HomeMy WebLinkAbout2011 12 12 Consent 204 Shepard Road StreetscapeCOMMISSION AGENDA ITEM 204 December 12, 2011 Regular Meeting Informational Consent Public Hearings Regular X KS KL City Manager Department REQUEST: The Public Works and Community Development Departments requesting authorization to enter into a contract agreement with Wal -Rose, Inc. for the Shepard Road Streetscape (ITB# 001/12/BF) in the amount of $403,441.74 SYNOPSIS: The Shepard Road Streetscape consists of improvements on a 0.3 -mile segment of Shepard Road from US 17 -92 to Wildwood Drive. The work includes demolition, asphalt milling, resurfacing, widening, adding landscaped medians, curb and gutter, sidewalks, a stormwater management system, decorative street lights, landscaping, irrigation, and an entry feature. Staff recommends awarding the construction contract to the low bidder, Wal -Rose, Inc., in the amount of $403,441.74 plus a 5% contingency, funded by the US 17 -92 CRA Redevelopment Trust Fund. CONSIDERATIONS: The Final Engineering and Aesthetic Review Plans for the Shepard Road Streetscape were approved by the City Commission at the November 14, 2011 City Commission meeting. The project consists of roadway, landscape, and hardscape improvements on a 0.3 -mile segment of Shepard Road from US 17 -92 to Wildwood Drive. The work includes demolition, asphalt milling, resurfacing, widening, adding landscaped medians, curb and gutter, sidewalks, a stormwater management system, decorative street lights, landscaping, irrigation, and an entry feature. The project was advertised for bidding in the Orlando Sentinel on Sunday, October 30, 2011 Consent 204 PAGE 1 OF 3 - December 12, 2011 (see Exhibit A). Bids were received and opened on November 30, 2011 with the results as follows: Invitation to Bid #001/12/BF - Base Bid Results: 1. Wal -Rose, Inc. $488,364.59 2. CFE Corp., $500,437.01 3. AJC Construction, LLC $562,699.10 4. Gibbs & Register, Inc. $695,128.00 Gateway Feature The project includes a gateway feature located on Shepard Road approximately 500 -feet east of US 17 -92. The gateway feature in the base bid consists of two brick pilaster structures approximately 3 -feet square and 10 -feet in height with City plaques on both sides. The brick pilasters would be installed on opposite sides of Shepard Road, within the right -of -way just behind the sidewalks. The alternate bid replaces the pilaster on the south side with a brick gateway tower structure consisting of an arch over the sidewalk. The gateway tower is approximately 16 -feet in height and includes light fixtures, a tile roof, and decorative "Winter Springs" signage. The additional cost to replace one brick pilaster with the gateway tower for the low bidder (Wal -Rose, Inc.) is $32,386.40. Due to the high cost and limited project budget, Staff recommends constructing the two brick pilaster structures included in the base bid price in the total amount of $13,697.20. The gateway tower may be considered for a future US 17 -92 CRA project at S.R. 434. Construction Funding Plan: The available funding from the US 17 -92 CRA Redevelopment Trust Fund is $464,740.67, consisting of $448,740.67 for construction and $16,000 for the initial two years of maintenance. The lowest base bid submitted by Wal -Rose, Inc. is $488,364.59. Staff reviewed the bid in detail and determined that the combined pricing for landscaping and irrigation in the amount of $67,892.10 was too high and could be substantially reduced if this work were performed directly for the City under a separate contract. Staff also concluded that the price of $17,030.75 to provide lighting at the two brick pilasters was too high. Staff recommends deleting the pilaster lighting from the contract and utilizing the new streetlights to provide lighting in the vicinity of the pilasters. The removal of the landscaping, irrigation, and pilaster lighting from the contract reduces Wal -Rose bid amount by a combined $84,922.85 to a new total of $403,441.74. Wal -Rose has agreed to these changes to their bid. Staff recommends that the bid be awarded to the low bidder, Wal -Rose, Inc. in the amount of $403,441.74 plus a 5% contingency ($20,172.09) for a total obligation of $423,613.83. The landscaping and irrigation will be installed under a separate contract to be awarded at a later date. The landscaping and irrigation contract will be funded using the remaining CRA construction funding of $25,126.84 and will be supplemented as needed by the $16,000 of CRA maintenance funds, any remaining contingency funds from the Wal -Rose contract, and by performing portions of the work in -house if necessary. Construction is expected to begin in January 2012 and is scheduled to be complete in May 2012. Consent 204 PAGE 2 OF 3 - December 12, 2011 FISCAL IMPACT: The project cost is $403,441.74 plus a 5% contingency, for a total of $423,613.83 funded by the US 17 -92 CRA Redevelopment Trust Fund. COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, eAlert/eCitizen Recipients, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at five (5) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. Construction notices will be distributed in advance to all affected parties, including the Highlands and Wildwood HOAs, Highlands Elementary School, and the businesses near the US 17 -92 / Shepard Road intersection. RECOMMENDATION: Staff recommends that the City Commission approve the award of the Shepard Road Streetscape to the low bidder, Wal -Rose, Inc. in the amount of $403,441.74 plus a 5% contingency, funded by the US 17 -92 CRA Redevelopment Trust Fund, and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1. Exhibit A - Orlando Sentinel Legal Advertisement for Bids (1 page) 2. Exhibit B - Bid Tabulation for ITB# 001 /12BF (2 pages) Consent 204 PAGE 3 OF 3 - December 12, 2011 Before the undersigned authority personally appeared Jennifer Irwin/Tame la Vargas/Deborah M. Toney, who on oath says that s/he is the Legal Advertising Representative of Orlando Sentinel, a daily newspaper published in Seminole County, Florida; that the attached copy of advertisement, being a Advertisement for Bid in the matter of Bid No. ITB 001/12/BF in the Seminole County was published in said newspaper in the issue(s); of Affiant further says that the said Orlando Sentinel is a newspaper published in said Seminole County, Florida, and that the said newspaper has heretofore been continuously published in said Seminole County, Florida, each week day and has been entered as second-class mail matter at the post office in said Seminole County, Florida, for a period of one year next preceding the first publication of the attached copy of advertisement; and affiant further says that s/he has neither paid nor promised any person, firm or corporation any discount, rebate, commission or refund for the purpose of securing this advertisement for publication in the said newspaper. The foregoing instrument was acknowledged before me this 3 L day of October, 2011, Jennifer Irwin/Tamela Vargas/Deborah M. Toney, who is personally known to me and who did take an oath. 1158207 City Of Winter Springs 1126 E STATE ROAD 434 WINTER SPRINGS, FL 32708-2715 10/30/11 R VARCAS U LK; FLopm,A, C,:ornrcr, D0091 621•91 Fp Orlando Sentinel HIBIT ffOFTERRINGS ° INVITATION TO BID SHEPARD ROAD STREETSCAPE " • • Bid No. ITB 001/12/BF Sealed Bids must be received by ,November 30, t, 2011 at 2:00 P.M. at the City of Winter pprings, Citt Hall, 1126 East S.R. 434, Winter Springs, FL 32708 The Bidding Documents may be down- loaded in pdf format from the City's vvebsite at the following link: http://vvww.wiriterseringsfi.org/EN/ web/gov/bids_purchasing.htm This construction prOject consists of streetscdpe improvement on a 0.3- mile segment of Shepard !Road from US 17/92 .to VVildwpod Drive. in Winter Springs. The work includes demolition, asphalt milling, resurfacing, and m 'ening, adding a' landsc curb and gutter, siciewilliPg ' arid land a storm- - water management and s im- scape, irrigation, nc ariscape provements. The estimated construc- . tion cost is $400,000. Contractors 1rIuSt be FDOT Prequali- fled in the Woric Classes of Flexible e Paving and Drainage bidthisproj- A mandatory pre-hid meeting be held on November 17, 2011 at 10 AM at the City of Winter Springs, 1126 East S.R. 434, Winter- Springs, FL 32708. Con- tractors who do not havga representa- tive at the pre-bld meeting will not be eligible to submit a bid. All questions regarding the bid should be directed to Brian Fields, PE., City Engineer, at 407-327-7597 or e mail to - bfiekls@winterspringst. csE1158207 10/30/21_11 Shepard Road Streetscape Bid Tabulation Wai -Rose CFE Corp. AJC Construction Gibbs & Register Payitem Description Unit Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization LS 1 $42,467.34 $42,467.34' $36,723.00 $36,723.00 $20,000.00 $20,000.00' $61,300.00 $61,300.00 2 Maintenance of Traffic LS 1 $4,785.31 $4,785.31' $20,269.00 $20,269.00 $3,990.00 $3,990.00' $25,000.00 $25,000.00 3 Demolition LS 1 $4,470.95 $4,470.95 $27,177.00 $27,177.00 $5,700.00 $5,700.00' $45,000.00 $45,000.00 4 Sediment Barrier (Silt Fence) LF 3,419 $0.79 $2,701.01' $0.60 $2,051.40 $1.00 $3,419.00' $1.00 $3,419.00 5 Inlet Protection Systems (Rock Bags and Hay Bales) EA 188 $6.05 $1,137.40 $11.80 $2,218.40 $18.00 $3,384.00' $5.00 $940.00 6 Regular Excavation CY 455 $2.36 $1,073.80' $12.85 $5,846.75 $8.00 $3,640.00' $10.00 $4,550.00 7 Embankment CY 891 $3.31 $2,949.21 $9.00 $8,019.00 $15.00 $13,365.00' $15.00 $13,365.00 8 Type B Stabilization SY 1,166 $4.54 $5,293.64' $9.10 $10,610.60 $7.00 $8,162.00 $18.00 $20,988.00 9 Optional Base, Base Group 03 SY 505 $11.90 $6,009.50' $15.65 $7,903.25 $23.00 $11,615.00 $20.00 $10,100.00 10 Milling Exist. Asphalt Paving, 1 1/2" avg. depth SY 4,462 $2.42 $10,798.04' $2.90 $12,939.80 $2.00 $8,924.00' $4.00 $17,848.00 11 Superpave Asphaltic Conc, Traffic C TN 573 $119.13 $68,213.84' $101.95 $58,376.57 $110.00 $62,986.00' $80.00 $45,840.00 12 Inlets, Curb, Type P -5, <10' EA 10 $2,091.33 $20,913.30 $2,110.00 $21,100.00 $2,850.00 $28,500.00' $3,500.00 $35,000.00 13 Inlets, Curb, Type J -5, <10' EA 1 $2,472.76 $2,472.76 $2,195.00 $2,195.00 $3,420.00 $3,420.00 $4,000.00 $4,000.00 14 Inlets, DT BOT, Type C, <10' EA 1 $1,209.64 $1,209.64' $1,630.00 $1,630.00 $1,710.00 $1,710.00 $2,000.00 $2,000.00 15 Inlets, DT BOT, Type C, Modify EA 2 $1,579.87 $3,159.74' $1,445.00 $2,890.00 $1,710.00 $3,420.00' $2,000.00 $4,000.00 16 Manholes, P -8, <10' EA 1 $1,471.69 $1,471.69' $1,365.00 $1,365.00 $2,850.00 $2,850.00' $2,500.00 $2,500.00 17 Pipe Culv, Opt Matl, Round, 18" S /CD LF 575 $23.45 $13,483.75' $33.25 $19,118.75 $40.00 $23,000.00' $55.00 $31,625.00 18 Pipe CuIv, Opt Matl, Round, 24" S /CD LF 501 $34.00 $17,034.00' $32.20 $16,132.20 $46.00 $23,046.00' $60.00 $30,060.00 19 Pipe CuIv, Opt Matl, Other -Elip /Arch, 18" S /CD LF 27 $36.71 $991.17 $42.30 $1,142.10 $42.00 $1,134.00 $100.00 $2,700.00 20 Pipe CuIv, Opt Matl, Other -Elip /Arch, 24" S /CD LF 440 $47.57 $20,930.80' $41.55 $18,282.00 $49.00 $21,560.00 $70.00 $30,800.00 21 Mitered End Sect, Opt / Other, 24" SD EA 1 $599.90 $599.90 $1,680.00 $1,680.00 $741.00 $741.00 $700.00 $700.00 22 Pipe Handrail - Guiderail, Steel LF 18 $121.00 $2,178.00' $90.00 $1,620.00 $41.00 $738.00 $50.00 $900.00 23 Concrete Curb & Gutter, Type F LF 2,551 $10.29 $26,249.79 $12.95 $33,035.45 $20.00 $51,020.00' $15.00 $38,265.00 24 Concrete Curb, Type B LF 1,516 $10.29 $15,599.64' $11.00 $16,676.00 $20.00 $30,320.00' $13.00 $19,708.00 25 Valley Gutter - Concrete LF 682 $10.89 $7,426.98 $8.25 $5,626.50 $28 .00 $19,096.00 $16.00 $10,912.00 26 Sidewalk Conc, 4" Thick SY 1,789 $21.78 $38,964.42' $17.80 $31,844.20 529.00 $51,881.00' $35.00 $62,615.00 27 Sidewalk, Conc, 6" Thick SY 47 $29.04 $1,364.88' $25.75 $1,210.25 $36.00 $1,692.00' $45.00 $2,115.00 28 Single Post Sitn, F &I, Less thn 12 sf AS 4 $296.45 $1,185.80' $313.50 $1,254.00 $222.00 $888.00' $250.00 $1,000.00 29 Single Post Sign, Relocate AS 2 $60.50 $121.00 $75.00 $150.00 $97.00 $194.00' $100.00 $200.00 30 Single Post Sign, Remove AS 3 $30.25 $90.75' $65.00 $195.00 $57.00 $171.00' $50.00 $150.00 31 Retro- Reflective Pavement Markers EA 48 $5.45 $261.60 $4.50 $216.00 $5.00 $240.00 $4.00 $192.00 32 Painted Pavt Mark, Std, White, Arrows EA 1 $101.64 $101.64' $30.00 $30.00 $217.00 $217.00' $40.00 $40.00 33 Thermoplastic, Std, White, Solid, 6" NM 0.505 $7,027.68 $3,548.98 $4,940.00 $2,494.70 $4,935.00 $2,492.18 $4,500.00 $2,272.50 34 Thermoplastic, Std, White, Solid, 12" LF 1,081 $2.84 $3,070.04' $2.00 $2,162.00 $2.00 $2,162.00' $2.00 $2,162.00 35 Thermoplastic, Std, White, DOT /Guide, 6" LF 22 $1.09 $23.98 $0.50 $11.00 $2.00 $44.00 $1.00 $22.00 36 Thermoplastic, Std, Yellow, Solid, 6" NM 0.057 $7,027.68 $400.58 $4,940.00 $281.58 $4,920.00 $280.44 $4,500.00 $256.50 37 Thermoplastic, Std, Yellow, Solid, 18" LF 58 $4.15 $240.70 $2.80 $162.40 $3.00 $174,00' $2.50 $145.00 38 Thermoplastic, Std, Yellow, DOT /Guide, 6" LF 384 $1.09 $418.56' $0.40 $153.60 $1.00 $384,00' $1.00 $384.00 Shepard Road Streetscape Bid Tabulation Shepard Road Streetscape Bid Tabulation Wal -Rose CFE Corp. AJC Construction Gibbs & Register Payitem Description Unit Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total 39 Decorative Concrete Crosswalks SY 34 $90.75 $3,085.50' $50.00 $1,700.00 $34.00 $1,156.00' $125.00 $4,250.00 40 Decorative Concrete in Median SY 84 $54.45 $4,573.80' $50.00 $4,200.00 $34.00 $2,856.00' $130.00 $10,920.00 41 Japanese Blueberry EA 15 $199.65 $2,994.75 $181.50 $2,722.50 $190.00 $2,$50.00' $225.00 $3,375.00 42 Crape Myrtle EA 11 $272.25 $2,994.75' $247.50 $2,722.50 5259.00 $2,849.00' $135.00 $1,485.00 43 Sand Live Oak EA 5 $187.55 $937.75 $166.10 $830.50 $177.00 $885.00 $125.00 $625.00 44 Sylvester Palm EA 3 $3,623.95 $10,871.85' $3,295.00 $9,885.00 $3,420.00 $10,260.00' $3,000.00 $9,000.00 45 Winged Elm EA 10 $175.45 $1,754.50 $145.00 $1,450.00 $171.00 $1,710.00 $175.00 $1,750.00 46 Sabal Palm EA 7 $211.75 $1,482.25' $195.00 $1,365.00 $200.00 $1,400.00 $200.00 $1,400.00 47 Orange Bulbine EA 1,736 $3.63 $6,301.68 $3.35 $5,815.60 $3.00 $5,208.00 $3.00 $5,208.00 48 Blueberry Flax Lily EA 42 $4.24 $178.08' $3.85 $161.70 $4.00 $168.00' $5.00 $210.00 49 Muhly Grass EA 376 $9.68 $3,639.68' $8.80 $3,308.80 $9.00 $3,384.00' $8.00 $3,008.00 50 Walters Viburnum EA 330 $10.89 $3,593.70' $9.90 $3,267.00 $10.00 $3,300.00 $8.00 $2,640.00 51 Coontie EA 197 $18.15 $3,575.55 $16.50 $3,250.50 $17.00 $3,349.00' $23.00 $4,531.00 52 Argentine Bahia SF 21,928 $0.22 $4,824.16' $0.22 $4,824.16 $0.26 55,701.28 $0.25 $5,482.00 53 Mulch CY 74 $47.19 53,492.06' $42.90 $3,174.60 $43.00 $3,182.00 $45.00 $3,330.00 54 Irrigation System (Complete) LS 1 $26,075.50 $26,075.50' $21,250.00 $21,250.00 $24,567.00 $24,567.00' $27,500.00 $27,500.00 55 Gateway Pilaster - w /Base Bid Plaque EA 2 $6,848.60 $13,697.20' $12,353.00 $24,706.00 $23,000.00 $46,000.00' $6,500.00 $13,000.00 56 Electrical & Gateway Lighting LS 1 $17,030.75 $17,030.75' $15,482.00 $15,482.00 $16,000.00 $16,000.00' $13,500.00 $13,500.00 OFF -SITE DRAINAGE 57 Clearing & Grubbing LS 1 $32,520.59 $32,520.59' $2,200.00 $2,200.00 $1,710.00 $1,710.00' $25,000.00 $25,000.00 58 Regular Excavation 5Y 622 $5.64 $3,508.08 $12.55 $7,806.10 $6.00 $3,732.00 $25.00 $15,550.00 59 Concrete Ditch Pavt, NR, 3" SY 2.4 $21.78 $52.27' $240.00 $576.00 $238.00 $571.20' $300.00 $720.00 60 Conc Ditch Pavt, 4 ", Reinforced SY 57 $30.25 $1,724.25 $21.30 $1,214.10 $32.00 $1,824.00' $45.00 $2,565.00 61 Pipe CuIv, Opt Matl, Round, 24" S /CD LF 19 $34.00 $646.00' $38.55 $732.45 $42.00 $798.00' $95.00 $1,805.00 62 Mitered End Sect, Opt / Other, 24" SD EA 1 $599.90 $599.90 $190.00 $190.00 $855.00 $855.00' $700.00 $700.00 63 Skimmer EA 1 $4,795.86 54,795.86' $2,810.00 $2,810.00 $1,824.00 51,824.00' $4,500.00 $4,500.00 TOTAL BASE BID PRICE (sum of items 1 -63): $488,364.59 $500,437.01 $562,699 10 $695,128.00 64 Bid Alternate 01- Gateway Tower with Associated Lighting LS 1 $39,235.00 $71,793.00 $70,000.00) $45,000.00 Shepard Road Streetscape Bid Tabulation