Loading...
HomeMy WebLinkAbout2004 04 26 Informational 300 COMMISSION AGENDA ITEM 300 CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR April 26, 2004 Meeting MGR. ~/DEPT ff Authorization REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Badcock Shopping Center The traffic study is being reviewed by the City's consultants and the site plan was reviewed at the October 7,2003, DRC. Revised final site plans were reviewed at the April 6, 2004, DRC meeting. per 4/26/04 agenda. Barclay Woods (Townhomes) - On the afternoon of April 16, 2004, the latest iteration of final subdivision/engineering plan for 88 townhouse units on 7.45 acres was submitted for review. The plans are scheduled for this City Commission meeting. The per 04/12/04 agenda Dlutz Transmission Shop - On March 17,2004, the conditional use application package was received by City staff. The application was reviewed by the DRC on March 30 and received a hearing at the Board of Adjustment on April 1. The conditional use application, including a concept plan, is scheduled for this City Commission meeting. per 4/26/04 agenda Dr. Courtney's Office - Vertical construction continues. Storm-water and sanitary sewer lines have been completed and inspected. per 4/12/04 agenda Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved on March 8, 2004. Another preconstruction meeting was held. Crews were to begin barricading the trees that are to be saved and subsequently beginning site work. per 4/12/04 agenda JDC Calhoun - Construction continues. Buildings 8, 9,10, 11, 12, 13, and 14 have received certificates of occupancy (CDs). Building No.1 is under construction. Building 2 architectural renderings and conceptual shell building plans were approved at the March 8, 2004, City Commission meeting. Both teams met at City Hall and discussed how the Town April 26, 2004 Infonnation Item 300 Page 2 Center Code (and other applicable codes) requirements will be addressed with Building No.2. The next step is for the architect to design the structural components ofthe building. Staff believes the development agreement needs to be amended to accommodate the doors at buildings 1 and 2 that do not meet the 50 foot maximum separation requirement (Subsection 20-327 (d) of the City [Town Center] Code) and the 10 foot minimum clear height requirement for awnings, marquees, colonnades, and arcades. A new supplemental Agreement was proposed by the applicant's new attorney at the February 9, 2004, City Commission meeting, in response to the City's proposed Ordinance No. 2004-10. The Agreement was not approved and Ordinance No. 2004 - 10 was approved on second reading, with a third (adoption) hearing scheduled for March 8, 2004. Approval of Ordinance No. 2004-10 was deferred at the March 8, 2004, City Commission meeting. City records indicate the following businesses are locating in the JDC Calhoun Town Center: Building 1 - Tijuana Flats (restaurant), an art studio, and a wine bar cafe; Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon; Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway; Building 10 - Washington Mutual; Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist; Building 12 - Publix; Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular; Building 14 - Papa Via's Take & Bake and China Feast; and Building 15 - Wendy's. per 4/26/04 agenda Medallion COllvenience Store - Final engineering/site plans were submitted for a convenience store at the SW corner of SR 434 and Hayes Road, on March 24, 2004. This site is adjacent to the intersection that was demonstrated to need an east-bound right-hand auxiliary turn lane. The plans were reviewed at the April 6, 2004, DRC. per 4/26/04 agenda Mirallda - Site clearing has commenced. per 4/26/04 agenda Moss Road Towllhomes - At its April 12,2004, meeting, the City Commission approved the Metropolis Homes conditional use application and concept plan to build as many as 84 condominiums and commercial development on an "L" shaped 9.1 0 acre site fronting on both SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. per 4/26/04 agenda Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8, 2004, City Commission meeting and a preconstruction meeting was held on March 30. per 4/12/04 agenda Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla Office Park) - BJM Associates has submitted a fully executed re-plat. It has been sent to the City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and subsequent certification. A copy of the plat and pertinent support documentation has been provided to the City Attorney. Tinklepaugh Surveying reviewed the plat and has provided comments to the City and BJM. per 3/08/04 agenda April 26, 2004 (nfoonation Item 300 Page 3 Parkstone - The FLU amendment was heard by the LP A at its September 3 and October 1, 2003, meetings and had a transmittal hearing at the October 27,2003, City Commission meeting. The Commission adopted Ordinance No. 2003-35 at the January 12,2004, City Commission meeting. A Pun amendment, final subdivision plan, and final plat have been provided to the City and were reviewed at the March 9, 2004, DRC. Staff awaits a resubmittal. per 4/12/04 agenda SR 434 Retail (a.k.a. Villagio) - Vertical construction continues. One segment of the sanitary sewer construction will not take place until building is to a point that the construction of the last section of sanitary will not conflict with vertical facet construction. The contractor is preparing to install this segment of the sewer line. The masonry wall issue was settled when the developer, the homeowners, and the City all agreed at the January 26,2004, City Commission meeting to split the cost of raising the wall from 6 to 8 feet tall. per 4/12/04 agenda Tuskawil/a Trails. - At its April 12, 2004, meeting, the City Commission accepted the infrastructure that was to be conveyed to the City. per 4/26/04 agenda Wagner's Curve (a.k.a. Heritage Park) - Revised building plans are being reviewed. Staff has been working with the applicant to correct the gazebo. per 3/08/04 agenda Winter Springs Elementary (New -located on SR 419) - Construction continues. State Representative David Mealor, City staff, and the FDOT have been investigating ways to provide safe access to and from the school site. per 4/26/04 agenda Board of Adjustment - A conditional use for a major automotive service and repair facility (transmission shop) along 17-92, north of Boat Lake and south of Shepard Road, is scheduled to be heard at this City Commission meeting. per 4/12/04 agenda FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: