Loading...
HomeMy WebLinkAbout2004 06 28 Consent 206 .' J' COMMISSION AGENDA I-TEM 206 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR June 28, 2004 Meeting MGR fZ-16EPT ;/1- Authorization REQUEST: Public Works Department Requesting Authorization to Piggyback ofT of the Seminole County contract for the Design of the Hayes Road and Moss Road eastbound Deceleration Lanes PURPOSE: The purpose of this Board item is to request authorization to Piggyback off of Seminole County contract (PS-590-01IBJC) for the Design of the Hayes Road and Moss Road eastbound Turn Deceleration Lanes with PEC, Inc. at a cost of $36,459.20. CONSIDERATIONS: This authorization is needed to perform the design work for the addition of the eastbound deceleration lanes at Moss Road and Hayes Road. It is imperative that this work be performed now so that appropriate adjustments to the S.R. 434 Improvement project can be made up to and possibly including construction. We are proposing to piggyback off of Seminole County's Minor Roadway contract (pS- 590-01IBJC) with PEC, Inc. of Orlando. The scope of work includes surveying, right of way determination, auger borings, utility coordination, coordination with Seminole County and FDOT, and preparation of construction plans and documents. The scope is to be completed within 60 days so as to not hold up the S.R. Improvement Project. FUNDING: The funding source for the design cost of $36,459.20 is from the Road Improvement Fund. $40,000 would be transferred from the Traffic Calming project 115-65000-30012 to this new Deceleration Lane project. This project would be eligible for reimbursement from the One Cent Sales Tax. The funds for this project will be expended over the next 90 days. June 28, 2004 Consent Agenda Item 206 Page 2 RECOMMENDA TION: It is recommended that authorization be given to Piggyback off of Seminole County contract (pS-590-01fBJC) for the Design of the Hayes Road and Moss Road eastbound Turn Deceleration Lanes with PEC, Inc. at a cost of $36,459.20 payable from the Road Improvement Fund - (115-65000). IMPLEMENTATION SCHEDULE: The scope of services will be completed within 60 days of approval in order to minimize any impact on the S.R. 434 Improvements schedule. Any costs associated with incorporation of this project into the S.R. 434 Project will be brought for Commission consideration when appropriate. ATTACHMENTS: 1. PEC Inc. Proposal COMMISSION ACTION: Attachment No.1 PEC/Professional Engineering Consultants, Ine June 7, 2004 Mr. Kipton Lockcuff, P.E. Public Works Director/ Utilities Engineer City of Winter Springs 1126 E. State Road 434 Winter Springs, Florida 32708 Via fax (407) 327-6695 RE: State Road 434 / Moss Road and Hayes Road Intersection Improvements Proposal for Professional Engineering Services Dear Mr. Lockcuff: Professional Engineering Consultants, Inc. (PEC) is pleased to present this proposal for professional engineering design, analysis and permitting services for the State Road 434 / Moss Road and Hayes Road intersection improvements project which consists of the addition of eastbound right-turn deceleration lanes at both intersections. The terms of this proposal are consistent with our continuous Seminole County Minor Roadway and MSBU Design contract (PS-590-01/BJC) terms and conditions, including manhours and hourly rates. PEC staff has a great deal of experience in similar projects throughout Central Florida. This experience includes the permitting process through the Florida Department of Transportation District 5 and Seminole County. SCOPE OF SERVICES DesiQn. Construction Plans Preparation and PermittinQ 1 Design topographic survey to include locating all improvements and utilities as evidenced by above ground features or as marked by the designated utility company representative. The coverage/limits of this survey will be sufficient to construct the proposed improvements. 2. Design right-of-way established based on existing right-of-way maps and monumentation. 3. Execute a program of subsurface sampling and field testing. This includes performing auger borings to a depth of 7 f~et for the proposed turn lane widening. ~ 4. Visually classify and stratify representative soil samples in the laboratory using the Unified Soil Classification System. 5. Collect groundwater level measurements and estimate normal wet seasonal high groundwater levels. 6. Prepare complete construction plans in accordance with the latest design standards, design manuals and policies adopted by FOOT and Seminole County as applicable, and in accordance with the City of Winter Springs criteria and preferences. 7. Perform utility coordination. The cost for relocation design of water mains, force mains or gravity sanitary sewer is not included in this proposal. If required, a separate proposal will be provided for approval. 8. Submit the constructioh plans to FOOT and Seminole County for review and approval. 9. Coordinate with Seminole County for the proposed SR 434 improvements in order to minimize conflicts. 10. Coordinate with the developer/engineer at SR 434/Hayes Road Intersection. SCHEDULE A sixty (60) day project schedule is anticipated to complete the construction drawings. This time is exclusive of any review time by FOOT, and Seminole County and the utility owners. Close coordination will be required in order to minimize the review time by the various agencies. PROFESSIONAL FEES Design, Construction Plans Preparation and Permitting..............$36,459.20 The attached sheet provides a breakdown of the man hours and fees. We appreciate the opportunity to submit this proposal and look forward to working with you. If you have any questions, please contact me. Very truly yours, PROFESSIONAL ENGINEERING CONSULTANTS, INC. Fursan S. Munjed, P.E. Project Manager/Associate Principal