Loading...
HomeMy WebLinkAbout2004 05 24 Consent 204 COMMISSION AGENDA ITEM 204 Consent X Informational Public Hearings Regular May 24. 2004 Regular Meeting Mgr. / Dept. Authorization NOT USED 'r COMMISSION AGENDA ITEM 205 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR May 24, 2004 Meeting MGRj?- IDEPT /if Authorization REQUEST: Utility Department Requesting Authorization to inter into a contract to install two (2) power variable frequency drive pump controllers by Piggybacking ofT of the State of Florida Purchasing agreement number 2852110-4 PURPOSE: The purpose of this Board item is to request authorization to piggyback off of the State of Florida purchasing agreement number 2852110-4, with Stewarts Electric Motor Works Inc. for the purchase and installation for two (2) 60 horse power variable frequency drives at the West Water Reclamation Facility at a cost of $28,570. CONSIDERA TIONS: This equipment was budgeted to improve the pumpmg capacity of the West Wastewater Treatment Facility reclaimed water distribution system. Variable frequency drives alter the motor rpm to match the system demand. This reduces motor stops and starts which increases the life expectancy of the motor. VFD's also provide a more constant system pressure which reduces system breaks. The price of $28,570.00 includes the purchase, installation of the two (2) drives and training of treatment plant personnel. Stewarts Electric Motor Works is an Orlando company which has previously performed work for the City. FUNDING: The variable frequency drives (VFD) purchase is budgeted for m the Utility Department FY 2003/2004 budget at $50,000 (3600-62100). J Consent Agenda Item 205 May 24, 2004 Page 2 RECOMMENDA TION: It is recommended that authorization be granted to enter into an agreement with Stewart's Electric Motor Works Inc. for the purchase and installation of the variable frequency drives, off of the Florida's State Purchasing Agreement number 2852110-4, at a cost of $28,570 payable from the Utility Department Plants and Mains line code (3600- 62100). IMPLEMENTATION SCHEDULE: This equipment will be delivered and installed within 90 days of entering into an agreement with Stewart's Electric Motor Works Inc. ATTACHMENTS: None COMMISSION ACTION: