HomeMy WebLinkAbout2004 07 26 Informational 302 ITEM 302 COMMISSION AGENDA Consent Informational Public Hearing Regular x July 26, 2004 Regular Meeting C- Mgr. / Dept. Authorization REQUEST: The Parks and Recreation Department would like to inform the City Commission of the status of the Central Winds Park Expansion. PURPOSE: The purpose of this item is to inform the City Commission of the status of the Central Winds Expansion. CONSIDERATIONS: . On June 28, 2004, Commissioner Blake asked staff to bring information regarding the status of the Central Winds Park Expansion. . On September 9,2002, the City Commission was informed that the estimated costs per Phase I which consisted of Permitting, Design and Engineering, Clearing and Grubbing, Leveling, Sod and Irrigation, were $ 250,000 from remaining Bond funds for development. They were also informed that the estimated costs for Permitting, Design and Engineering, Clearing and Grubbing, Leveling, Retention, Paving, and Landscaping for the Central Winds Park Boulevard were $ 300,000 from I-Cent sales tax. CENTRAL WINDS PARK EXPANSION: . To date $ 517,525 has been expended from remaining Bond Funds and FRDAP Grant #4 & #5 for Permitting, Design and Engineering, Surveying, Clearing and Grubbing, Grading, Piping, Pump Station, and Equipment. . Remaining expenses are preliminary estimated at: Irrigation $ 80,000 SoddinglSpriging Sea-Isle Paspalum $ 250,000 Ball-field Clay $ 30,000 4 backstops $ 60,000 *Playground renovation & Bike Trail $ 100,000 Contingency $ 29,255 Total $ 549.255 * The playground renovation and bike trail funding will be adjusted depending on the actual costs of the other four listed projects. But some element is needed to meet FRDAP # 6 grant requirements. Central Winds Park Expansion Funding Bond FRDAP #4 FRDAP #5 LWCF Park Impact Fee (Bond) FRDAP #6 $ 224,180 $ 199,400 $ 143,200 $ 200,000 $ 100,000 $ 200,000 Projected Total $1.066.780 Estimated completion date November 2004. TOWN CENTER/CENTRAL WINDS PARKWAY . To date $ 276,263 has been expended or encumbered for Permitting, Design and Engineering, Surveying, and Storm Water Piping. . Remaining expenses are Roadway Construction preliminary estimated at $ 400,000. All funding is from I-Cent sales tax. . The Continuation of the Parkway through the Central Winds Park Passive area and down the Wincey Property to 434 is not yet budgeted. Town Center/Central Winds Parkway Funding I-Cent Sales Tax 676-263 Projected Total $ 676.263 Estimated completion date September 2005. FUNDING: See Above. RECOMMENDATIONS: N/A Informational. ATTACHMENTS: COMMISSION ACTION: