HomeMy WebLinkAbout2015 07 27 Regular 601 Water Quality Improvements Task Order #1COMMISSION AGENDA ITEM 601 Informational Consent Public Hearings Regular X July 27, 2015 KS KL Regular Meeting City Manager Department REQUEST: The Utility Department requests the City Commission's authorization to execute a Task Order #1 of RFQ #005 /15BF with CPH, Inc. in the amount of $281,862.75 for the design of Water Treatment Plant No. 1 Water Quality Improvements. SYNOPSIS: Improvements to the potable water treatment process at Water Treatment No. 1 on Northern Way are required to meet Federal water quality parameters. The City is under a consent order with the State to lower the levels of Total Trihalomethanes in the water distribution system. This task order is for the design of those improvements. CONSIDERATIONS: This Task Order #1 of RFQ #005 /15BF is needed to initiate the Engineering Design for the Water Treatment Improvements to Water Treatment Plant No. 1 (WTP1) that are needed to reduce the levels of Total Trihalomethanes (TTHMs) at the remote sampling points in the system. TTHM samples are collected at the four most remote locations in the City on a quarterly basis and the results of these samples to are reported to the Florida Department of Environmental Protection (FDEP). In 2014, the Environmental Protection Agency implemented changes to the formula methodology used to determine compliance - no longer could the results of the four locations be averaged. Since that time we have unable to consistently remain below the regulatory TTHM threshold of 80 parts per billion (ppb) despite implementing low cost operational improvements and enhancements that improved TTHM levels but not on a consistent basis. Regular 601 PAGE 1 OF 3 - July 27, 2015 The inability to consistently be in compliance with TTHM thresholds triggered a Consent Order from FDEP in April 2015 requiring the construction of water quality improvements to come into compliance. These improvements must be completed by April 2017. The quarterly notice of violation forms sent to all customers is also a result of the TTHM compliance violations and they will continue to be sent every quarter until the TTHM test result averages for four consecutive quarters are below the 80 ppb. CPH was previously engaged to evaluate the operational changes and determine if other opportunities existed that would bring us into compliance in lieu of the large capital expenditures that were anticipated. We unsuccessfully exhausted all of those opportunities. During this optimization process, CPH also evaluated the advantages and disadvantages of the various treatment technologies used by surrounding utilities. A matrix of this evaluation is attached. Based on the information gathered to date, the current recommendation is to construct an ion exchange unit at WTP1 that will remove the precursors that combine with chlorine and form the disinfection byproducts including TTHMs. Included in this design proposal is a pilot test of an ion exchange unit that will confirm the precursor removal assumptions prior to proceeding with full design of the ion exchange process. The scope of work for this water quality improvements task order includes engineering design and permitting, electrical engineering, geotechnical, State Revolving Fund Loan application assistance, Ion Exchange Pilot Testing and Assistance, and Bidding Assistance. The fee for this scope of work is $281,862.75. FISCAL IMPACT: The cost for Task Order #1 Water Quality Improvements is $281,862.75 which will be funded from the Utility Enterprise Fund. A preliminary estimate of the construction cost is $6,000,000 and a Loan from the State Revolving Fund will be pursued for the construction funding. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. Regular 601 PAGE 2 OF 3 - July 27, 2015 The Utility Department recommends the City Commission authorize the execution of Task Order #1 of RFQ #005 /15BF with CPH, Inc. in the amount of $281,862.75 for the design of Water Treatment Plant No. 1 Water Quality Improvements including, a supplemental appropriation from the Utility Enterprise fund balance of $281,862.75 and the City Manager and City Attorney to execute any and all documents needed for this task order. ATTACHMENTS: 1. Task Order 1 - WTP 1 Treatment Improvements (37 pages) 2. Treatment Alternatives Matrix (1 page) Regular 601 PAGE 3 OF 3 - July 27, 2015 Attachment No. 1 This Task Order 1 dated by and between the City of Wint i (hereinafter called the OWNER) and CPH, Inc. (hereinafter called the Engineer) i agreed upon and declared an authorized Task Order based on the Profession Services for Potable Water Quality Improvements Agreement dated The appropriate provisions of the Agreement apply as fully as if repeated herein. 1-1 The Staff has worked to improve the chlorination system and optimize chemic": addition to achieve the required levels of disinfection without forming THMs a HAAs that exceed the drinking water standards. These initial and si I �J mpl methods have rn oved the water awilL W W.Wer i _P - a LJS!s�MM F I 2.1 GENERAL 2.1.1 ENGINEER agrees to perform professional services in connection with the project as hereinafter stated. ts MONAMA The OWNER hereby authorizes the ENGINEER to proceed with the preparation of plans and specifications for WTP 1 improvements as listed below. 3.1.1 The project includes the followin"n C 2. 1 Retain the services of a Geotechnical Consultant to provide data on existing soils conditions/type for the purpose of placing structures. A copy of the scope for the services is included as an attachment. 3.2.7 Reconfigure the corrosion control equipment and the chlorine injection points as part of the design to comply with the new improvements. Also move the feed systems for chlorine and corrosion control to the new containment structure. 3.3.1 Assist the OWNER in the preparation • an FDEP Drinking Water construction permit. Permit application submittal shall be based on the 90% plans and specifications. C. 3.2 Respond to reasonable requests for additional information from the FDEP. We estimate that FDEP will take approximately 30 days to review the plans and provide comments. 3.3.3 Proposed improvements at the facility do not surpass the thresholds for an Environmental Resource Permit (ERP). Therefore no storm water permit is anticipated. 3.4.1 Provide electronic Bid Documents for use by the City in their bidding process 3.4.2 Prepare for, coordinate and attend a pre-bid conference for the project. 3.5.1 Provide the SRF planning and documentation services shown and described in the manhour schedules and also described in Attachment C. This document was obtained from the FDEP SRF Drinking Water website. A 3.6.2 OWNER will provide all manpower and equipment for connecting the unit to t raw water supply and discharge piping to the ground. I 3.6.3 OWNER will provide all labor to retrieve samples and deliver to a laboratory. C6.4 OWNER will provide all laboratory testing of samples as identified by Me ENGINEER. 3.6.5 OWNER will provide manpower to operate and maintain operation of the u M-1 during the testing period. 4.1 If authorized in writing by the OWNER prior to the rendering of such services, the ENGINEER will furnish or obtain under subcontracts, supplementary services which will be paid for by the OWNER. 4.1.1 Additional services due to significant changes in the scope of the project or its design including, but not limited to, changes in size, complexity, character ot construction • due to time delays in initiating or completion • the work as described herein. 4.1.2 Additional services in connection with the project including services normally furnished by the OWNER as described in Section 5 herein and services nu) otherwise provided for in this Task Order. 1. 5 Provide, through a subconsultant, additional surveying services if required or requested by the OWNER. 4.2.6 Provide, through a subconsultant, soils investigation services if required requested • the OWNER. i I- . 5.1.1 Advise the ENGINEER of his requirements for the project and designate a person to act as the OWNER's representative with respect to the work to be performed under this Task Order, and such person shall have complete authority to transmit instructions, receive information, interpret and define the OWNER's policies and decisions pertinent to the work covered by this Task Order. 5.1.2 Guarantee access to and make all provision for the ENGINEER to enter upon public and private lands as required for the ENGINEER to perform his work under this Task Order. 5.1.3 Provide data requested that is reasonably available on the existing utility systems, population and projections, land use and planning information. 5.1.4 Provide personnel to locate facilities and mow, trim, or otherwise make them accessible for inspection. 5.1.5 Examine all studies, reports, sketches, and other documents presented by the ENGINEER and render decisions pertaining thereto within a reasonable time so as not to delay the work of the ENGINEER. 5.1.6 Obtain approval of all governmental authorities having jurisdiction over the project, and such approvals and consents from such other individuals • bodies as may be necessary for completion of the Project. 5.1.7 Furnish, or direct the ENGINEER in writing to provide at the OWNER's expense, additional soils investigations if advised in writing by the ENGINEER that they are necessary • advisable. 5.1.8 Furnish, or direct the ENGINEER in writing to provide at the OWNER's expense, necessary additional services as stipulated in Section 4 of this Task Order, or other services as required. There are two parts to the fee, lump sum and hourly not to exceed. ffl�- 0 M lug 61;U11", Engineering A. Design and Permitting $ 172,901.25 Electrical $ 48,750.00 Geotechnical $ 1,975.00 TOTAL LUMP SUM FEE: $ 223,626.25 Bidding Assistance $ 11,099.00 SRF Assistance $ 20,433-00 Pilot Testing and Verification $ 26,704.00 TOTAL NOT TO EXCEED FEE: $ 58,236.50 T). 1. 2 The OWNER will make prompt monthly payments in response to ENGINEER's monthly statements without retention for all categories • services rendered under this Task Order and for reimbursable expenses incurred. 6.1.3 Charges for the services rendered by principals and employees as witnesses in any gation, hearing • proceeding in accordance with Paragraph 4.1.4 will be computed at a rate • $650.00 per day • any portion thereof (but compensation for time spent in preparing to appear in any such litigation, hearing • proceeding will be computed in accordance with standard billing rates. f,. 1. 5 The ENGINEER shall promptly begin work on the services authorized by this Task Order upon receipt of notice to proceed from the OWNER. 7.2 The OWNER and the ENGINEER each binds himself and his partners, successors, executors, administrators and assigns to the other party of this Task Order and to partners, successors, executors, administrators, and assigns of such other party in respect to all covenants of this Task Order. Nothing here shall be construed as creating any personal liability on the part of any officer agency • any public body which may be a party hereto, nor shall it • constru as giving any rights or benefits hereunder to anyone other than the OWNER anj the ENGINEER. M The ENGINEER agrees to prosecute the work in a timely manner until the Project is completed. IN WITNESS WHEREOF, the parties hereto have made and executed th Amendment the day and year first above written. i [OHM$ 0 AMM ATTACHMENT A • • r ' . D-1 Miscellaneous Details D-2 Miscellaneous Details D-3 Miscellaneous Details D-4 Miscellaneous Details D-5 Miscellaneous Details D-6 Miscellaneous Details D-7 Miscellaneous Details NJIJIL"1111- I IT, 0 . * I a . tz O CL 2 O a1 O 0 O .0c :3 I ull, tz a C�' 9 C> 00 Cs 61 67 cn Ln r ri W, X- Q r- W 0 m U) U) En C) • • AM AM O CL 2 .) c 0 a1 m 0) qy O .0c CL .2 U) 00 00 vD CN N co t5 ID IT as c ❑ E E cL 0 -r- g — 0 U) -0 LU w a) C. 0 'o . ❑ 75 V; o m 0- Q7 ca o H7 ou i2 T 0 C3 m E ro < 0 L) 0 $ U) R iA 2i CN m v to (D r.- co m ?A -U 0 >. a) W CL 0 2 X a. UJ UJ V7 C IL — — — — — — a C�' 9 C> 00 Cs 61 67 cn Ln r ri W, X- Q r- W 0 m U) U) En C) • • AM AM O CL 2 .) c 0 E m 0) qy .0c CL .2 U) w %-- M a) 2 0 0 a p 'm -6 2 ❑ E E cL 0 -r- g — 0 U) -0 LU w a) C. 0 'o . ❑ 75 V; o m 0- Q7 ca o H7 ou i2 T 0 C3 N 42 Co < 0 L) 0 $ U) R ran CN m v to (D r.- co m a C�' 9 C> 00 Cs 61 67 cn Ln r ri W, X- Q r- W 0 m U) U) En C) • • AM AM I., CD 5 � a) a) 2 LU C\l m C: cu 2 W 0 LU 0- CL 0.1 jj- 'Of = �— LU 0 0 0 UJ -J -0 0 00 c Ef) c En 0 cu 0 (1) El) CN m 1-1 a] m C: < (D 0fw Cl, o d C-4 Z) a) D) le fn U) 0 CIA w C) C) C) C) CD 0000 < (D CD V) V) CD 0 9 9 9 m o U.) a U-) 7ffi it " = a) 0 0 cq fl- W, a) a) I IT a a) 0 a) 0" U) UJI) 0' (n 0 a) r-) 0 a) L-: Cl) CD 5 � a) a) 2 LU C\l m C: cu 2 W 0 LU 0- CL 0.1 jj- 'Of = �— LU 0 0 0 UJ -J -0 0 00 c Ef) c En 0 cu 0 (1) El) CN m 1-1 a] m C: < (D 0fw Cl, o d C-4 Z) a) D) le fn U) 0 CIA w C) C) C) C) CD C) CD CD a C� < (D CD V) V) CD � 7ffi it " = a) 0 0 .9000m m 0 Lu (D a) 0 cu (L) 0" U) 'E 0' (n .1 C> Ln in 0 U, u N N U) C7 t6 4 d7 LD I m co r- 5F COO CO as Cl 0 x uj F- m U) w C/) • • mil wmm w 0 ♦ C) C) 0 0 C C� 0 C) CD C) LO LO (D �2 61oq 0. LO :3 C%j U3 CO • 0 .a 0 L) 6j- 04 '0' C\l C) BO aJ U) CO (0 00 00 00 OD NN IT -4 4° CN 04 OD (0 00 'q et CO 't Q Cp OD C%4 04 CIJ M M Ct 00 CN CN a) IT co Nt d) M (D co co (D 1\1 co co CO It It 'IT Nt Lo N C14 N 0 a3 C It CN C14 C14 CN r r Nr It 04 CD cc CN O E 0 W W X uj E r — — — — — — — — — — -- — M — N cl) — — — N IL TE Cl) CD (D :3 O C%) 0 E m -a -6 Cc: ca 0 0 iv 0- E E 2 -2 O CD U) > U) E v E c>D a ') -L) Ca 0 V) Ve 'D r < ch m (D -,5 a 10, — u U) 0 . z 0 (D w 0 ul 'r- co r- 0 M (D 73 8 .6 0 4) x la 5 'm w E J_- m o LU 2, E CL 0 , CE Q)w swo—, 0 EE 'a P 8 .-- ��= V) X a o CD U) c — I E C7 z o- C E 'o :3 V 41 0 cc c o U) co c z 'Inn -r- cu > 'rn 2E 0 2 a - U-j o pa M - -2 Z (D '< i5 D w 2 m CL Cn ca -0 < CO om (D F- I a) E. c: 2 -D 3 —= OL r-, a) 0 r- m 9-a 2 w 0 a 6 210 E *6 cm: - - w— D a C: a (n 0( E zi p 0 0 E () cc 0 c3 Z w E a: S r- r- — m -� 2-0 CU M r 76 — — - —2� 0 �, E o C()u m o E 4 t - 2 a, r - -C cy) o w in 2 •c E Q) 0 u2) "--U '0 43 CL CL (D -2 wx WIJ U= tm a 2 E E ro- E 0 V; E CL uj > a 5, Z aAl� m > m T 0> .2 C r- (D ar _j 2 o ca = u >, 2 R as 2 0 o a� 2 7) F- 0. CL U 0 0 U- 0 a. w o d- Fn (9 >- -2 -2 2 Lij cn (n Lu a. rL u) .9 L) 0[ a. (f) m -0 0 -0 0— m -r- E c 0 C' cr En — :3 > x N ro C> Ln in 0 U, u N N U) C7 t6 4 d7 LD I m co r- 5F COO CO as Cl 0 x uj F- m U) w C/) • • mil wmm w 0 ♦ C) C) 0 0 C C� 0 C) CD C) LO LO (D �2 61oq 0. C� 0 0 0 00 ci 6 6 co Cl) d3 59 F- CL C) x LIJ my C/) 0 • 3313551� '70 ry -Cc -0 CL .50 i is m j tm a) ca 0) W 18 C/5 m Z (D a) O 'F U) .2 to . (D i-M Q CD 0 U) co ca C co 03 CD rrnn C14 CN t5 a) IL W 00 co a) cc 2 cr E UOJ o IU) r CL co co X W CL L) < z ❑ CL t6 'n w E m a C U- 0 0 I < ❑ -0 E ❑ w 0 C E -0 M - (o (D r- - a) C: M 4�' 0- E < LD C: t 0 o _Ile Q (n cu 'D =0 7 C> CL Q- 0 M W U) S r 04 Cal L i j C� 0 0 0 00 ci 6 6 co Cl) d3 59 F- CL C) x LIJ my C/) 0 • 3313551� '70 ry -Cc -0 CL .50 i is m j tm a) ca 0) W 18 C/5 m Z (D a) O 'F U) .2 to . (D i-M Q cn D, a) cr) E -60 C (D W X ® U) LL CD IL 'IT V, IT C\l v N cc co co 0 C> (f) C4 to co 0 0 0 C) 0000 C) 0 0) (3) CN 0 1— 0) LD LO 0 C6 C\f — . 64 — U3, 0 ce) m VON 0 co Z) U) 1 C5 ro 0 0 U) — CL cu x 0 UJ .C: t d Q8 CO FJJ ME O lx__x_lX.iX-lip: w M • • • 9 N a) 40- • CL cr (D m CU M IM 0 CD 1 • • C: • 0 0 x (D • 7P • • a — — p (n a) a -0 a) M 70 '. L'E -6 • CD 'a E • r- imm 5 a) Z • :3 • 0 a) -0 b — Co C • • C: Ly L m c a IOQ)> M-F>O i5 = 0 w CL we (Y < 0 0- W CL n — 04 CV) V LO CO 0 C> (f) C4 to co 0 0 0 C) 0000 C) 0 0) (3) CN 0 1— 0) LD LO 0 C6 C\f — . 64 — U3, 0 ce) m VON 0 co Z) U) 1 C5 ro 0 0 U) — CL cu x 0 UJ .C: t d Q8 CO FJJ ME O lx__x_lX.iX-lip: w M • • • 9 N ttf m UJ c ❑ D" YE CL w �i a of .50 W E 2 co C: W U) U) X S ui 0 z o UJ w 0 0 Ci P O F= 0� 0 m L) uj It <D C3 0 O O O 0 ID CD C i a Go 69 U), (A) 0 C) L3 0) 0 Z3 mi uj C) a C) a CD F- C, q q 0 C) 0 O vi vi a W U') — C) to 0 0) .9- 0 Uj a) M C 0 CL CD UJ 0 ca tm Fn U) -6 m CD ❑ IL O cfj CL q5 ❑ C 0 O S, W uj Z5 liS 0 4) UJ E U) U) Im .S CL U) X CL cs LU CL 0 0 > :3 (D 0 0 x 0 ❑ en lL uj a) 0 ceD m — cc 0- CD w a) .6U —ca 0 a- -cg m CL -V) w CL 0- C m L 2 T (D cun, ow 'n w C D V) CL 0- (n a- a- ❑ < < d Q < (a N m �' LO CO tl• 00 M m .1 4 u C: O o m CD •c_- fR 2 v N N CN r N v n CD C; C) 0 rq C) CD if) to CD Ch 0 m 0 cl. o E E 0 r- co 6% to m en 0 Cr .2 ( (D .® E! s s o a a) 0 N IN v - - 01- ' y} Cli C cn 0 = r M M 0 0 0 CD CN w 0 Z5 a co -C ! 00 't W .0 Ln a ' CD :3 mo m 00) O E Z N U C) (0 V "T C4 CN V CN 10 a, co fl- 0 0 > :3 (D 0 0 x 0 ❑ en lL uj a) 0 ceD m — cc 0- CD w a) .6U —ca 0 a- -cg m CL -V) w CL 0- C m L 2 T (D cun, ow 'n w C D V) CL 0- (n a- a- ❑ < < d Q < (a N m �' LO CO tl• 00 M m .1 4 u C: m E o m CD •c_- 2 Q- 0 CD a) E c cl. o E E 0 r- 0 E CL C en 0 Cr .2 ( (D .® E! s s o a a) 0 U. =3 as v v - - 01- ' C cn 0 = r M M 0 0 0 CD w 0 Z5 a C: - -C ! W .0 Ln a ' C: LL : :3 mo m 00) O E Z Z U U C) 10 a, my - U27 -M C U) > > m u- FL , E i:f a > C ( (WD Q- 1 10, (Z .1 4 u I A U per} Cl c LU ei t5 0 0) W f E CL CO) x uj E ie ou CD 0o n C7 CD "T -.4- C14 00 n iA d3 U) ❑ ❑ x 0 a uj 0 0 U) M F - m Q C CL cc 0 2 CL CD .0 ._2 0 CL 0 0 CL = C t0 0 0 m 0 cc 0 E ❑ E !� x zi �g c -0 0 'E c' xx W g cca z C: cu m c: , ou ® 0 cv 0 ay CL m to ro 0 'i c: c: > =3 0 :3 co cn (D 0 D CL 0 U 4 CL Q co co s N (n IT LO to W U, CD 0o n C7 CD "T -.4- C14 00 n iA d3 U) ❑ ❑ x 0 a uj 0 0 U) M F - m Q I 9 Q U-1 co Go V) l9 4 rq m C> 0 C) r'l 69 to 00 C-4 CD 0 C> C) CD C� q 0. q q C> CD C) CD n ea as CD CD 0 u O CD m m us 60 w co 'o C> C3 o C? Cl 0 W udi cn C) C. 0 U-) Iri Cl C) CD 9 C14 CD 0 (0 I`J W 0 co m !le V, CL cq 9 q 9 a O C> CD 0 CD CN U9 69 bs Vk Fq C3 00 9 q q C� CD C) q q q CD c� 0 00 CD O C> 69 64 fiq V) CY z V V N JA V (D W 0 w 0 cCS C) 0 U10 000 CD 66 PI- CD 0 0 U3. 6% 69 us, 2n 0 En efj z co 0 CID x 40 E CD Lli CL OL EL 0 0 '2 w ca E o: 10 as rA .2 2 CL 2 ro 0 LU 2 ia 5F2 o 0 I m Zi cnim�> 0 9 Q � � £ � s � � / \ \ 2 � 2 2 # x » \ � \ \ « ? ? « y 2 / f f \ \ � \� � # / / � \ \ \ 2 \ y � � � « \ / � # / / � \ \ \ 2 \ y « � 2 » d \ « f . k � 2 .1 zmqfflfla� ffir. Terry M. Zaudtke, P.E., BCEE CPH, Inc. 1117 E. Robinson Street, Suite C Orlando, FL 32801 Re� Winter Springs Water Treatment Plant No. 1 Treatment System Improvements City • Winter Springs, Florida ��- �M - Task 1 - Desi-qn Services: 1. Engineering design associated with the Ion Exchange process improvements WTP #1. These improvements will include: I 2. Provide electrical design for new treatment process motors, valves and miscellaneous electrical items at WTP #1 3. Deliverables: a. 90% Drawings, specifications and opinion of costs. b. 100% Drawings, specifications and opinion of costs. Mr. Terry M. Zaudtke, P.E., BCEE S11 PPLEMENTAL SERVICES - Any work requested by the City that is not included in onme of the items listed in any other phase will be classified as supplemental services. Our scope of services shall include the design services as outlined above and shall be performed on a lump sum basis, billed at monthly intervals. Our fee for this work shall be $48,750-00. The attached spreadsheet shows the hourly breakdown of our work. An tstimated sheet list is also included. Very truly yours. pheZI( Bailey, P-S IN FIPT, I Winter Springs WTP #1 Treatment System Improvements City of Winter Springs, Florida Preliminary Sheet List May 2 1 '19 2015 ELECTRICAL E-1 Electrical Notes, Symbols and Abbreviations E-2 Overall Location Map E-3 Electrical Demolition Site Plan E-4 Proposed Electrical Site Plan E-5 Single Line Diagram E-6 Overall Control Wiring Diagram E-7 IEX PCP Control Wiring Riser Diagram E-8 High Service Pump Building Electrical Plan E-9 Ion Exchange Overall Electrical Plan E-10 Ion Exchange Enlarged Electrical Plan E- I I Ion Exchange Electrical Section Details E-12 Ion Exchange Lighting Plan E-13 to Exchange Lightning Protection/Grounding Plan E-14 Corrosion Inhibitor System Electrical Plan E -15 Panel Schedules -1 Lighting Fixture Schedule & Details E-17 Electrical Details — Sheet I E-18 Electrical Details — Sheet 2 III Winter Springs Vi No. 1 Page 1 of 1 512112016 Winter Spring@ Water Treatment Plant No. I Treatment System Improvements City of Winter Springs, Florida Date: 512112015 Estimate of Work Effort & Fee POPCIP01 I Senior nnoncisr Elgonx Bl rnsAdar � niinior..Cade 1'ech — Description 11ci -lourif "curly Rate $1701,00 Date Si4t] 00 Rate I $12500 Z"' Rate $80,00 Task I - Preparation of Contract Documents Total Man- Total man- release Total man- on� Total man- hours "u's on,. hours hwrs Total 120% Submittal Meetings 6 S 1,36000 Data Collection 0 S 1,36000 5 0 8 1'.50a.60 Electrical Design ZA g 4,08000 40 $ 5,600,00 30 a 3,75000 52 S 4,180,00 148 S 17.590,00 Sescifi cadons/Opinam of Casts 1,38000 10 5 2,24000 20 $ 2,50000 $ 44 S 6:1 =00 .00 sublotal; 4a 9. 161100 16 $ i'.840 01) 68 S 1250 CC, $2.1 S 4.10-W 2111 S U410 (10 IM"Jilaid Submittal meetings 0 1,:350.. on- a $ l'in"cro It a - 16 Electrical Design to a 2,7210.00 40 $ 5,80000 20 $ 3,250,00 46 if 3.680.00 128 $ 2,480,00 S 15,250-00 SpocifficalknisnOpinfirm of Costs 4 $ 1160 CC 12 $ 1,880 an- 10 $ 1,25000 41 - 26 $ 3,010,00 Subtotal: A,7600 00 5.4000P es $ 4500 41 1."g L,, 170 Til Talil i= Ila a 16,240.01t 94 13 1 Msa 3" Is Oselffm Teich 76 is 17,M40 H Ila I I waildii 11 im is 17,7tf0.Op 110 a 7.W.00 Su IS ,760.00. 40,760.00 Winter Springs Vi No. 1 Page 1 of 1 512112016 LURNME Attn: Mr. Allen C. Lane, Jr., P.E. P: [407] 425-0452 E: alane@cphcorp.com Re: Proposal to Provide Geotechnical Engineering Services Proposed Concrete Pads for WTP 1 City of Winter Springs, Florida Proposal No. PH 1150349 1(erracon The project site is at the existing Water Treatment Plant 1 located on Northern Way ne Trctwood Park in the City of Winter Springs, Florida. The proposed improvements consist of t construction of a total of five (5) concrete pads, each a roximatel-Lyi 14 feet in di understanding that the pads will be located in the same area and are proposed to suppoi Pquipment/machinery. Terracon will perform a geotechnical investigation to facilitate foundation design of the proposed improvements and construction • the Project. Terracon Consultants, Inc. 1675 Lee Road Winter Park, FL 32789 P (407) 740 6110 F (407) 740 6112 terracon.coni Proposal to Provide Geotechnical Engineering Services Irerracon Proposed Concrete Pads for WTP I m City of Winter Springs, Florida May 1I, 2015 - Terracon Proposal No. PH1 150349 Stake boring locations and coordinate underground utility clearance at the site, Mobilization of truck drill rig and crew to the site. Perform three (3) Standard Penetration Test (SPT) borings to a depth of about 15 feet in the proposed concrete pad areas. Perform visual classification and appropriate laboratory testing of the soil samples obtained from the borings. The exploration will be supervised by a qualified Geotechnical Engineer registered in the State of Florida, and the results of the exploration will be presented in a geotechnical engineering report. The report will address the following items: Based on our �# resent scheih(ymgffmwmp7-T project within about one (1) week of your authorization to proceed. We anticipate the field portion of the study to be completed in approximately one (1) day. Engineering analysis, necessary laboratory work, and report preparation should be completed within approximately two (2) weeks after the completion of field work. Responsive a Resourceful a Reliable 2 Proposal to Provide Geotechnic- ••• `• Concrete Pads for WTP 1 -.1 City of Winter Springs, Florida May 14, 2015 u Terracon Proposal No. PH1 150349 A Scope of Services and Proposed Fee for geotechnical services is attached to this proposa, and will be applicable for services on this project. Our not-to-exceed fee for geotechnical services for the described exploration is $1,975.00. In computing this budget figure, we have assumed the site is accessible to our field crew, th we have riaht of entry to tWe ,7.- 1 i ii E. AUTHORIZATION To authorize us to proceed with this project, please execute and return to us a copy of thi; Purchase Order. Terracon appreciates the opportunity to submit this proposal, and we look forward to work!] with you on this project. If you have any questions, or if we can provide any additionr: information, please feel free to call us at your convenience, 9= I'll I I Elias N. Jammal, P.E. Senior Project Engineer Attachments: Scope of Services and Proposed Fee ) e ff-71710—� Principal Responsive a Resourceful a Reliable 3 11. LABORATORY TESTING A. Visual Examinatlon/Stratity -- Senior Engineering Technicia 11 B. Grain Size Analysis (Single Siev Ill. ENGINEERING AND TECHNICAL SERVICES A, Senior Engineer B. Project Engineer C. CADD Operator D. Administrative Assistant 05 $ 60.00 per hour 2 $ 30.00 each 1 $ 150,00 per hour 4 $ 110,00 per hour 2 $ 5,00 per hour 1 $ 46.00 per hour Subtotal TOTAL FOR PROJECT( -T- ) $ 1 'N' $ 44. $ 13. $ 46,1 0 0 0 ATTACHMENT C Department Actions City of Winter Springs TABLE 1 Treatment Options Attachment No. 2 Legend: CTA Cascade Tray Aerator (100 %) Treatment Effectiveness: O &M Cost: FDEP Staffing Requirement Cl, Chlorine (100%) T Detrimental Increase $ Low Category 5 Class C- Staffing by Class C Operator: 6 hrs /tlay for 5 days/week with Class C Lead NH2CI Chloramines - All WTPs(100 %) No Change $$ Moderate Category 4 Class C- Staffing by Class C Operator: 6 hrs /tlay for 5 days/week with Class C Lead FDA Forced Draft Aeration (100 %) Slightly Effective Reduction $$$ High Category 3 Class B- Staffing by Class C Operator: 16 ms/day for 7 days/week with Class B Lead( 03 Ozone - Sidestream (100 %) Effective Reduction $$$$ Very High Category 2 Class B- Staffing by Class C Operator: 16 ms/day for 7 days/week with Class B Lead( GAC Granular Activated Carbon (50% to 100 %) Very Effective Reduction Category 1 Class B- Staffing by Class C Operator: 24 ms/day for 7 days/week with Class A Lead( IX Ion - Exchange (50% to 100 %) 'Reduced staffing can be requested for systems with functional Systems Control and Data Acquisition SCAD, RO /NF Reverse Osmosis /Nanofiltration (50% to 100 %) Treatment Alternatives (17 -July -2015) 1 of 1 Printed On 7/17/2015 DBP Formation PARAMETERS Treatment Cost Opinion for 5 -m d p g FDEP Staffing Residuals Central Florida Comments Potential Requirement Handling Utilities Treatment Options TOC Bromide HZS VOC THM /HAA Bromate Capital O &M 1 CTA+ Cl2 - -- - -- j j - -- Not Formed - -- - -- Category 5 9 fY NO Winter Springs Current treatment compliance driven by brominatetl THM Species 2 CTA+ NH2CI ncludesCl2contactchamber) Not Formed $1.2 Mil $$ Category No None CT ,disinfection effectiveness requires more tlisnfectant contact time. Potential for nitrification in distribution system. 3 Diffused Aerators - -- - -- - -- j �, Not Formetl $2.3 Mil $72'000 /yr Category 5 g ry NO None Potential for Chloroform removal. More Difficult for Brominatetl THMs. Does HAAS. Power not remove 4 FDA/Odor Control + Cl2 Not Formed $2.6 to $4.6 Mil $200,000 /yr Category 4 Yes Orange County Odor Control Blowtlown Waste Disposal Power & Chem FDA/Odor Control + NH2CI Odor Control Blowtlown Waste Disposal. CT tlisinfection disinfectant 5 (Includes Cl2 contact chamber) j Not Formed $8.8 Mil $$ Category 4 Yes Oviedo effectiveness requires more time. Potential for in distribution ontact nitrification 6 03 +Cl2 $3.2 Mil $$ Category4 No OUC /Orange Bromate formation needs to be addressed y CountyMinter Park 7 GAC +Cl2 - -- j Not Formed $3.8 to $6.9 Mil $400,000 /yr Category 3 Yes None SAC exhaustion leads to frequent SAC replacement GAC Replace 8 Ix+ a2 Not Formed $1.6 to 2.9 Mil $43,000 /yr Salt Category 3 or 4 Yes Wedgefeld /St IX Regenerate salt loading to WWTP needs to be W Cloud /Chuluota addressed Sanford /Seminole County - 9 03 + GAC +Cl2 $7.1 to $10.2 Mil $$$ Category 2 Yes Southeast Regional & Bromate formation and Onc exhaustion need to be addressed Country Club 10 x+ 03+ a2 $4.8 to $6.1 Mil $$$ Category 2 Yes Seminole County- IX Regenerate salt loading to WWTP needs to be Markham Regional addressed 11 FDA/Odor Control +GAC +Cl2 Not Formed $6.1 to $11.2 Mil $$$ Category 2 Yes Casselberry, Odor Control Blowtlown Waste Disposal. SAC leads to frequent GAC exhaustion replacement 12 FDA/Odor Control + IX+ a 2 Not Formed $5.8 to $7.1 Mil $$$ Category 2 Yes None IX Regenerate salt loading to WWTP needs to be addressed 13 RO /NF + FDA/Odor Control + Cl2 W y Not Formed $17.1 Mil $$$$ Category 2 9 fY Yes Palm Coast Concentrate disposal and CUP limitations need to be addressed Legend: CTA Cascade Tray Aerator (100 %) Treatment Effectiveness: O &M Cost: FDEP Staffing Requirement Cl, Chlorine (100%) T Detrimental Increase $ Low Category 5 Class C- Staffing by Class C Operator: 6 hrs /tlay for 5 days/week with Class C Lead NH2CI Chloramines - All WTPs(100 %) No Change $$ Moderate Category 4 Class C- Staffing by Class C Operator: 6 hrs /tlay for 5 days/week with Class C Lead FDA Forced Draft Aeration (100 %) Slightly Effective Reduction $$$ High Category 3 Class B- Staffing by Class C Operator: 16 ms/day for 7 days/week with Class B Lead( 03 Ozone - Sidestream (100 %) Effective Reduction $$$$ Very High Category 2 Class B- Staffing by Class C Operator: 16 ms/day for 7 days/week with Class B Lead( GAC Granular Activated Carbon (50% to 100 %) Very Effective Reduction Category 1 Class B- Staffing by Class C Operator: 24 ms/day for 7 days/week with Class A Lead( IX Ion - Exchange (50% to 100 %) 'Reduced staffing can be requested for systems with functional Systems Control and Data Acquisition SCAD, RO /NF Reverse Osmosis /Nanofiltration (50% to 100 %) Treatment Alternatives (17 -July -2015) 1 of 1 Printed On 7/17/2015