Loading...
HomeMy WebLinkAbout2004 07 12 Informational 300 ~ COMMISSION AGENDA July 12, 2004 Meeting f /4- MGR. IDEPT Authorization CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR ITEM 300 REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Badcock Shopping Center - The final site plan, development agreement, and a general depiction of signage were approved at the June 28, 2004, City Commission meeting. per 7/12/04 agenda. Barclay Woods (Townhomes) - The latest iteration of final subdivision/engineering plan for 88 townhouse units on 7.45 acres (219 total parking spaces and no on-street parking) was approved at the June 14,2004, City Commission meeting. per 6/28/04 agenda Bruster's Ice Cream - Plans for a 1,213 square foot ice cream drive-thru facility on 1.35 acres were submitted on May 5, 2004, and were reviewed at the May 18 DRC. The site is located at the southeast comer of Costa Rica Drive and SR 434 and abuts Hacienda Village. The owner and contractor have met with staff and the City Manager. per 7/12/04 agenda Dlutz (Apex)Transmission Shop - The conditional use application, including a concept plan, was approved by the City Commission at its April 26, 2004, meeting, a site plan was submitted on June 7, and the site plan was reviewed at DRC on June 15. per 6/28/04 agenda Dr. Courtney's Office - The base of the building has been re-painted from the previous bright blue. Construction is rapidly approaching a certificate of completion (approval ofthe building shell) and plans have been submitted for 2 tenant build-outs. per 7/12/04 agenda Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was apfroved on March 8, 2004. Clearing has been completed and a meeting was held on April 261 to address the extension of potable water to the site (jack and bore in lieu of directional bore). GCI is .' July 12, 2004 Infonnation Item 300 Page 2 now making preparations for the jack and bore under Sheoah Boulevard to connect to the City's water main. per 6/14/04 agenda JDC Calhoun - Construction continues. Buildings 8, 9,10, 11, 12, 13, and 14 have received certificates of occupancy (COs). Building 1 has received a temporary Certificate of Completion and some Building No. 1 businesses are open (e.g. Tijuana Plats and the art studio). Building 2 architectural renderings and conceptual shell building plans were approved at the March 8, 2004, City Commission meeting. Both teams are proposed to meet on the afternoon of May 24,2004, to review and discuss the building plans for Building 2. City records indicate the following businesses are locating in the JDC Calhoun Town Center: Building 1 - Tijuana Plats (restaurant), an art studio, a coffee shop, and a wine bar cafe; Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon; Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway; Building 10 - Washington Mutual; Building 11 - State Parm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist; Building 12 - Publix; Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular; Building 14 - Papa Via's Take & Bake and China Peast; and Building 15 - Wendy's. A meeting was held on May 12, 2004, to discuss strategies for "taming" SR 434, to make it more "pedestrian friendly." City staff and the applicable consultants (Dover Kohl & Partners, Street Sense, Glatting-Jackson) met with the PDOT and then met with affected property owners. per 6/14/04 agenda Medallion Convenience Store - Pinal engineering/site plans were submitted for a convenience store at the SW comer of SR 434 and Hayes Road, on March 24, 2004. This site is adjacent to the intersection that was demonstrated to need an east-bound right-hand auxiliary turn lane. The plans were reviewed at the April 6, 2004, DRC. Staff is investigating the legality of leaving the existing tanks in the ground. per 6/28/04 agenda Miranda - Site clearing is completed and no further activity has occurred on-site. per 7/12/04 agenda Moss Road Townhomes - At its April 12, 2004, meeting, the City Commission approved the Metropolis Homes conditional use application and concept plan to build as many as 84 condominiums and commercial development on an "L" shaped 9.10 acre site fronting on both SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. per 4/26/04 agenda Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8, 2004, City Commission meeting and a preconstruction meeting was held on March 30. An aesthetic review of the first new building is scheduled for this meeting. per 7/12/04 agenda Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla Office Park) - BJM Associates has submitted a fully executed re-plat. It has been sent to the City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and subsequent certification. A copy of the plat and pertinent support documentation has been July 12,2004 1nfonnation Item 300 Page 3 provided to the City Attorney. Tinklepaugh Surveying reviewed and certified the plat. The plat and supporting documents have been provided to the City Attorney for his review and comment. per 5/24/04 agenda Parkstolle - The FLU amendment was heard by the LP A at its September 3 and October 1, 2003, meetings and had a transmittal hearing at the October 27,2003, City Commission meeting. The Commission adopted Ordinance No. 2003-35 at the January 12, 2004, City Commission meeting. A PUD amendment, final subdivision plan, and final plat have been provided to the City and were reviewed at the March 9, 2004, DRC. Revised plans were resubmitted on April 23 and were reviewed at the May 4,2004 DRC. Staff received (June 16) a traffic study modification, incorporating the AM peak traffic with the new elementary school on SR 419. The plans are scheduled for the July 7,2004, P& Z meeting. per 7/12/04 agenda SR 434 Retail (a.k.a. Villagio) - Vertical construction continues. The final segment of the sanitary sewer construction has been installed. Permits for wall constmction are still pending. The applicant submitted plans on June 15, scheduled for this meeting, to modify the site design to include a drive-thru bank at one of the out-buildings. per 7/12/04 agenda Tuscawilla Square - On June 2, 2004, a preliminary site plan was submitted for Tuscawilla Square, a restaurant and retail development, totaling 13,600 square feet, on 1.41 acres at Gary Hillary Drive (formerly Colt) Drive. The existing Tuscany Restaurant currently occupies a portion of the site. The applicant has been negotiating a development agreement with the City Manager and City Attorney. A re-submittal was provided July 2 and is scheduled for the July 20 DRC. per 07/12/04 agenda Winter Springs Elementary (New -located on SR 419) - Construction continues. State Representative David Mealor, City staff, and the FDOT have been investigating ways to provide safe access to and from the school site. per 4/26/04 agenda Winter Springs Town/zomes - Preliminary plans for approximately 420 town-homes on 40 acres within the Town Center were received from Engle Homes on July 2 and are scheduled for the July 20 DRC. The applicant proposes to modify the park layout set forth in the Town Center code. per 7/12/04 agenda Board of Adjustment - No new variance or conditional use applications have been received. per 7/12/04 agenda FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: