.: 775711 EXISTING DIMENSIONS Total Bridge Length 135.5 Out to Out Width 47.9 REPLACEMENT DIMENSIONS Total Bridge Length 135.5 Out to Out Width 47.9 min. REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 6490.45 $125 $811,306 Demolition 6490.45 $35 $227,166 Bridge Cost Subtotal: $1,038,472 Utilities @ 5% $51,924 Roadway @ 10% $103,847 Subtotal: $1,194,243 MOT @ 10% $119,424 Mobilization @ 10% $131,367 Subtotal: $1,445,034 Contigency @ 30% $433,510 Total Construction Cost: $1,878,544 Design @ 15% $281,782 CEI @ 15% $281,782 GRAND TOTAL $2,442,107 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Winter Springs Blvd Bear Creek Bridge No.: 775712 EXISTING DIMENSIONS Total Bridge Length 70 Out to Out Width 51.7 REPLACEMENT DIMENSIONS Total Bridge Length 70 Out to Out Width 51.7 min. REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 3619 $125 $452,375 Demolition 3619 $35 $126,665 Bridge Cost Subtotal: $579,040 Utilities @ 5% $28,952 Roadway @ 10% $57,904 Subtotal: $665,896 MOT @ 10% $66,590 Mobilization @ 10% $73,249 Subtotal: $805,734 Contigency @ 30% $241,720 Total Construction Cost: $1,047,454 Design @ 15% $157,118 CEI @ 15% $157,118 GRAND TOTAL $1,361,691 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Winding Hollow Blvd Little Lake Howell Creek Bridge No.: 775713 EXISTING DIMENSIONS Total Bridge Length 40.0 Out to Out Width 40.5 REPLACEMENT DIMENSIONS Total Bridge Length 40.0 Out to Out Width 50.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 2000 $125 $250,000 Demolition 1620 $35 $56,700 Bridge Cost Subtotal: $306,700 Utilities @ 5% $15,335 Roadway @ 10% $30,670 Subtotal: $352,705 MOT @ 10% $35,271 Mobilization @ 10% $38,798 Subtotal: $426,773 Contigency @ 30% $128,032 Total Construction Cost: $554,805 Design @ 15% $83,221 CEI @ 15% $83,221 GRAND TOTAL $721,246 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Hayes Rd Gee Creek Bridge No.: 775714 EXISTING DIMENSIONS Total Bridge Length 28.0 Out to Out Width 48.0 REPLACEMENT DIMENSIONS Total Bridge Length 28.0 Out to Out Width 50.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 1400 $140 $196,000 Demolition 1344 $35 $47,040 Bridge Cost Subtotal: $243,040 Utilities @ 5% $12,152 Roadway @ 10% $24,304 Subtotal: $279,496 MOT @ 10% $27,950 Mobilization @ 10% $30,745 Subtotal: $338,190 Contigency @ 30% $101,457 Total Construction Cost: $439,647 Design @ 15% $65,947 CEI @ 15% $65,947 GRAND TOTAL $571,541 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 12.16.14 Checker: MSL Date: 01.07.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Moss Rd Gee Creek Bridge No.: 775715 EXISTING DIMENSIONS Total Bridge Length 49.5 Out to Out Width 41.0 REPLACEMENT DIMENSIONS Total Bridge Length 49.5 Out to Out Width 50.0 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 2475 $140 $346,500 Demolition 2029.5 $35 $71,033 Bridge Cost Subtotal: $417,533 Utilities @ 5% $20,877 Roadway @ 10% $41,753 Subtotal: $480,162 MOT @ 10% $48,016 Mobilization @ 10% $52,818 Subtotal: $580,996 Contigency @ 30% $174,299 Total Construction Cost: $755,295 Design @ 15% $113,294 CEI @ 15% $113,294 GRAND TOTAL $981,884 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 04.10.15 Checker: MSL Date: 04.13.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Shore Rd Gee Creek Bridge No.: N/A EXISTING DIMENSIONS Total Bridge Length 19.1 Out to Out Width 90.1 REPLACEMENT DIMENSIONS Total Bridge Length 19.1 Out to Out Width 90.1 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 1720.91 $80 $137,673 Demolition 1720.91 $35 $60,232 Bridge Cost Subtotal: $197,905 Utilities @ 5% $9,895 Roadway @ 10% $19,790 Subtotal: $227,590 MOT @ 10% $22,759 Mobilization @ 10% $25,035 Subtotal: $275,384 Contigency @ 30% $82,615 Total Construction Cost: $358,000 Design @ 15% $53,700 CEI @ 15% $53,700 GRAND TOTAL $465,400 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 04.10.15 Checker: MSL Date: 04.13.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Alton Rd Gee Creek Bridge No.: N/A EXISTING DIMENSIONS Total Bridge Length 19.7 Out to Out Width 91.5 REPLACEMENT DIMENSIONS Total Bridge Length 19.7 Out to Out Width 91.5 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 1802.55 $80 $144,204 Demolition 1802.55 $35 $63,089 Bridge Cost Subtotal: $207,293 Utilities @ 5% $10,365 Roadway @ 10% $20,729 Subtotal: $238,387 MOT @ 10% $23,839 Mobilization @ 10% $26,223 Subtotal: $288,449 Contigency @ 30% $86,535 Total Construction Cost: $374,983 Design @ 15% $56,247 CEI @ 15% $56,247 GRAND TOTAL $487,478 VOLKERT DESIGN COMPUTATIONS Job No.: 453100.63 Sheet No: of Description: Bridge Master Plan Designer: MME Date: 04.10.15 Checker: MSL Date: 04.13.15 BRIDGE REPLACEMENT COST ESTIMATE Facility Carried Facility Intersected Costa Rica Dr Gee Creek Bridge No.: N/A EXISTING DIMENSIONS Total Bridge Length 29.3 Out to Out Width 28.1 REPLACEMENT DIMENSIONS Total Bridge Length 29.3 Out to Out Width 28.1 REPLACEMENT DECK AREAS SQ. FT. Unit Price Cost Deck Area 823.33 $125 $102,916 Demolition 823.33 $35 $28,817 Bridge Cost Subtotal: $131,733 Utilities @ 5% $6,587 Roadway @ 10% $13,173 Subtotal: $151,493 MOT @ 10% $15,149 Mobilization @ 10% $16,664 Subtotal: $183,306 Contigency @ 30% $54,992 Total Construction Cost: $238,298 Design @ 15% $35,745 CEI @ 15% $35,745 GRAND TOTAL $309,787 APPENDIX D TOTALANNUAL WORK PRIORITY - REPAIR COSTS EMERGENCY URGENT ROUTINE INFORMATIONAL BRIDGE NUMBER IA IB IC IIA IIB IIC IID IIIA IIIB IIIC IVA IVB Repair Total years >> 1 1 1 2 3 3 3 8 10 775703 $842 $3,987 $1,546 $6,375 775704 $1,500 $3,880 $1,457 $6,837 775705 $1,100 $80 $16 $1,196 775707 $1,300 $4,167 $1,141 $6,608 775708 $1,600 $206 $1,806 775709 $814,772 $6,719 $1,723 $3,123 $826,337 775710 $10,825 $1,189 $1,001 $163 $3,112 $16,290 775711 $2,372 $1,607 $200 $361 $6,166 $10,706 775712 $20,686 $1,921 $163 $22,770 775713 $26,376 $1,469 $114 $27,959 775714 $900 $300 $1,200 775715 $3,784 $965 $452 $5,201 SHORE RD OVER GEE CREEK $16,015 $16,015 ALTON RD OVER GEE CREEK $333 $133 $466 COSTA RICA DR OVER GEE CREEK $6,157 $2,810 $8,967 BASIC REPAIR SUBTOTALS $0 $0 $0 $0 $837,830 $0 $48,092 $20,365 $0 $36,618 $1,767 $14,061 $958,733 MOBILIZATION (10%): $0 $0 $0 $0 $83,783 $0 $4,809 $2,037 $0 $3,662 $177 $1,406 $95,873 MAINTENANCE OF TRAFFIC (10%): $0 $0 $0 $0 $83,783 $0 $4,809 $2,037 $0 $3,662 $177 $1,406 $95,873 CONTIGENCIES(50 %) $0 $0 $0 $0 $418,915 $0 $24,046 $10,183 $0 $18,309 $884 $7,031 $479,367 PRICE ESCALLATION (10 %) $0 $0 $0 $0 $83,783 $0 $4,809 $2,037 $0 $3,662 $177 $1,406 $95,873 DESIGN (15 %) $0 $0 $0 $0 $125,675 $0 $7,214 $3,055 $0 $5,493 $265 $2,109 $143,810 CEI (15 %) $0 $0 $0 $0 $125,675 $0 $7,214 $3,055 $0 $5,493 $265 $2,109 $143,810 REPAIR TOTALS $0 $0 $0 $0 $1,759,443 $0 $100,993 $42,767 $0 $76,898 $3,711 $29,528 $2,013,339 AVERAGE ANNUAL AMOUNTS $0 $0 $0 $0 $1,759,443 $0 $50,497 $14,256 $0 $25,633 $464 $2,953 $1,853,244 TOTALANNUAL APPENDIX E REPLACEMENT YEARS Structure # Facility Carried Envir. & Feature Intersected Str Type Str Eval Environ Yr Built / Rehab Init Repl Yr Str Type Str Eval Repl Yr Yrs to Repl 775703 Northern Way South Loop Howell Creek 522 4 fresh water 1973 2048 0 -25 2023 8 775704 Murphy Rd Gee Creek 119 7 fresh water 1973 2048 0 0 2048 33 775705 South Edgemon Ave Gee Creek 119 7 fresh water 1973 2048 0 0 2048 33 775707 Sheoah Blvd Sheoah Creek 501 7 fresh water 1972 2047 0 0 2047 32 775708 Shepard Rd Sheoah Creek 501 5 fresh water 1972 2047 0 -10 2037 22 775709 Northern Way North Loop Howell Creek 501 6 fresh water 1981 2056 0 -5 2051 36 775710 Northern Way Bear Creek 501 7 fresh water 1981 2056 0 0 2056 41 775711 Winter Springs Blvd Howell Creek 501 7 fresh water 1982 2057 0 0 2057 42 775712 Winter Springs Blvd Bear Creek 501 7 fresh water 1987 2062 0 0 2062 47 775713 Winding Hollow Blvd Little Lake Howell Creek 501 7 fresh water 1995 2070 0 0 2070 55 775714 Hayes Rd Gee Creek 119 7 Ifresh water 1997 2072 0 1 0 2072 57 775715 Moss Rd Gee Creek 119 7 fresh water 1998 2073 0 0 2073 58 N/A Shore Rd Gee Creek 119 8 fresh water 1979 2054 0 0 2054 39 N/A Alton Rd Gee Creek 119 8 fresh water 1973 2048 0 0 2048 33 N/A Costa Rica Dr Gee Creek 504 8 fresh water 1973 2048 0 0 1 2048 33 S: \Work - Florida \City of Winter Springs \Excel \[Bridge Replacement Annualized Costs. xls]Replacement Years ANNUALIZED REPLACEMENT COSTS Structure # Facility Carried Re pi Yr Yrs to Re pi Re pi Cost 2015 All Br id es 775703 Northern Way South Loop 2023 8 $731,402 $91,425 775704 Murphy Rd 2048 33 $734,246 $22,250 775705 South Ed emon Ave 2048 33 $655,676 $19,869 775707 Sheoah Blvd 2047 32 $714,917 $22,341 775708 Shepard Rd 2037 22 $719,651 $32,711 775709 Northern Way North Loo 2051 36 $1,438,477 $39,958 775710 Northern Way 2056 41 $1,433,698 $34,968 775711 Winter Springs Blvd 2057 42 $2,442,107 $58,145 775712 Winter Springs Blvd 2062 47 $1,361,691 $28,972 775713 Winding Hollow Blvd 2070 55 $721,246 $13,114 775714 Hayes Rd 2072 57 $571,541 $10,027 775715 Moss Rd 2073 58 $981,884 $16,929 N/A Shore Rd 2054 39 $465,400 $11,933 N/A Alton Rd 2048 33 $487,478 $14,772 N/A Costa Rica Dr 2048 33 $309,787 $9,387 Totals $13,769,201 $426,803 S: \Work - Florida \City of Winter Springs \Excel \[Bridge Replacement Annualized Costs.xls] Replacement Years