Loading...
HomeMy WebLinkAbout2011 09 26 Consent 205 Jesups Reserve Phase 2 Site Acceptance COMMISSION AGENDA X CONSENT INFORMATIONAL ITEM 205 PUBLIC HEARING REGULAR MGR /DEPT September 26, 2011 Meeting Authorization REQUEST: The Public Works Department Requesting the City Commission validate the Staff recommendation finding the Jesup’s Reserve Phase 2 sitework to be built in substantial accordance with the Final Engineering plans and to accept the public infrastructure for ownership and maintenance. SYNOPSIS: Sitework for Jesup’s Reserve Phase 2, consisting of improvements to Roberts Family Lane, is substantially complete and has been approved by all applicable City Departments. This agenda item provides the site acceptance necessary before a certificate of occupancy can be issued by the building official for any of the 10 townhome units fronting Roberts Family Lane. CONSIDERATIONS:  APPLICABLE CODE: Section 9-178. Required Improvements to be completed prior to building on lots; exceptions. (c) Where the building official has an authoritative method of assurance that the improvements will be completed in accordance with approved plans, such as withholding occupancy, the building official may issue building permits upon advising the developer that all or partial occupancy will be restricted until satisfactory completion of the improvements has be accomplished. (d) … Certificates of occupancy will not be issued until all improvements are accepted by the city commission.  Jesup’s Reserve is a 161-unit townhome development on 11.03 acres located on the south side of S.R. 434 and west of Tuskawilla Road in the Winter Springs Town Center. Final Engineering for Jesup’s Reserve was approved by the City Commission at the August 8, 2005 City Commission meeting. The Final Engineering consisted of two phases, with Phase 1 consisting of 151 units and Phase 2 consisting of 10 units at the two buildings facing Roberts Family Lane at the eastern end of the subdivision. City Commission – Regular Meeting September 26, 2011 Consent Agenda Item # 205 Page 2 of 3  Sitework for Phase 1 was conditionally accepted by the City Commission at the December 11, 2006 City Commission meeting. Many of the incomplete items that were listed as conditions of approval at that time were not completed by the original developer, Levitt & Sons, who filed for bankruptcy and abandoned the site. The incomplete sitework items in Phases 1 and 2 have since been substantially completed by either the new developer, bonding company, or the City using bond settlement proceeds.  At the July 23, 2007 City Commission meeting, the Commission approved a modification to the Final Engineering plans to allow Roberts Family Lane to be built as a one-way half-street with traffic movement from north to south. Roberts Family Lane has been completed as a half-street, with portions of construction being completed by various entities including the original developer, the bonding company, the new builder (DR Horton), and the City using bond proceeds. The remaining portion of Roberts Family Lane will be built when the right-of-way from the adjacent property becomes available.  The Phase 2 sitework being accepted with this agenda item includes: Roberts Family Lane half-street improvements o Parallel parking along the west side of Roberts Family Lane o Curb, gutter, sidewalk, and stormwater facilities at Roberts Family Lane o Signage and striping o  The Jesup’s Reserve Phase 2 sitework has been constructed in substantial accordance with the Final Engineering plans approved by the City Commission on August 8, 2005, and per the the approved modifications on July 23, 2007.  Some sitework items, such as sidewalks and landscaping in the immediate vicinity of townhome buildings yet to be constructed, will be constructed in conjunction with townhome construction to minimize damages to the public infrastructure. FISCAL IMPACT: There is no fiscal impact associated with this agenda item. COMMUNICATION EFFORTS: This Agenda Item Has Been Electronically Forwarded To The Mayor And City Commission, City Manager, City Attorney/Staff, And Is Available On The City’s Website, LaserFiche, And The City’s Server. Additionally, Portions Of This Agenda Item Are Typed Verbatim On The Respective Meeting Agenda Which Has Also Been Electronically Forwarded To The Individuals Noted Above, And Which Is Also Available On The City’s Website, LaserFiche, And The City’s Server; Has Been Sent To Applicable City Staff, eAlert/eCitizen City Commission – Regular Meeting September 26, 2011 Consent Agenda Item # 205 Page 3 of 3 Recipients, Media/Press Representatives Who Have Requested Agendas/Agenda Item Information, Homeowner’s Associations/Representatives On File With The City, And All Individuals Who Have Requested Such Information. This Information Has Also Been Posted Outside City Hall, Posted Inside City Hall With Additional Copies Available For The General Public, And Posted At Five (5) Different Locations Around The City. Furthermore, This Information Is Also Available To Any Individual Requestors. City Staff Is Always Willing To Discuss This Agenda Item Or Any Agenda Item With Any Interested Individuals. RECOMMENDATION: Staff recommends that the City Commission validate the Staff recommendation finding the Jesup’s Reserve Phase 2 sitework to be built in substantial accordance with the Final Engineering plans and to accept the public infrastructure for ownership and maintenance. ATTACHMENTS: 1.Exhibit A – Jesup’s Reserve Sheet C-7A with Phase Line (1 page) ÛÈØ×Þ×Ì ï и¿­» î ø͸¿¼»¼ ß®»¿÷