HomeMy WebLinkAbout2004 09 20 Informational 303 COMMISSION AGENDA ITEM 303 Consent Informational X Public Hearing Regular ~ September lJ. 2004 , Regular Meeting fL/gp Mgr. / Dept. Authorization REQUEST: Information Services wishes to update the commission on the status of the I.T. Plan created in FY 2002. PURPOSE: The purpose of this item is to update the commission on the LT. Plan which was created in FY 2002. Additional projects and tasks have also been added to the end of this document. CONSIDERATIONS: See attached Projects worksheet The Information Services (I.S.) Department strives to complete assigned projects in a timely manner. However, things sometimes happen that prohibit us from meeting those deadlines. Thus, we are forced to move our projected completion dates further out. FUNDING: RECOMMENDATIONS: ATTACHMENTS: COMMISSION ACTION: None None LT. Projects worksheet - Attachment 1 (7 pages) S:\Information _ Serviees\Admin _ Docs\Agenda Items\FY 2004\2004 September\091304 _ COMM _ Informational_303 _Information _ TeehnologL Plan _ Update. doe I.T. Strategic Plan Status of Projects for FY 2004 lttfonnallon rl!chnology WNNI.wt.n1:Orul!nftOSILOtg I I Items ! Original completed as ! I Project Project Projected oflhls date i I Number Due Date September 13. , 2004 denoted I i I with../' Revised Quei - Date ~ Comments I.T. Strategic Plan ProJects and Tasks ""101 C:entrallzed Back"p -City Hall 51.de (I.oulel ~ - N~~oM;ockup an~lvsis performed 913012003 ./ - I 101-b Obtain Commission authorization to purchase eaulpment from state contract 9/3012003 ./ 101-c EQuipment and software purchase - 9/3ll12OO3 ./ 101-d Installation & Implementation - General ~e!Xers 1113012003 ./ 101-e RMAN confiQ 6/1012004 ./ 101-t Installation & Implementation. SOL & Oracle 613012004 ./ I ----- ~ Testif'l!:l of database. restores I. _6/2012004 I !1/27/2004 waitinq on Oracle 9i CD; load onto web reporter server for testino purposes ~ Clt;y F9f!J1~C9f!Y.erslon to PDF fJacQui) _ __ _ I 10/3112003 ! , !WiII re-assi~n this to new Web/MultiMedia Technician - 103-a Research departmental forms and establish Qlan for conversion in oroaress 1011/2004 ~ Bepin Implementation of conversion plan I 12/3112003 ; not vet started ; 1/212005 I ~ Document Ma_n~~in~nt ::;ystem (JOicqui & ~MS T ear.n) 104-a Retain consultant I 11/1112003 I ./ I ---1 l04-b Research and puttil1Q tOQether implementation plan __ ; 2129/03 I ./ ; "--- - -- --- 104.c FLC submits clan to City Staff for revisions and approval - : 412612004 ./ ---- 104-d FLC submits plan to City CommissiOn for al?oroval I 512412004 I 6/23/2004 104-0 BeQin plan implementation - I 512512004 6/2412004 ----- ~ End plan implementation (pcal date) I 9/30120051 ! plan is 3 year plan fY 04.06 with onooinQ costs after the 3 years -- ~ Munl~ 200:4 Re~s-eJll)plementation (JacQull Load into test _ _ _ ___.___ I 712712004 i ./ ' I l06-a j 106-b load 2004 dient on user machJ!.1es - completioo_ __ ___ I 8/412004 : 11/1912: i Finance has requested that we move this up to a higher priority; we moved Munis receiving to a 106-c Testino complete .. - -- 7/1212004, =1 ~~~004 1 lower priority in order to make this happen 1 Q6..d Traininq .-- l06-e U"made Unix O/S from 5.05 to 5.07 OR 5.5 - --~ -r---=.=- 111012005 , ~ Load into live - - - --- I 813012004 ! : 1 -- --,1.gL M~nis E~lI~~se 9~~r Implementation (JaeQul) _.. _ I I==-J 107.a BeQin research (interview deots. research copies. location of documents. etc) Ibd I ~ _ Process DesiQn -- -~------ k Ibd t 107-c Setup with ForMunis !Q<.! 1 ---1This has been moved to a lower priority in order to accommodate Finance request for Munis ~ Implement & OlA Ibd I ICrvstal Reoorts and Munis 2004lm"lementati"n ~ Munls "Accitita~ce of credit cards for utility bill pavments /Jacq"y I I I I llJ9.a Establish Financial/credit card pOlicies (Requtar G - Jutv 14, 2003 Commission Meetina) 1 9/3012003 ./ llJ9.b Started over on this proiect - issues with vendor and contract I 11212004 I ./ I I 109-c ResearchillQ OPC & SpeedPav 5f712004 ./ I I 1lJ9.d Determine best vendor -- 5n12004 ./ llJ9.e Finance and 1.5. Questions answ.!red ---~- 512812004 , ./ , 109-t Commission approval of vendor ; 6/1412004 I 1011112004 : 109-a Create Policy (Finance) : 7/13/2004 , ! 8/2012004 , llJ9.h PoliCY revie..v bv Finance and 1.5. 6/2512004 I I 1Q9..i POlicy revie..v bY City attorney ----- I 101112004 ; llJ9.' Commission approval of oolicv. vendor and plan I 1011112004/ 1011112004 I 1lJ9.k T estino Complete 1113012004 I ~ Trainil1Q complete I 1113012004: I , llJ9.m . Advertisina and publidsina of this credit cardcaoabilitv I 11112005 I i ~ Full implementation of credit cards for utility bill payments ! 11112005 i I I _. - ---- --- ~ .Munls - BankQraftl~g'ro< "Wity bill ~.nts tJaCQuil I r--- lll}.a Testil1Q - Prenotes - 4 cycles (Aoril22 - May 20) 512012OO4 i ./ i 110-b TestinQ - Bank Drafts - 4 cvctes (June 22 - Jutv 13) I 712012004 ./ i 11O-c Policy creation 713112004 , ./ I100d POlicy Revle..v: 1.5. -- 6/2012004 i or I I I100e Policy Review: leQal 9/1/2004 , ./ 110-1 Commission approval of Policy 9/13/2004 ./ 110-0 Mailoutslapplications to residents complete 1 012012004 ' I --- I100h live Prenotes to bank - 4 CYCles 1113012004 I 1 110-1 Live Bank Drafts - 4 nKies I 12/3012004 I : I "_IHi~ ~TE"rr~~..to"eo...r........ ~1of7 I.T. Strategic Plan Status of Projects for FY 2004 Project Number I I Items i ~ Original I completed as 1 I Projected I of this date, I I Due Date ~~~;e~~t~~' I I with ./ Revised Duel I Date Project - Muiifs Receiving (automated receiving of goods and servICes-~ Pu-rehase orders) _ -1.1.L.... JacQul 112-a Set UP trainioQ 112-b Testinn & TraininQ for small test aroup 112-c TraininQ ~ . !~Dlem~nt_ _ _ ~ MultjM.d_~ ProtfuctlQns ~ _ C.re~"t~ rnyltimedia prOductions for SGTV ____ ~ City Hall Acce~s ~ _ISLo~s~ l"_IQbJtt (th!S proiec~ was c~tout .for FY 03 and FY 04 bv City Manaper) ~ Qfcu.l1allona! License Fee Collection for County IJacQul) 116-a finish data entry 115-b form modifications 116-c testina of fonns 11 f.Hj report creation 116-e report testina & dean up 116-1 tralnil1Q for end user ~ redesian Process. _ __ I 5/15/2004 I T 6/18/2004 T 8/25/2004 I 8/28/2004 I I I 5/3112004 5/3112004 -- ._--t~~= -._~-- ---7I9i2OO4 tbd f---,1!L Crystal Reports - Train the Trainer (cl;lsses 1 & 2 of 4) - 60 davs to finish (JacQul) 117-a class 1 of 2 f-!!l:!!- class 2 of 2_ ~ C_rvStalRePQrts Enterprjse Setup IJacQul 8. Team) 118--a purchase server 118-b beqin implementauon 118-c trainillQ for JacaUi 118-d trainil1Q for users ~ oroiect ~mQ!eti~(I_ _ _ _ ~ Colle~lcm a"d creation of Wireless OOCUI'!'I~~.iI!!on (~iJn ~. Document wireless eQuioment (Access Points. Print Servers) 123.b Basic Standard ConflQuraton for Access Points ~ _ Wireless Host Confi!1uration ~ Create orocedureJor addinp wireless di~nts ~ ~ebSe~ ~foJ1fig!J.@Ucm 126-a WebSense reloaded ~ Reconfi~ure ~ Exchange Reports and Monitorfng ~ Exchange 2003 Migration (BI/I & Loulel i---llL- Pix 520 FiO!wall O!configuratlon (Bill) ~ McAfee Gro~gshlj!ld on El<C~Qg. ~rver (Louie) ~ Install and ~nfiqu~e pr~yi~us version ~ USB Handhelds IDatamatlc) ~ So.rver/Cllent DeJragmeQlatlon_aggll"'!ti<>!] (p!s!<Keeperl Server install of Oiskkeeper . installed on CH1. CHServices. WSmaif1. wspd _ 1 extra i 36-a JJOssibiv wiii insiaii on PO services server Client side - awaitifl!1 Quote for site license (Louie) - may be too exoensive order client licenses _ receive and install dient license ~ Web Site Enhancements paCQul & Tea_m) _ . 137-a Separate web paQe for Utility Billina to indude aarbaQe issues 137-b Creation of LS. Paoe on Intranet web site 137-c Imorovements to 1.5. paqe on Internet web site mission statement Qoals iOb duties/responsibilities services orovided I 5/31/2004 ~ r 7/25/2004 ! 5/31/2004 : ---- j 611/2004= ==r-6/mOO4 I - - t' 6/15/2004 I 6130/2004 6/15/2004 I I 6/15/2004 i 6/15/2004 6/15/2004 I 411312004 i 71212004 I 611612004 1/3112005 913012004 i 5/21/2004 I 5/28/2004 I I I 5118/2004 6/15/2004 i 6/15/2004 6130/2004 6/18/2004 ' 8/25/2004 ' ; I I I 136-b R-.wlH/2DCOI UASl(IlITPrqocv.~lDlI"'lD~"""" Comments I 1M tbd tbd Jbd This has been moved to a lower priority in order to accommodate Finance request for Munis Crystal Reports and Munis 2004 implementation. Wait until after Munis 2004 release implementation I I I ./ I I ./ I "' -: ./ I ~ress ! 101112004 ; ./ I~-l I ~ ~yjVia to revie'N discrepancY in reQQrts - then forward to County ./ reschedule .:~ I -- ..- tbd 9)20 . 9/23 1/10.'2004 1.'24;2005 - ./ I , - ~ -- - - tbd - -- tbd Ibd ./ - I I I 1011/2004 - 1 3/31/2005 I 11/30/2004 I 00112004 will wait until after mi!1ration to Excha!)ge 2003 (See item 130) ./ -I 1 I ~---- Quotes came in around $10,000. Not in current budget. Would need addItional appropriation this year OR budget for next year. tbd tbd I tbd ./ 1 1 , tbd I ; tbd I tbd tbd I fbfj I 1 tbd I On hold. Web position currentJy vacant Postpone this until September 2004 P-o- 2Df7 I I : Items Ortglnal ! completed as Projected I ofthls date I Due Date I ~~e:~~~~. I I with'" Revised Duel' Date I I Ibd , Project Number Project I--- ~ CI}.rrel}t and future prefects ~ Kiva Upgrad.es (JacQui) 138-a UPQrade database to Oracle 9i. beain project 138-b Additional user trainina needed for enhancements/new features ~ ,_ UPQr~~e Kiva application to 7.X ~ Domain migration 'rom Windows 2000 to Windows 2003 (Bill & Team) ~ 2003 Domain Controller in prep for domain uPQrade ~ mtQration to new server ~ P~'1ta!!li!tion - migration to new server (Bill) 157-3 obtain Quotes & order hardware 157-b install & confiQure server & Unix OS 157-c install & conflQure hardware - powervautl backup ~ -install &. &enfia~re &etr"3r:e I 'nix GOCr-atiR", system 157-e install & confiQure software -Informix Database ~ miRrate P~nta~ation database over to new server ~ Polic;.tes toJ)~ written $ Foons 19 revise (Joanne & Team) 15~a Architectural Standards Policy 15~b T echnoloov Policies & Procedures plan 158-c Disaster Recovery Plan 15~d Wireless Policy - possibly combine with complier use & peripheral device policv ~- 158-<11 Policy Creation ~ Staff Revisions _ _~_ _ _ _ ~ Attornevrevie'IN ~"_ Commission approval ___. _ ___~___ ~ Reouest for MultiMedia Servi~ __ _____ 158-1 Go To MvPC 15A...n New and Deoartina User Forms ____ 158-h Proiects Reauest and Status Form lS8-i Software/Application Troubleshootino Procedure 158-. Network Paqinq Procedure Computer Use Police. Revision needed - possibly combine with peripheral use and 15~k wireless policy Peripheral Devices Access Policy. possibly combine with computer use and wireless 158-1 DOlicy 158-m Web Posting DOllcy ~ Overtime and callout DOlicy ~ Fulll~p'ementation of Blue Oce~n Track..ftllJacQui & Louie) 159-a Table deanup 1Sg..b User Imoort 159-c Set up auditil"lR 159-d User trainiJ'1Q ~ Go live . ~ Issue Paper to be written for discussion (JaCQul) ~ Com_m~rdal. C~_tomer_Enterpris~ Se~p re: busi~s Iicens.e. lJtilitv cu.stom~r.__~to~er # ! ~ Muni~ Messenger. approvals and notifications lJaCQui) 161-a Testina 161-b How-to doc sent out ~ _ proiect comp_l~te ~ Munl~ E;f1t1~[lcement Requests (JaCQul) 162-a UB Form Uodate 162-b Delinquent bill form revision ~ D~inQl!.ent card indices revisior:! ~ Resource Reservation System via calendaring (Louie) ~ Pix Firewall Replacement/Set up DMZI1SA Implementation (Bill & Louie' ~ Network Securtty AudU 166 AD/GPo/OU rerun & nollcles creation /BIII Louie Adam I 7/3112004 I 8/2012004 . I 8/31/2004 I 12/3112004 12/3112004 I 5/1412004 I 71912004 7/912004 Ibd r= ! 8/1112004, ./ 8/1112004 , 12/3112003 I 12/3112003 12/3112003 I .J.- 512612004 I .1- 512612004 ! ::=1 8/30120041 '" I , : , . I : I i7l16120041 I 911312004 I 913012004: 110113/2004 I , 1012712004 i I 6/18/2004 I ! 5110120041 5/1212004 L- i 5/1212004 I I 8/13/2004 I : 7/112004 5/1512004 J 7/3112004 12/3 t 12004 8/3112004 ~17,'2OOl YA$ttRIT~~IO"IO~_'" I.T. Strategic Plan Status of Projects for FY 2004 Comments I ! I lAtter attending the Kiva Conference. I recommend we relook at this project and carefully consider what needs to be done. Should wait until Kiva Administrator position is filled in October 04. Ibd lbd lbd ./ ./ ./ I~ I I I : i ! 9/3012004 ! miQration done but not workif'l!:l. Bill in touch with Pentamation on fixillQ this problem. -- in pmnress in prOQress in pfOQress lbd Ibd 'bd J__ _____ I I , 'bd : tbd -i-ttid---- -- lbd I lb ; This item (#15Bd}must wait until after Commission decides which wireless option they choose. ~ tbd Ibd Ibd ! 9/1il2~~eed to do priorities table and dates functionality I -t-- I , I I I I , 1013112004 I I 101112004 I 101112004 I I 10/112004 : ./ 913012004 ! waitiflQ on BL to be comoleted first Then GBF will work on this form. ./ on hold p.g. 3017 Project Number Project ~ Police Oepartmenl implementation and lestino 166-b review rest of City 16~c implement policies f.-=c-.. .- .. .--.-.. - _ _ ------ .- ~ Resolve issue of Public Records redaction on UB Online (JacQui) ~ IdentincationlSecurity Badges ~ Automate posting of agendas & minutes for Clerk's Office IJacQul) ~ Add bid automation to web site bid application IJacQui) ~ Automate agenda items posting for Projects Clerk (JacQui) ~ Munis Admin and Forms Oef Training - after 2004 upgrade (October 2004) 180 Muois Crystal Reports (priority/partial project) - this is not the entire Munls CrystaJ ~ Implementa~ion (JacQui) 180-a load Crystal on 2 machines 1 BO-b set UP tables and views 18{)..c downloadreports_n ..______ 180-d test reports 180-e ao live ~ ~" draft. cammeDt ~nd c:oncem document to Finance reqardil1Q Crystc3:1 -----1!!!.- J)jr~g ~91:IfigJ;ti9!l5 via SMTp 181-3 APe PowerChute UPS Software -1!!.:!..:!!... LanSafe PowerWare UPS Software -.- - ~ Publ}c \Vorks Comole,x Oa\a & Ppone Communications 182.a Plannino phase with Public Works _ ____ ~ Imple~ - fiber & CQ!ld,yit infrastructure 182-c Implementation - data equipment 182-d Implementation. ohone equipment ---~ ~ ~rry~e~e_ntation ~ kevl~ss entry eouioment (Buildil1Qs 1 & 3) ~ E-Billing 10, Utility Bills 183-a Check for Munis feature availability 183-b Submit enhancement reQuest to Munis 183-c Submit enhancement Quote to City Manaqer 183-d Research ~ Take item back to Commission as Repufar AQenda Item --1!!L.. OepOSll.Relunds 10rUtllj1v Billing 184.a Review with Utility BilIil1Q 184.b Munis Traini~ 184-c BURS found- reported to Munis_____ 1 B4-d Buo Fix 2004.03 to be loaded ~ Imolef'!1ent proc~s _ ~ !l~II~~th Ph.one B.ock Project installinn and testino complete I-----:-==-- implementation to laptops & desktops ~ 7777?77?77?7777 ~ Compliancewith CJIS (FOLE/FBII Security on all MCT's with FCIC Access (Adam) ~ Ptannlng and Implementation 01 Xcad (Adam) ~ Installation/Implementation of keVJess door entry system (Adam) ~ ADply and Install PKI Certificate. for all PO (C]netl (Adam) c.-.1l!L Relocation of Pat(ol DivisIon to llOW Addition (Adam) 191-.a Plannirlf] and Installation of new Cisco 3750 ~ Relocation of EQuipment (PC's Printers Copiers Phones, Etcl ~ Upgrades to PO Switches to new Cisco 105 12.1-19Ea1D ~ ImplementationfTralnlng and Installation of New Power 911 Consoles ~ Upgrade Video Devices In Building ~ Implementation of MATRIX 2.0 Access for Investigations on Workstations --m- ::~::::~:::~~ :~~ ~~~~~~~e:t~f~:::~~~~':: ~:I~~: ~v~~~ ~"7,~ UASTEI'lIT PIqlIOClO s..r-_ ...~... ec.-r- >II I.T. Strategic Plan Status of Projects for FY 2004 I I Items O' I I I completed as Pr~j:~:d of this date D D I I September 13, ue a e 2004 denoted I wfth .I" ,Revised Due i Oate I I l~..101,. 31/2,004 . ~I 1013112004 , '. ..1 JaCQui submitted enhancement reQuest to Munis i I I~~:I' ! " J tj:j ";J ."j :c:J 1213112004 Comments ,/ Training with Paul. Judi. and Rosanne has been done +- i I I ! 7/2312004 i 7/2312004 I ! ~~~:! ,/ ,/ ,/ : 8/1312004 : 9/1512004 j ! 9116/2004 I I 9/1012004 T I 911012004 I 911012004 I I I I in prQQress I J.-~-..l--~-- ; i . I I I i ,/ I ,/ I I I ,/ I 101tl2004 I ,/ I tbd I ,/ I ; ,/ I ....J.__ I ,/ I ./ I I i I ! ./ I - i ~Not available at this time - Jacqui submitted enhancement request to Munis; received letter stating they can do this for $4.000. City Manager wants more information such as what % of I customers would actually use this. Working with Finance O~artmenl on this research 9/16/2004 9/2412004 813012004 I 9/3012004 I . -- 913012OO4 1 211 12004 8/3012004 911512004 ,/ i 811 f2OO4 I 8/1512004 8/112004 8/1/2004 9/3012004 9/3012004 21112005 1/112005 ./ ,/ ,/ ,/ ~4of7 I.T. Strategic Plan Status o( Projects (or FY 2004 1~m:::t'a~rl~;iJ:B" Items Ortglnal completed as Project of this date Number Project Projected September 13, Due Date ! 2004 denoted I ! with ./ Revised Duel ~ 'Researchnmplement new copier system ;or records (Lease exp-SePt 041 ' I Dale I Comments 1011512004 ~ Implementation of E-ARent.new FCIC/NCIC Software to replace Datamaxx. 913012004 Implementation of Docking stations with printing and scanning capabilities in MCP --1QL (Adam) 913012004 ~ B2P.!!l Pal'(Jacg~D _ _ ___.. _ _ __. _ ____ _._ f - r----- _'H --- 201.. Research with Munis to see If they can automate 1018/2004 - 201-b Wor1<inQ on manual process 10111/2004 201-0 Detennine if automated Is fea.~ib~e 12110/2004 201-d Implement manual process I 10/4/2004 ~ Jmp!ef!l_er:'l~ jil!fo..mated process I I U,d - ~ Replace Touahbook Keyboards {Adam} 1111/2004 ~ Replace Dispatch Printer(Adam) 912012004 ~ Implementation of Eagent(Adam) 11/112004 I-..ill.- PO Phooe FailoverlOlsaster P~n(Adam) 1111/2004 206 lnstallllmplement new APS Softwa_re (Adam) -- I I -t I 206-0 -Voice 11/1512004 : -- - 206-b -Swioes - - -- - 1113012004 ' 1 I 206-c -Crash & FTicket - - ----- 1211512004 I L- -~- I-----1QL 'Instail;Conflgure Mobile CAD Messaging for OlspatchrAdam) 121112004 - - -- ~ Reviewnmplement Web Based Locator for DB (Adam) 1111/2004 ~ Relocate PO Servers (Adam) 1211/2004 - -- t-11L ReIJ!ace Old Cabling (Adam) -- 210.. Patch Panels t~~-L :- - - ----- 21o-b Under Floor Boxes (dispatch) --- ~ Under r:loor Boxes (EOC) - _ __ 11112005 ~___ ~_ - ---.--- - ---- I 1/1/2005 , , ' --ID- Install Projectors in EOC From Chambers (Adami 121112004 _. ---- --ill.- Replace Switch at PW (AdamI 11/1512004 213 PSP2 Testlnp and Implementation (Adam) 4/1/2005 --- ~ ~iliU'lllm!tP~iliiil~~~C - -- I.I:lur..l::I._ ,~, ..l!:l'd1!!!'....'!;'D~~'t~;j]J -- Network Infrastructure & Support InItiatives. to improve netwOf1( perfonnance and to '--..!!1L avoJ~ J:l.aj~1Q.5_s ----- 102-a Network analysis. entire ne1w'ork lawut - hubs. switches. routers. etc. 913012003 I ./ I I l02-b Obtain Commission authorization to purchase eQuipment from state contract ~ 9130/2003 ./ -- 102-c Network analysis. Equipment and software purchase 913012003 i ./ I 102-d Network anaJysis . Installation a~ Implementation - 3 GB network switches 1113012003_ ./ i 102-e Remote Control!Suooort of Workstations i 913012003 ./ i 102-f UPS for each workstation 9130120031 ./ , - --- -----.-- I I I ~ Operatinq Systems UDQrade from Windows NT4 to Windows 2000 Server platform I ~~~:! ./ 1 102-h - VPN of I.S. Support - . --- , ./ I -- I I ~ Full impl~entation of wOrkqroup printinq I 9130/2003 ! ./ I ......JQL M~ni. 2oii3,o~ Release In:>plemerltation (JacQul) 1 l05-a Loaded into test area 4/1612004 ./ I l05-b WaitinQ for BuildinQ Dept (Sylvia) to test 51312004 ./ ----- 105-c Daiabase reioad - ----1 5/26/2004 ./ I I 105-d Dennis will test bill orintirlQ 5/28/2004 , ./ I 6/10/2004 I 105-c WaitinQ for Finance (JudO to review test results I 61212004 1 ./ I 6/10/2004 i --- ~ L9ad 1.010 Uve I 61312004 , ./ I 6/10/2004 ---1QL lIIunls . Online Viewing 01 UIIII\y Bills via internet - tJaCQ~1) I l08-a softw'are enhancement needed to make this work 212912004 I ./ I I 10~b Demo for Utility BilliOQ staff manaqement -- 4/1712004 ./ lity bill revision (move customer number and account number) / I ~ Put link on web siteIProiect completion ! 6/1/2004 ; ./ I - , I --1!..L IIIUnl. Positive Pav - prevenllon of ~!<.iraud (JaCQul) , ttt.a Prolect b~in , 4/5/2004 ./ I l11-b TrainirYl I 5/14/2004 i ./ I I ttt-c Set un with bank 5/21/2004 I ./ ~.7i2OGl YASTElllnPJqooQo~.",ID~'" P'IlglI5of7 I.T. Strategic PI~n Status of Projects for FY 2004 Project Number I 'terns I I Original I completed as I' P . ct d ollhls date I ~:~eDa~e September 13., : 2004 denoted ' I with'; ! Revised Duel : Date 1 Project 111-d 111-e 111-1 113 113-a 113-b 113-c 119 120 120-a 120-b -l2-l ~ ~ ;22 -1-22-a ~ ;;!2-(; ;6kf 124 125 127 127-a 127-b 129 Determine if Munis must create an enhancement for file format Testi ItransferrillQ file comolete Go live KIVA lnteriace (Joanne) _ Research and outline scope of work for MunislKiva interface Plan with implementorsfpr rammerslCi Staff JmDlem~Dt IlJis interfa.c-e __ Police. Increase bandwidth for Police CAFE Application with County N1u.ni~ tQ~~nd9'o'{~.mJgration 4JacQui & Team) Beoin implementation proiec) completion ij:l~lft'l_b.llf f8"I~i9R~ (s~e it~m 162) reme"iR!'1 eR elslle 3R~ te S.a" X 11" Dagef lSfeliRlUleRt bills FRysl be rev.+sed (Jdd l~ fee, etr;;) ~~~ r;;re3te geli!';\ daft'r:e"isiGRs ~eRE1 Is attomel,' ter reHi~" ~ Client UPS centralized monitOrina and configuration Centralized backup firmware updates/configuration E~9. M!Qrr!tio.n Install SOL database and conflQuration Install EPO Software, ~nfia!Jr:e. test uodate 2003 Domain Controller in prep for domain upgrade Coll~gur<>-NAS-wil/HJse-<*K\IS-6oftw~ments-an<l- aS6iEt "'ith u~er emall-afGhWe-4l.ooiel ....ub~~~. (E;I~grQf!f<<; Q09r ~<<;lJrtty Softw~[e) migration to server (Louie) miaration to server instalUconfiQure IP access unit Clty.W-jde ReconfiWRestructure of DomalnllP Scheme ~BIII & Tea-m) Ca_rtegra~~ ~~are Trainir}Q.and imqlementation of Carte!:lraph softNare for Public Works MlInf!i ~Q93_.Q1. R~I~~ ~rnpl~~en~IQn T estinQ with all departments/data Implementation of .01 release ,MlIlJ!~ _~9Q~,02R~~a~ Implementation TestirlQ with all departments/data Implementation of .02 release - -- .Onlin.e <::o",~iajl1\ Tracking (Better Placel j'1011/2004 I .. 12/3.1/2004 I. Comments 8/612004 I 'Test failed. WaJUllQ on new fix from Munis 6/1/2004 8/1/2004 x X cancelled cancelled J= I--:--~ Remove this from the plan, Too expensive and some additional unknown expenses on Munis side. 4IW2oo4 I ! l- 5.<mOO4 ~ :_ ~Spoke to Munis about this. They do not recommend that we move to Windows. They recommend ~ ~ _ ~ staying on the platform we are currently on until further notice. We are ok with that for security ~Q04. '__ jreasons. ~ 612=04 . 41612004 ./ 411912004 i 4119/2004 12/3112004 ;33 134 134-. 134-b 139 141 14t-. 142 142-a 142-b 143 143-a 143-b 144 - 4/2612004 512t/2004 1 7/11/2004 I 913012003 I 1211912003 I ;211212000 I 1211912003 I 311112004 3131/2004 3/31/2004 144-a 145 145-. 1% BetterPl~ Online complaint trackinp (this will be implemented with new web site) 913012003 MliJl!!i, Offi~ i!TH:i!~rn~f1Ic1~IOra - Imo.le.!!lent_and train on Murtis OffIce 1 913012003 I Ne:~ Web S~e pe~lgn Survey and research changes needed for new web site to be more robust and effective for' ovemment l 9/3012003 Create demo of new web site and present to the City Commission 9IJO/2003 146-a 146-b 146-< 147 147-. 148 Obtain Commission authorization to proceed - new web site should be UP and NMiOQ 913012003 New Posj,tlop - Medja sll<!~lall~ .. ... . . Hire new ~edja S~ialist (Web. Multimedia. and Application Soecialist) 913012003 1 Geogrnlihlc hllOl1T!illlon svStems Purchase of WorkStation GIS software for Community Development - Planning "Dlviskm - I 1 workstation 913012003 Woi1(Stallon U rades 146-a 149 "_17121:10I MASTE:""/l~s.w-_",,,,,,,,c..-..... ./ --+---+ ./ ./ I Can't be done ./ ---r- 6/18/2004 '---. . ;- 6111lio04 ./ ./ ,/ ,/ ./ ./ ./ I ~ exoensive - scrap this proiect r--I , will have consultant wol1< on this week of June 7-11 th ~_ another way to do this without restructurino ips ./ ./ ,- ./ ./ ./ ./ ./ PaQ. 6 on II cO~~~::d as I I Ortglnal I of this date i ~r~!e:,~: September 13, I 2004 denoted I I with ./ Revised Due i--- I I Date . Analysis of systems that need to be upgraded in order to move away from. Windows 98 .+. I L 149-a ola~orm 9/3012003 ./ ~ Purchase of Phase I Systems (p11 or below, runnirlQ Windows 98)- -- -- - 12131120031 --;--.) ~ Server Upgra:des .. Altem:pt t9 move toward flat Windows 2000 Environment 15().a City Hall PDC (move to Windows 2000 Server) -----l- ~3012003 I 15()"b Exchanoe (move to Exchanqe 2000 and Windows 2000 Server) _' 9/3012003 T lSo..c Track-It Server (move to Windows 2000 Server) 9/3012003 15O-d WebSenselSuoerScout (move to Windows 2000 Server) - I 913012003 ~ File and Print Server (move from City Hall PDC to. separate W~ndows 2000 Server) I 913012003 I ~ Arbor License Creation & Setup 4/812004 Correcting Connectivity Issues between Seminole County Sheriffs Office and Winter ~ Spnngs I ~/3!12.994 152-3 Investigate broken trust relationship 3131/2004 1 ~ Identify and fix DNS records I . 3/31/2004 152-c Add new SCSO servers/domain controllers into our DNS zones 3/31/2004 I ~ r~.buildJrusts between.'!Yinter.Spril1Rs and Seminole COl.lnty ~heriffs Office - _n - I 3131/2004 I ~ Monthly report to Mayor (new residents) 113112004 ~ Pavroll Emplovee Benefits Report 3/3112004 ~ New Computer for Fire Station 28 (receive. install. configure) 5/112004 ~ Training systems facelift. reconfigure for wireless 4/2612004 ~ 41010p Implementation - Po~ice Depa~fTlent 7/3112004 167-a loQistlcs (80% complete) __! r 167-b Hardware (70% comclete) ~- -. - I ~:~~ ~sr::~:~~~~:~~~te) - - ! ~ SUOOQrt ~ I l:a D~~~n:~~:::~e~~os~~~ted at SCSO ~ _ Imp~e~ent __ _ _ ___ _ ~ Rear East door - electronic door lock. need to replace latch ~ .Dl~~laim~rJcc;Jnfiqen~t!~!Jtv_~I~~ I;J-.ng~~@ to _b.e~ctcjed toqytgo~ng ~ma_lIs ~ thls is an issue related to routinq of outbound email. lrt1ontUlUon Tedtno.1og)' wM>N.wtntomprtn-gstLiGtg Project Number Project , I 9/3012004 i &712004 I 1/3112005 r ~ Tru~ Issy_~~~e~n C~ty 3f1d County - create secoru1ary trust ~o PO services 172-a (NAT to PO services as secondary - add dns entries ! ~ test to insure trust is not l:>r:9ken durinq city hall reb90ts - - -- ~ 173 Red Alert Software installation for Fire Denartment 713112004 ~110712OC\o1 1U.$1EIl.ITPnlfocto ____. "".c..n-n-.. LT. Strategic Plan Status or Projects for FY 2004 Comments ./ I --~- ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ I I I I ./ ./ ./ ./ ./ ./ ./ ./ I I I I t I latchllock still not workina properlv/technician called in aQain ./ ./ ./ 6/1812004 ./ I Exchanoe 2003 will resolve this issue ./ ./ ./ Pag8 7017