Loading...
HomeMy WebLinkAbout2011 02 14 Consent 202 Authorization to Hire Reynolds Inliner, LLC to Perform Sanitary Sewer Line Rehab COMMISSION AGENDA CONSENT X INFORMATIONAL ITEM 202 PUBLIC HEARING REGULAR February 14, 2011 MGR /DEPT / Meeting Authorization REQUEST: The Utility Department is requesting authorization to hire Reynolds Inliner, LLC to perform Sanitary Sewer Line Rehab by Piggybacking off of the City of Orlando Florida Contract Number BI09 -2570, Cured- in- Place Pipe rehabilitation. SYNOPSIS: The purpose of this Board item is to request authorization to piggyback off of the City of Orlando Contract No. BI09 -2570 with Reynolds Inliner, LLC for relining of sanitary sewer lines at a total cost of $201,230.00. CONSIDERATIONS: This project is needed for the maintenance and rehabilitation of the sanitary sewer collection system. The Utility Department budgets annually for sewer line rehabilitation. The Cured -in -Place process, a trenchless technology is the preferred method of rehabbing the sewer lines by the City. The Cured -in -Place process is a folded high- density polyethylene pipe that is pulled through the existing sewer line and expanded and cured in place. No excavating, digging or restoration is required. The amount of sanitary sewer mains we intend to rehab at this time is as follows: 2,514' of 8" and 2,831' of 10 ". The cost for lining per lineal foot is $35.00 for 8" and $40.00 per lineal foot for 10 ". The total cost for this sanitary sewer rehabilitation project will be $201,230.00. These pipes and structures average 46 years old. The general locations are Albert Street, David Street, Charles Street, Bennett Street, Frank Street, Flamingo Avenue, and North Alderwood Street. Consent Agenda Item 202 February 14, 2011 Page 2 FISCAL IMPACT: The Utility Department budgeted $250,000 in the Renewal and Replacement fund for sewer and manhole relining. The project cost of $201,230.00 will be paid from this fund. Funds will be expended over the next 90 days. COMMUNICATION EFFORTS: This Agenda Item has been forwarded to the Mayor and City Commission; City Manager; City Attorney /Staff; placed in Press Packets; placed in the City Hall (Lobby) City Commission Meeting binder; and is available on the City's Website, LaserFiche, and the City's Server. Additionally, information related to this Agenda Item has been sent to media/press representatives who have requested Agendas/Agenda Item information, all Homeowner's Associations on file with the City, all individuals who have requested Agendas/Agenda Item information, Department Directors; and also posted outside City Hall; posted inside City Hall with additional copies available for the general public; and posted at five (5) different locations around the City. In addition, residents in the affected areas will be notified prior to the work being performed. RECOMMENDATION: It is recommended that authorization be granted to piggyback off the City of Orlando Contract No. BI09 -2570 with Reynolds Inliner, LLC for rehabilitation of sanitary sewer lines and manhole reconstruction a cost of $201,230.00 payable from the Utility Renewal and Replacement line code (3610- 65000- 30030). ATTACHMENTS: None