Loading...
HomeMy WebLinkAbout2004 05 24 Consent 203 COMMISSION AGENDA ITEM 203 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR May 24, 2004 Meeting MGR ~ IDEPT /~ Authorization REQUEST: Public Works Department Requesting Authorization to Enter in a Contractual Agreement for the installation of roadway underdrains on Coral Way. PURPOSE: The purpose of this Board item is to request authorization to enter into a contractual agreement with, Schuller Contractors, Inc. by piggybacking off of Orange County contract # Y2-1105- TE for the installation of swale underdrains on Coral Way, at a cost of$35,177.50 plus a 10% contingency. CONSIDERA TIONS: This is an ongoing project by the Stormwater Division of Public Works in improving infiltration of stormwater in the existing swales on streets in the Ranchlands Subdivision Sectiori 2 and 2A that are dependent on swale drainage. Historically during heavy rainfall events the swales will convey the surface waters adequately, but after the event the swales do not percolate efficiently. Orange County, Florida currently has an open contract, #Y2-1105- TE, with Schuller Contractors, Inc. for the installation of such underdrain systems which can be piggybacked. The project will include the installation of 1,900 lineal feet of6 inch underdrain with restoration, and the removal and replacement of 17 driveways. The cost for this work is projected to be approximately $35,177.50. FUNDING: This project was budgeted in the current fiscal year from the Stormwater Utility Fund _ Stormwater System line code (63200) at an estimated cost of $40,000.00. The anticipated cost of the project is $35,177.50 and payable from the Stormwater Utility Fund - Stormwater System line code (130-63200). Funds will be expended over the next 90 days. 052404 COMM Consent 203 Coral Way Underdrains.doc Consent Agenda Item 203 May 24, 2004 Page 2 \ '\' \ ~ ' J15: 8";;;1. I .-.. r;, 10 ". ~ . \' \ \. ~I' . -,..-" j."-"~A~L<T"O'~\\-FtD ,,:,<,~-~,:\""\'I\-'~'-- \ _ \ \ I "t vf ..J> \. I Ji' .< \ . " \ I r; " r''':<-'-' ,..' : '\"~: ""T ,.J 9 8 7 I ' ' t < I . \ ~ ' ,', 11 L .' L.........-----1 J ~~ r, 45, - 12 :13 : '; \ C "! -19 20 ;::1 22 23 \,0,4 " '2f, 27 , ).-22 ]-----1 -' ~ 18 T '" ''''" - ~l"..~- III'':'' 2Cl II 32,d \ \~ -", 17.0 ,1': . .1,._--~, .,_.,,-: "'111- ...'.. .....'...... , , 28 '{' ~.c, , . ...l .,< _.,~,,'-, \IV Ii\{ 1. !!,~II!',,~,.:'It '.." / ,v y"'--- ',,- '>'--, -'~ _.~." ra~-{~L.., Wi:Jl'~".",!!!.T'-' ,..- '"7"" .",,~... "."'... ,,' 11 A ! " .. ..)t.;."!!' .'""'-~-' . " "~",!'t '. ' .'- '1 /'~"",~", .. .. lII"_.-' ..0< ",', Ij}" ~"'-".... 'It.... '!o1 iJ '1. ," ~ I -: . _..;..-~ , " T'''':~'I"''' " ..... ,," _\. ,J ',' '. 120 :'O~,~,~~,~ -'~,[\ 9,1) 06 5"',1 ~:~l~' ~~r:':~T-:~~l~ - - "'-'j G,j ~ I~I); ~ I ,-" , .. 14,U 13,0 f-'.;.;~~~-,_,<. ''',,_,4) .30 ',~ ~'7;'Q' ',./ '\, ",',\ m()\ \' / /0:;'/:':" ~ \ '1~' , , ,T j i 1';' 'I 11 \ ,!' , , ,_ /'...... ~ \ , RECOMMENDATION: It is recommended that the City Commission approve authorization to enter into a contractual agreement with Schuller Contractors, Inc. for the installation of underdrains on Coral Way by piggybacking off of Orange County Construction Term contract #Y2-1105-TE at a cost of$35,177,50 plus a 10% contingency. IMPLEMENTATION SCHEDULE: The scope of work will be completed within 90 days of approval. ATTACHMENTS: None COMMISSION ACTION 052404 COMM Consent 203 Coral Way Underdrains.doc