Loading...
HomeMy WebLinkAbout2004 05 24 Informational 300 COMMISSION AGENDA ITEM 300 CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR May 24, 2004 Meeting MGR.,e-- IDEPT Iff Authorization REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Badcock Shopping Center - The traffic study is being reviewed by the City's consultants and the site plan was reviewed at the October 7,2003, DRC. The final site plans were reviewed at the May 5, 2004, P & Z meeting and will be scheduled for the City Commission when the proposed development agreement is reviewed by the City Attorney and any necessary modifications are made. per 5/24/04 agenda. Barclay Woods (Townhomes) - On the afternoon of April 30,2004, the latest iteration of final subdivision/engineering plan for 88 townhouse units on 7.45 acres was submitted for review. The plans were reviewed at the May 10, 2004, City Commission meeting. per 5/24/04 agenda Bruster's Ice Cream - Plans for a 1,213 square foot ice cream drive-thru facility on 1.35 acres were submitted on May 5, 2004, and were reviewed at the May 18 DRC. The site is located at the southeast comer of Costa Rica Drive and SR 434 and abuts Hacienda Village. Per 5/24/04 agenda Dlutz Transmission Shop - The conditional use application, including a concept plan, was approved by the City Commission at its April 26, 2004, meeting. per 5/10/04 agenda Dr. Courtney's Office - Vertical construction continues. Storm-water and sanitary sewer lines have been completed and inspected. per 4/12/04 agenda Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was aprroved on March 8, 2004. Clearing has been completed and a meeting was held on April 26t to address May 24, 2004 Infonnation Item 300 Page 2 the extension of potable water to the site (jack and bore in lieu of directional bore). per 5/1 0/04 agenda JDC Calhoun - Construction continues. Buildings 8, 9, 10, 11, 12, 13, and 14 have received certificates of occupancy (CDs). Building 1 has received a temporary Certificate of Completion and some Building No.1 businesses are open (e.g. Tijuana Flats and the art studio). Building 2 architectural renderings and conceptual shell building plans were approved at the March 8, 2004, City Commission meeting. Both teams are proposed to meet on the afternoon of May 24,2004, to review and discuss the building plans for Building 2. City records indicate the following businesses are locating in the JDC Calhoun Town Center: Building 1 - Tijuana Flats (restaurant), an art studio, and a wine bar cafe; Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon; Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway; Building 10 - Washington Mutual; Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist; Building 12 - Publix; Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular; Building 14 - Papa Via's Take & Bake and China Feast; and Building 15 - Wendy's. A meeting was held on May 12, 2004, to discuss strategies for "taming" SR 434, to make it more "pedestrian friendly." City staff and the applicable consultants (Dover Kohl & Partners, Street Sense, Glatting-Jackson) met with the FDOT and then met with affected property owners. per 5/24/04 agenda Medallion Convenience Store - Final engineering/site plans were submitted for a convenience store at the SW corner of SR 434 and Hayes Road, on March 24, 2004. This site is adjacent to the intersection that was demonstrated to need an east-bound right-hand auxiliary turn lane. The plans were reviewed at the April 6, 2004, DRC. per 4/26/04 agenda Miranda - Site clearing has commenced. per 4/26/04 agenda Moss Road Townhomes - At its April 12, 2004, meeting, the City Commission approved the Metropolis Homes conditional use application and concept plan to build as many as 84 condominiums and commercial development on an "L" shaped 9.10 acre site fronting on both SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. per 4/26/04 agenda Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8, 2004, City Commission meeting and a preconstruction meeting was held on March 30. Construction has not yet begun. per 5/1 0/04 agenda Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawil/a Office Park) - BJM Associates has submitted a fully executed re-plat. It has been sent to the City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and subsequent certification. A copy of the plat and pertinent support documentation has been provided to the City Attorney. Tinklepaugh Surveying reviewed and certified the plat. The May 24, 2004 Infonnation Item 300 Page 3 plat and supporting documents have been provided to the City Attorney for his review and comment. per 5/24/04 agenda Parkstone - The FLU amendment was heard by the LP A at its September 3 and October 1, 2003, meetings and had a transmittal hearing at the October 27,2003, City Commission meeting. The Commission adopted Ordinance No. 2003-35 at the January 12,2004, City Commission meeting. A PUD amendment, final subdivision plan, and final plat have been provided to the City and were reviewed at the March 9, 2004, DRC. Revised plans were resubmitted on April 23 and were reviewed at the May 4, 2004 DRC. Staff still is waiting on a traffic study. per 5/24/04 agenda SR 434 Retail (a.k.a. Villagio) - Vertical construction continues. One segment of the sanitary sewer construction did not take place until building reached a point that the construction of the last section of sanitary will not conflict with vertical facet construction. The contractor has installed this segment of the sewer line. per 5/1 0/04 agenda Wagner's Curve (a.k.a. Heritage Park) - Revised building plans are being reviewed. Staff has been working with the applicant to correct the gazebo. An amendment to the development agreement to modify the rear building setbacks from 20 feet to 15 feet is proposed for this City Commission meeting. per 5/24/04 agenda Winter Springs Elementary (New -located on SR 419) - Construction continues. State Representative David Mealor, City staff, and the FDOT have been investigating ways to provide safe access to and from the school site. per 4/26/04 agenda Board of Adjustment - Two (2) cases are scheduled for the June 3,2004, BOA meeting (one building setback and conditional use). A special meeting is scheduled for May 27 to accommodate an applicant who accidentally transmitted incomplete infom1ation in a variance application for the May meeting. per 5/24/04 agenda FUNDING: None required RECOMMENDATION: None required A TT ACHMENTS: None COMMISSION ACTION: