Loading...
HomeMy WebLinkAbout2004 04 12 Informational 300 " COMMISSION AGENDA ITEM 300 CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR April 12, 2004 Meeting MGR. ~EPT / ~ Authorization / 'REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Badcock Shopping Center The traffic study is being reviewed by the City's consultants and the site plan was reviewed at the October 7, 2003, DRC. Revised final site plans were submitted on NovelJ1ber 24, 2003, and were reviewed at the December 9, 2003, DRC meeting. per 1/26/04 agenda. Barclay Woods (Town/lOmes) - On December 9, the final subdivision/engineering plan for 88 townhouse units on 7.45 acres was submitted for review. The plans are scheduled to be reviewed at the April 7, 2004, P&Z meeting. The per 04/12/04 agenda Dr. Courtney's Office - Vertical construction continues. Storm-water and sanitary sewer lines have been completed and inspected. per 4/12/04 agenda Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved on March 8, 2004. Another preconstruction meeting was held. Crews were to begin barricading the trees that are to be saved and subsequently beginning site work. per 4/12/04 agenda JDC Calhoull - Construction continues. Buildings 8, 9, 10, 11, 12, 13, and 14 have received certificates of occupancy (CDs). Building No.1 is under construction. Building 2 architectural renderings and shell building plans were approved at the March 8, 2004, City Commission meeting. Both teams met at City Hall and discussed how the Town Center Code (and other applicable codes) requirements will be addressed with Building No.2. The next step is for the architect to design the structural components of the building. April 12, 2004 I nformation Item 300 Page 2 Staff believes the development agreement needs to be amended to accommodate the doors at buildings 1 and 2 that do not meet the 50 foot maximum separation requirement (Subsection 20-327 (d) of the City [Town Center] Code). A new supplemental Agreement was proposed by the applicant's new attorney at the February 9,2004, City Commission meeting, in response to the City's proposed Ordinance No. 2004-10. The Agreement was not approved and Ordinance No. 2004 - 10 was approved on second reading, with a third (adoption) hearing scheduled for March 8, 2004. Approval of Ordinance No. 2004-10 was deferred at the March 8, 2004, City Commission meeting. City records indicate the following businesses are locating in the JDC Calhoun Town Center: Building 1 - Tijuana Flats (restaurant), an art studio, and a wine bar cafe; Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon; Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway; Building 10 - Washington Mutual; Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist; Building 12 - Publix; Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular; Building 14 - Papa Via's Take & Bake and China Feast; and Building 15 - Wendy's. per 4/12/04 agenda Medallion Convenience Store - Final engineering/site plans were submitted for a convenience store at the SW comer of SR 434 and Hayes Road, on March 24, 2004. The plans are to be reviewed at the April 6, 2004, DRC. per 4/12/04 agenda Miranda - A pre-construction meeting was held September 5. Revised site signage and a construction sign were approved by the City Commission at the October 27,2003, meeting. Staff reviewed the proposed building plans and has required additional details to ensure the pilasters on the front of the building extend out from the fayade to create a depth perception. per 1/26/04 agenda Moss Road TOJVn/zomes - On December 23, 2003, Metropolis Homes submitted a conditional use application and concept plan to build as many as 69 townhomes on an "L" shaped 9.10 acre site (7.58 units per acre) fronting on both SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. Access is proposed from Moss Road, with emergency access from SR 434. Alignment of the entrance roadway with Lori Anne Lane and wetland encroachment/buffering issues must be addressed with the subdivision plan review. The plan has been revised for the access to align with Lori Anne Lane. The conditional use received a recommendation for approval at the January 22,2004, BOA meeting and is scheduled for the February 23, 2003, City Commission meeting. On February 2, the applicant met with the City Manager and staff to try to apply Town Center-type guidelines to the development, as part of the City's efforts to upgrade the SR 434 Redevelopment District and surrounding properties. The applicant met again with staff on March 30, 2004. The conditional use is scheduled for this meeting. per 4/12/04 agenda Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8, 2004, City Commission meeting and a preconstruction meeting was held on March 30. per 4/12/04 agenda April 12, 2004 Information Item 300 Page 3 Oak Forest Unit 7 (Triallgular-shaped O.86-Acre Tract betweell Oak Forest & Tuskawilla Office Park) - BJM Associates has submitted a fully executed re-plat. It has been sent to the City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and subsequent certification. A copy of the plat and pertinent support documentation has been provided to the City Attorney. Tinklepaugh Surveying reviewed the plat and has provided comments to the City and BJM. per 3/08/04 agenda Parkstolle - The FLU amendment was heard by the LP A at its September 3 and October 1, 2003, meetings and had a transmittal hearing at the October 27,2003, City Commission meeting. The Commission adopted Ordinance No. 2003-35 at the January 12, 2004, City Commission meeting. A PUD amendment, final subdivision plan, and final plat have been provided to the City and were reviewed at the March 9, 2004, DRC. Staff awaits a resubmittal. per 4/12/04 agenda SR 434 Retail (a.k.a. Villagio) ~ Vertical construction continues. One segment of the sanitary sewer construction will not take place until building is to a point that the construction ofthe last section of sanitary will not conflict with vertical facet construction. The contractor is preparing to install this segment of the sewer line. The masonry wall issue was settled when the developer, the homeowners, and the City all agreed at the January 26,2004, City Commission meeting to split the cost of raising the wall from 6 to 8 feet tall. per 4/12/04 agenda Tuskawilla Trails. - The lift station start-up passed inspection, after minor repairs. Staff conducted a walk-thru and a punch list has been prepared. Final acceptance of infrastructure to be conveyed to the City may be scheduled for this meeting. per 4/12/04 agenda Wagller's Curve (a.k.a. Heritage Park) - Revised building plans are being reviewed. Staff has been working with the applicant to correct the gazebo. per 3/08/04 agenda Willter Sprillgs Elemelltary (New -located 011 SR 419) - Construction continues. The FDOT has recently indicated an unwillingness to allow a traffic light at the proposed location, after initially indicating otherwise. Staff estimated that the cost to the City to provide police officers at the school crossing would amount to $44,000 per year that has not been budgeted. At the January 12, 2004, City Commission meeting, the Commission voted to send a letter to the FDOT. A revised entrance without the traffic signal was approved at the March 8, 2004, City Commission meeting. per 3/22/04 agenda Board of Adjustment - A conditional use for a major automotive service and repair facility (transmission shop) along 17-92, north of Boat Lake and south of Shepard Road, will be heard at the April 1, 2004 BOA meeting. per 4/12/04 agenda FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: