Loading...
HomeMy WebLinkAbout2011 10 24 Consent 207 Charter School Site Acceptance COMMISSION AGENDA X CONSENT INFORMATIONAL ITEM 207 PUBLIC HEARING REGULAR MGR /DEPT October 24, 2011 Meeting Authorization REQUEST: The Public Works Department Requesting the City Commission validate the Staff recommendation finding the Choices In Learning Charter School sitework to be built in substantial accordance with the Final Engineering plans and to accept the public infrastructure for ownership and maintenance. SYNOPSIS: Sitework for the Choices in Learning Charter School is substantially complete and has been conditionally approved by all applicable City Departments. This agenda item provides the site acceptance necessary before a certificate of occupancy can be issued by the building official. CONSIDERATIONS:  APPLICABLE CODE: Section 9-178. Required Improvements to be completed prior to building on lots; exceptions. (c) Where the building official has an authoritative method of assurance that the improvements will be completed in accordance with approved plans, such as withholding occupancy, the building official may issue building permits upon advising the developer that all or partial occupancy will be restricted until satisfactory completion of the improvements has be accomplished. (d) … Certificates of occupancy will not be issued until all improvements are accepted by the city commission.  The Choices In Learning Charter School is a new 51,200 square foot, 2-story charter school (grades pre-K through 5) located on the crescent-shaped 8.7-acre site at the northeast corner of S.R. 434 and Central Winds Drive in the Town Center District. Final Engineering was approved by the City Commission at the January 24, 2011 City Commission meeting. City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 207 Page 2 of 7  A Development Agreement (DA) was approved by the City Commission on September 13, 2010. The DA documented approval of the concept plan, the civic site, aesthetic commitments associated with the civic site designation, hours of operation (to avoid traffic conflicts with the high school), phasing, perimeter fencing, deferring on-street parking along the eastern site boundary, Hicks Avenue improvements, future joint use of City park and charter school facilities, parking and queuing, and possible joint signage for the school and Central Winds Park. The DA was recorded on October 26, 2010. A First Modification to the DA was approved by the City Commission in conjunction with the Final Engineering approval on January 24, 2011, and the First Modification to the DA was recorded on August 10, 2011. The modifications included: allowing canopies and awnings at 9-foot elevations above the sidewalk, allowing a 4-foot black vinyl coated chain-link fence along a portion of the site perimeter (with a vegetative screen), allowing building expression lines to be located below the second floor windows, allowing selected curb radii to be greater than 15-feet to accommodate school buses, and permitting the window glazing at the north elevation of the building to be 13% transparent glass.  The Development Agreement requires that a Joint Facility and Use Agreement between the City and the Charter School be approved and fully executed prior to issuance of the Certificate of Occupancy. The Agreement is expected to be complete and on the City Commission agenda for approval at the October 24, 2011 meeting or the next meeting on November 14, 2011.  The Choices In Learning Charter School sitework has been constructed in substantial accordance with the Final Engineering plans approved by the City Commission on January 24, 2011, except as noted on the attached conditions of approval, Exhibit A. In addition, All Development Agreement requirements applicable to the sitework have been completed.  The Charter School has provided the required easement documents for the public underground utilities, public sidewalks, and landscape buffers. The public infrastructure being accepted by this agenda item includes:  A new water main and fire hydrant located along the front of the property  New public sidewalks along Hicks Avenue, Central Winds Drive, and Central Winds Parkway.  Parallel parking spaces along Hicks Avenue  Signage, striping, and other miscellaneous roadway improvements in the public right-of-way  The Charter School is currently planning to open for operation in late November 2011. City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 207 Page 3 of 7 SITE PHOTOS – BEFORE / DURING CONSTRUCTION: City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 207 Page 4 of 7 City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 207 Page 5 of 7 SITE PHOTOS – AFTER CONSTRUCTION: City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 207 Page 6 of 7 FISCAL IMPACT: There is no fiscal impact associated with this agenda item. COMMUNICATION EFFORTS: This Agenda Item Has Been Electronically Forwarded To The Mayor And City Commission, City Manager, City Attorney/Staff, And Is Available On The City’s Website, LaserFiche, And The City’s Server. Additionally, Portions Of This Agenda Item Are Typed Verbatim On The Respective Meeting Agenda Which Has Also Been Electronically Forwarded To The Individuals Noted Above, And Which Is Also Available On The City’s Website, LaserFiche, And The City’s Server; Has Been Sent To Applicable City Staff, eAlert/eCitizen Recipients, Media/Press Representatives Who Have Requested Agendas/Agenda Item Information, Homeowner’s Associations/Representatives On File With The City, And All Individuals Who Have Requested Such Information. City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 207 Page 7 of 7 This Information Has Also Been Posted Outside City Hall, Posted Inside City Hall With Additional Copies Available For The General Public, And Posted At Five (5) Different Locations Around The City. Furthermore, This Information Is Also Available To Any Individual Requestors. City Staff Is Always Willing To Discuss This Agenda Item Or Any Agenda Item With Any Interested Individuals. RECOMMENDATION: Staff recommends that the City Commission validate the Staff recommendation finding the Choices In Learning Charter School sitework to be built in substantial accordance with the Final Engineering plans, subject to completion of all conditions of approval to Staff’s satisfaction prior to issuance of the Certificate of Occupancy, and to accept the public infrastructure for ownership and maintenance. ATTACHMENTS: 1.Exhibit A – Conditions of Approval (1 page) EXHIBIT A City of Winter Springs Charter School Site Acceptance – Conditions of Approval 10/18/11 1. Provide Engineer of Record's final certification letter to the City 2. Provide FDOT Permit Certification for work completed in the FDOT right-of-way 3. Provide a complete set of record drawings (hard copy and digital file) 4. Provide the 2-Year Escrow Deposit or Letter of Credit in the amount of $8,150 (10% of the value of the improvements to be owned and maintained by the City) 5. Provide a Bill of Sale for improvements that will be owned and maintained by the City 6. Provide a copy of the Engineer’s as-built certification letter to SJRWMD 7. Complete the following construction punchlist items: a. Replace broken sidewalk panel on Hicks Avenue b. Finish sodding and site restoration c. Repair asphalt segregation in various places at the entrances and nearby parallel parking spaces d. Pond cleanup, including removal of weeds, trash, restoration of washouts, stabilization of areas with no sod, etc. e. Repair sidewalk crack near the north end of Hicks Avenue (one panel to be replaced) f. Repair cracks in the concrete valley gutter at the entrances g. Install decorative street signs for all new signs in the public right-of-way h. Complete site restoration and cleanup, including areas along the perimeter of the site that were disturbed as part of construction i. Repair miscellaneous concrete cracks and chips in sidewalks, curbs, and other locations j. Restoration and cleanup of the area at the western end of the site between the sidewalk and the FDOT right-of-way (remove weeds, trash , sediments, etc., then stabilize k. At the reclaimed water backflow preventer, paint all above-ground piping and fittings black l. Paint the irrigation pump system box “Forest Green” as called out on the plans