HomeMy WebLinkAbout2011 10 24 Consent 205 Tuscawilla Unit 17 Construction Contract Award COMMISSION AGENDA CONSENT X INFORMATIONAL ITEM 205 PUBLIC HEARING REGULAR MGR /DEPT October 24, 2011 Meeting Authorization REQUEST: The Public Works Department requesting authorization to enter into a contract agreement with Cloud 9 Services, Inc. for the Tuscawilla Unit 17 Pond Improvements (ITB# 012-11-BF) in the amount of $57,710 SYNOPSIS: The Tuscawilla Unit 17 Pond Improvements project consists of the removal and replacement of failing outfall structures at two wet detention ponds located adjacent to holes 12 and 13 of the Tuscawilla Country Club golf course. These two ponds are part of the Glen Eagle public stormwater system and are under the City’s maintenance responsibility. Staff recommends awarding a construction contract to the low bidder, Cloud 9 Services, Inc., in the amount of $57,710 plus a 10% contingency. CONSIDERATIONS:  The Tuscawilla Unit 17 (Glen Eagle) stormwater system includes two wet detention ponds located adjacent to holes 12 and 13 on the Tuscawilla Country Club golf course (see Exhibit A). At each pond, the circular corrugated metal outfall structures have failed. These two circular outfall structures, which were built in the early 1990’s, are known as “vertical volume recovery” structures (or “VVRs”) that use sand media filters to treat stormwater. The VVR structures are difficult to maintain and they do not meet current stormwater design standards. The City’s stormwater system has five remaining ponds that utilize VVRs, and these are all scheduled to be replaced over the next several years. The VVR structure at the O’Day Drive pond in Oak Forest was replaced last year, and this project will replace two more failing VVR structures.  The Tuscawilla Unit 17 Pond Improvements project consists of the removal of the failing structures at each pond and replacement with a new control structure and outfall piping meeting current stormwater design standards. At the pond adjacent to golf course hole #12, the inlet structure will also be modified to improve pond circulation. At both ponds, this project will restore the stormwater treatment and flood control function in accordance with the previously permitted design, and it will improve the appearance of the area. City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 205 Page 2 of 3  At the golf course hole # 13 pond, input from the Country Club and nearby Glen Eagle residents indicated a desire to raise the water level to improve the pond’s appearance. Staff and the design consultant, CPH Engineers, examined this in detail and determined that the current normal water level is approximately 1-foot lower than the design normal water level due to the failing VVR structure. This 1-foot elevation difference will be corrected with this VVR replacement project. CPH also examined the possibility of raising the normal water level by more than 1-foot. However, it was determined that based on the pond bank elevations there was not enough pond volume available to raise the normal water level and still meet the permitted design requirements for flood control and stormwater treatment. As an additional enhancement to the hole #13 pond, the project includes the excavation of sediments that have accumulated at the pond bottom and using the excavated material to restore, re-grade, and re-sod the pond side slopes.  The project was advertised for bidding in the Orlando Sentinel on Sunday, September 18, 2011 (see Exhibit B). Bids were received and opened on October 13, 2011 with the results as follows: Invitation to Bid #012-11-BF - Bid Results 1.Cloud 9 Services, Inc. $57,710.00 2.CFE Corp. $58,965.00 3.Wal-Rose, Inc. $98,500.00  Staff has reviewed the bids and recommends that the bid be awarded to the low bidder, Cloud 9 Services, Inc. in the amount of $57,710 plus a 10% contingency. Cloud 9 has performed utility construction services for the City in the past and Staff has verified that Cloud 9 has sufficient experience, equipment, and personnel to perform the work.  Construction is expected to begin in November 2011 and is scheduled to be complete in January 2012. FISCAL IMPACT: The project cost is $57,710 plus a 10% contingency, for a total of $63,481. The project budget is $60,000 funded by the Stormwater Fund (line code #3800-65000). The additional $3,481 of contingency funds, if needed, would be funded by a supplemental appropriation from the Stormwater Fund balance. City Commission – Regular Meeting October 24, 2011 Consent Agenda Item # 205 Page 3 of 3 COMMUNICATION EFFORTS: This Agenda Item Has Been Electronically Forwarded To The Mayor And City Commission, City Manager, City Attorney/Staff, And Is Available On The City’s Website, LaserFiche, And The City’s Server. Additionally, Portions Of This Agenda Item Are Typed Verbatim On The Respective Meeting Agenda Which Has Also Been Electronically Forwarded To The Individuals Noted Above, And Which Is Also Available On The City’s Website, LaserFiche, And The City’s Server; Has Been Sent To Applicable City Staff, eAlert/eCitizen Recipients, Media/Press Representatives Who Have Requested Agendas/Agenda Item Information, Homeowner’s Associations/Representatives On File With The City, And All Individuals Who Have Requested Such Information. This Information Has Also Been Posted Outside City Hall, Posted Inside City Hall With Additional Copies Available For The General Public, And Posted At Five (5) Different Locations Around The City. Furthermore, This Information Is Also Available To Any Individual Requestors. City Staff Is Always Willing To Discuss This Agenda Item Or Any Agenda Item With Any Interested Individuals. RECOMMENDATION: Staff recommends that the City Commission approve Cloud 9 Services, Inc. for the Tuscawilla Unit 17 Pond Improvements in the amount of $57,710 plus 10% contingency, funded from the Stormwater Fund, and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1.Exhibit A – Project Map (1 page) 2.Exhibit B - Orlando Sentinel Legal Advertisement for Bids (1 page) 3.Bid Tabulation for ITB #012/11/BF (1 page) ÝÌ ÑÒÌßÎ×Ñ ÷äôóúóèú