Loading...
HomeMy WebLinkAbout2015 05 11 Consent 307 Sewer Relining 2015COMMISSION AGENDA ITEM 307 REQUEST: Informational Consent X Public Hearings Regular May 11, 2015 KS KL Regular Meeting City Manager Department The Utility Department is requesting authorization to procure the services of Layne Inliner, LLC to perform Sanitary Sewer Line Rehab Work by Piggybacking off of the City of Orlando Contract for Cured -in -Place Pipe rehabilitation. SYNOPSIS: The purpose of this Agenda Item is to request authorization to piggyback off of the City of Orlando Contract No. IFB 15 -0017 with Layne Inliner, LLC for relining of sanitary sewer lines at a cost of $196,660.00. CONSIDERATIONS: This project is needed for the on -going maintenance and rehabilitation of the City's sanitary sewer collection system. The Utility Department budgets annually for sewer line rehabilitation. The Cured -in -Place process, a trenchless technology, is the preferred method of rehabilitating the sewer lines by the City. The Cured -in -Place process is a folded, resin impregnated fabric that is pulled through the existing sewer line and expanded and cured in place. No excavating, digging or restoration is required which minimizes any inconvenience to our residents. The amount of sanitary sewer mains we intend to rehab at this time are as follows: 4,116 feet of 8 ", 1,250 feet of 10" and 52 feet of 12 ". The cost for lining per lineal foot is $35.00 for 8 ", $40.00 per lineal foot for 10" and $50.00 per lineal foot for 12 ", same as last year. The total cost for this sanitary sewer rehabilitation project will be $196,660.00. The locations are on Pearl Road, Alton Road, Shore Road, Power Easement near Winding Hollow, and Gumtree Court. These pipes and structures average 35 to 40 years old and are Consent 307 PAGE 1 OF 2 - May 11, 2015 clay pipe which makes them subject to cracking and leaking. FISCAL IMPACT: The Utility Department has budgeted $250,000 in the Renewal and Replacement Fund for sewer and manhole relining for FY 2015. The project cost of $196,660.00 will be paid from this fund. Funds will be expended over the next 120 days. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, eAlert/eCitizen Recipients, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. In addition, residents in the affected areas will be notified prior to the work being performed. RECOMMENDATION: It is recommended that authorization be granted to piggyback off of the City of Orlando Contract No. IFB 15 -0017 with Layne Inliner, LLC for the rehabilitation of sanitary sewer lines at a cost of $196,660.00 plus a 10% contingency payable from the Utility Enterprise Fund Pipe Relining CIP line code (410 -36- 3600 - 560650 -005). ATTACHMENTS: 1. Sewer Relining Proposal (1 page) Consent 307 PAGE 2 OF 2 - May 11, 2015 Ly► liner PROPOSAL DATE: April 27, 2015 SUBMITTED TO: City of Winter Springs 1126 E. SR 434 Winter Springs, FL 32708 Attn: Kevin Monser Meter Services Teamleader JOB LOCATION: Winter Springs Sanitary 2015 We propose hereby to furnish material and labor - complete in accordance with specifications below, for the sum of One Hundred Ninety -Six Thousand Six Hundred Sixty dollars and no cents ($196,660.00) Payment terms - 100% within thirty (30) days upon completion and acceptance. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Anx alteration or deviation from specifications below involving extra costs will be executed only upon wvritten orders, and vvill become an extra charse over and above the estimate. All agreements comineent upon strikes. accidents or dela}s beyond our control Owner to carve fire. tornado and other necessai- insurance. Our Aorkers are full covered b_v Workman's Compensation insurance. Note: This proposal mac be withdrawn b} us if not accepted within thiriv i30i days. We hereby submit specifications and estimates as follows: Layne Inliner, LLC shall supply all equipment, materials and labor as follows: DESCRIPTION QTY UNIT PRICE TOTAL Item #1 — Furnish /Install 8" x 6 mm CIPP 4,116 LF S35.00 $144,060.00 Item 44 — Furnish /Install 10" x 6 mm CIPP 1,250 LF 540.00 $50,000.00 Item #7 — Furnish /Install 12" x 6 mm CIPP 52 LF $50.00 52,600.00 TOTAL S196,660.00 NOTES: 1. Pricing based on prices contained in a contract between Layne Inliner, LLC and the City of Orlando contract number IFB15-001 2. Inliner to be installed as per ASTM, manufacturer's specifications and contract specifications. 3. Lining subject to a Pre -TV inspection by Layne Inliner, LLC indicating the line conditions are acceptable for installation of Inliner. 4. Work performed does not include point repairs if required prior to installing Inliner. 5. Layne Inliner, LLC shall furnish the City of Winter Springs with a Final Ins n D of the rehabilitated sewer line(s). S i gnat ore mmv Robertson, Pr4eet Llann.1 Acceptance of Proposal - The above prices, specifications and conditions are satisfacton and are hereby accepted You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance Authorized Signature