Loading...
HomeMy WebLinkAboutFlorida Department of Transportation Local Agency Agreement Right-Turn Deceleration Lane on SR 434 at Hayes Road, Supplemental - 2009 11 24 • 525-010 -32 PRODUCTION SUPPORT 02/09 Page 1 of 3 SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN 1 LOCAL AGENCY PROGRAM 426326 - - 5801 DUNS NO. SUPPLEMENTAL CONTRACT NO. 80- 939 -7102 AGREEMENT APM94 The STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION & CITY OF WINTER SPRINGS desires to supplement the original Agreement entered into and executed on August 14 , 2009 as identified above. All provisions in the original Agreement and supplements, if any, remain in effect except as expressly modified by this supplement. The changes to the Agreement and supplements, if any, are described as follows: PROJECT DESCRIPTION Name Intersection Improvements Length 0.05 miles Termini SR 434 and Hayes Road Description of Work: Construction of a right turn, deceleration lane on eastbound SR434 at Hayes Road. The taper for the turn lane begins approximately 350 feet west of the Hayes Road center lane. The project includes the relocation of the existing sidewalk, drainage structures, and sidewalk ramps with detectable warnings, signage, and pavement markings. The project length is 0.05 miles. SPECIAL CONSIDERATIONS BY AGENCY: Pursuant to Paragraph 4.0 of the Local Agency Program Agreement, the Agency and the Department acknowledge and agree that the schedule of funding for construction that includes the authorized and encumbered federal funding for this American Recovery and reinvestment Act (ARRA) project shall be increased to an amount equal to the Agency's construction contract award amount of $141,998.00 plus the amount of the Agency's original CEI estimated amount of $21,035.72, for a total amount of $163,033.72. Said revision is reflected on the Schedule of Funding, attached hereto and incorporated herein, as Exhibit "A 525 -010-32 PRODUCTION SUPPORT 02/09 Page 2 of 3 SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN LOCAL AGENCY PROGRAM 1 S UPPLEMENTAL 426326 DUNS NO. AGREEMENT CONTRACT NO. 80- 939 -7102 APM94 FUNDING TYPE OF WORK By Fiscal Year ( ( (3) (4) (5) PREVIOUS TOTAL ADDITIONAL CURRENT TOTAL TOTAL AGENCY TOTAL STATE & PROJECT FUNDS PROJECT FUNDS PROJECT FUNDS FUNDS FEDERAL FUNDS Planning 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total Planning Cost $0.00 $0.00 $0.00 $0.00 $0.00 Project Development & Environment (PD &E) 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total PD &E Cost $0.00 $0.00 $0.00 $0.00 $0.00 Design 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total Design Cost $0.00 $0.00 $0.00 $0.00 $0.00 Right -of -Way 2007 -2008 2008 -2009 2009 -2010 2010 -2011 Total Right -of -Way Cost $0.00 $0.00 $0.00 $0.00 $0.00 Construction 2007 -2008 2008 -2009 2009 -2010 $125,000.00 $16,998.00 $141,998.00 $141,998.00 $141,998.00 2010 -2011 Total Construction Cost $125,000.00 $16,998.00 $141,998.00 $141,998.00 $141,998.00 Construction Engineering and Inspection (CEI) 2007 -2008 2008 -2009 2009 -2010 $21,036.00 $21,036.00 $21,036.00 $21,036.00 2010 -2011 Total CEI Cost $0.00 $21,036.00 $21,036.00 $21,036.00 $21,036.00 Total Construction & CEI Costs $125,000.00 $38,034.00 $163,034.00 $163,034.00 $163,034.00 TOTAL COST OF THE PROJECT $125,000.00 $38,034.00 $163,034.00 $163,034.00 $163,034.00 Project was awarded @$141,998 for construction and $21,036 for CEI. Total cost is $163,034. Additional $38,034 will be added from 426330 -2 -5801. f 525 - 010-32 PRODUCTION SUPPORT 02109 Page 3 of 3 SUPPLEMENTAL NO. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FPN 1 LOCAL AGENCY PROGRAM SUPPLEMENTAL 426326 DUNS NO. AGREEMENT CONTRACT NO. 80- 939 -7102 APM94 IN WITNESS WHEREOF, the parties have caused these presents to be executed the day and year first above written. AGENCY CITY OF WINTER SPRINGS STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION By: / 7 Ke By: Na vL.; , Smith Name: Rise' K. Wall Title: City P4a. gager Title: Director of Transportation Support 1, ', Attest: , '� XJ l-UAC_— Attest: a e: Joan L. Brown Name: c � tl_. Deputy City Clerk Title: D.ie: . Date: As to form: As to form: Attorney A ony A. Garganese District Attorney See attached Encumbrance Form for date of funding approval by Comptroller. 4 40 - rER S CITY OF WINTER SPRINGS SO PUBLIC PUBLIC WORKS DEPARTMENT 1126 STATE ROAD 434 cn WINTER SPRINGS, FL 32708 -, c�,n� • Incorporated 3�'� 1959 407- 327 -7597 . FAX:407- 327 -6695 NOV 1 9 2009 i �'f nF rN + ' GITVR t EP MEMORANDUM TO: City Clerk's Office FROM: Brian Fields, City Engineer DATE: November 19, 2009 SUBJ: FDOT Local Agency Program Supplemental Agreement — SR 434 and Hayes Road Please request that the City Manager sign all three copies of the enclosed agreement, along with one witness signature and the City Attorney's signature. The signature page is on page 3. Please return all three copies to me and I will forward them to FDOT for their signatures. FDOT will return one fully executed copy to the City. Please try to have these documents signed by November 24, 2009. Authorization to enter into the LAP Agreement was approved by the City Commission at the May 26, 2009 meeting, consent item #201. This amendment increases the dollar amount of the agreement based on the actual costs of the work.