Loading...
HomeMy WebLinkAbout2011 08 08 Consent 207 WTP#1 Lightning Damage COMMISSION AGENDA X CONSENT INFORMATIONAL ITEM 207 PUBLIC HEARING REGULAR KSKL MGR /DEPT August 8, 2011 Meeting Authorization REQUEST: Utility Department requesting Authorization for Emergency Repairs to Water Treatment Plant #1 Sustained from Lightning Damage SYNOPSIS: This authorization is requested due to lightning damage at Water Treatment Plant #1 on Northern Way which caused extensive damage to the instrumentation, controls, motors and generator capabilities of the City’s main water supply facility. The main portion of the repairs to be performed by Thompson Electric Company of Winter Park are estimated at $85,000. CONSIDERATIONS: th Water Treatment Plant #1 on Northern Way was struck by lightning on July 15. The Lead Water Plant Operator was on site at the time and was able to manually operate the facility to maintain system pressure. Thompson Electric was contacted to assess the extent of damages and they immediately responded. WTP#1 supplies about 60% of the total potable water consumed in the City. Thompson Electric was the low bidder on the WTP#2 Electrical Improvements that were completed last year and they did an excellent job. City staff has already ordered or replaced approximately $35,000 worth replacement parts within staff capabilities. These include; 150 HP motor, pressure transducer, chart recorders, chlorinator, chlorine analyzer, flow meter, SCADA radio, fax/scanner, alarm and desktop computer. In addition, some components need to be installed by a licensed electrician which will be provided by Thompson Electric Company. The major replacement components to be provided and installed by Thompson are; two Variable Frequency Drives, two soft starts, City Commission – Regular Meeting August 8, 2011 Consent Agenda Item #207 Page 2 of 3 1200 amp generator transfer switch, new wire feeds, mounting kits, cable assemblies, and programming. The electrical controls for this facility were last upgraded in 1992 so modifications will be limited to storm damage or code required changes. The estimated cost for Thompson Electric to provide and install the aforementioned equipment is $85,000. Due to the emergency nature of these repairs, waiver of the bidding procedures is also requested. Staff has filed a claim with the City’s insurer carrier, the Florida League of Cities, for the damages. All work is anticipated to be complete within three weeks. FISCAL IMPACT: The total cost for the lightning damage is estimated at $116,000. A claim has been filed with the League of Cities which is subject to a $1,000 deductible. Approximately $35,000 worth of replacement parts have been or will be purchased and installed by City staff. Thompson Electric’s scope for the remaining work is estimated at $85,000. COMMUNICATION EFFORTS: This Agenda Item Has Been Electronically Forwarded To The Mayor And City Commission, City Manager, City Attorney/Staff, And All eAlert/eCitizen Recipients; And Is Available On The City’s Website, LaserFiche, And The City’s Server. Additionally, Portions Of This Agenda Item Are Typed Verbatim On The Respective Meeting Agenda Which Has Also Been Electronically Forwarded To The Individuals Noted Above; And Which Is Also Available On The City’s Website, LaserFiche, And The City’s Server; Has Been Sent To City Staff, Media/Press Representatives Who Have Requested Agendas/Agenda Item Information, Homeowner’s Associations/Representatives On File With The City, And All Individuals Who Have Requested Such Information; And Has Been Posted Outside City Hall; Posted Inside City Hall With Additional Copies Available For The General Public; And Posted At Five (5) Different Locations Around The City. This Agenda Item Is Also Available To Any New Individual Requestors. City Staff Is Always Willing To Discuss This Or Any Agenda Item With Any Interested Individuals. 2011 08 08 Consent 207 WTP#1 Lightning Damage City Commission – Regular Meeting August 8, 2011 Consent Agenda Item #207 Page 3 of 3 RECOMMENDATION: Staff recommends that the Commission authorize the City Manager to waive the bidding procedure for the water plant #1 emergency repairs and also authorize the City Manager to issue a purchase order to Thompson Electric Company for up to $85,000 for emergency repairs payable from the Utility Enterprise Fund. Insurance reimbursement for all out of pocket expenses is anticipated from the City’s insurance carrier less the deductible. ATTACHMENTS: None 2011 08 08 Consent 207 WTP#1 Lightning Damage