Loading...
HomeMy WebLinkAbout2004 10 11 Informational 300 COMMISSION AGENDA ITEM 300 CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR October 11,2004 Meeting MGR. I~ Authorization IDEPT ) Jt" REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Badcock Shopping Center - The final site plan, development agreement, and a general depiction of signage were approved at the June 28,2004, City Commission meeting. Staff has reviewed the building plans and awaits revisions. No pre-construction meeting has been scheduled, at this time. per 8/09/04 agenda. Barclay Woods (Townhomes) - Approximately one half of the storm-water system has been constructed. The City Attorney is providing a modification to the development agreement that would expedite provision of model home units. per 10/11/04 agenda Barclay II - Staff has been working with Levitt and Sons (homebuilders) and Canin Associates (the same team working on the Highlander town home project) on a concept plan for as many as 207 town house units with rear-loaded 2 car garages and 128 on-street parking spaces on l7.15 acres along the south side of Orange Avenue - the Nguyen and recently annexed Ferlita properties. No formal submittal has yet occurred. per 10/11/04 agenda Belle Avenue Warehouse - Preliminary plans for a 4 building (3 new buildings totaling 9,000 SF and one existing 2,728 SF building) warehouse complex on l.174 acres were received on August 10, 2004, and received DRC review on August 24. At that meeting, the applicant decided to go straight to final engineering plans. per 9/13/04 agenda Bledsoe Estates Plat - A final subdivision plat for dividing an existing 5+ acre platted lot, located at the southeast corner of S. Moss Road and Bahama Road, into 2 lots, was received June 10,2004. The plat was reviewed at the June 15,2004 DRC. per 9/13/04 DRC October] I, 2004 Infonnalion Item 300 Page 2 Bruster's Ice Cream - Final engineering/site planlans for a 1,213 square foot ice cream drive- thru facility on 1.35 acres were submitted on May 5, 2004. A revision was submitted on August 27, 2004, and is scheduled for the September 7 DRC. The site is located at the southeast corner of Costa Rica Drive and SR 434 and abuts Hacienda Village. The applicant submitted a concept plan, complete with renderings at the September 20 City Commission meeting. per 10/11/04 agenda Dlutz (Apex)Transmission Shop - The conditional use application, including a concept plan, was approved by the City Commission at its April 26, 2004, meeting, a site plan was submitted on June 7 and reviewed at DRC on June 15. The final engineering/site plan is scheduled for the October 6 P&Z Board meeting. per lO/11/04 agenda Dr. Courtney's Office - The base of the building has been re-painted from the previous bright blue. The City has issued a certificate of completion (approval of the building shell) and Dr. Courtney's interior build-out is under way. Engineering staff awaits "as-builts" for the engineering final inspection. per 7/12/04 agenda Harbor Winds (a.k.a. Big Cypress) - The conditional use for town-homes on the 15 acres east ofthe Golf Terrace Apartments approved at the August 9,2004, City Commission meeting for a maximum of94 unit (6.27 d.u.lacre). On September 8,2004, the City Attorney's office filed a "Notice of Termination of Conceptual Binding Development Agreement" with the Seminole County Clerk of the Circuit Court, regarding the development agreement with Davis Heritage for this property (from last year). per 9/27/04 agenda. Highlander Property(Town Homes) - A concept plan was approved on August 23, 2004, for as many as 170 town home units on 11 acres of unincorporated county enclave, located between Tuskawilla Trails and SR 434. An annexation and Pre-development Agreement was approved at the September 20, 2004, City Commission meeting. per 10111/04 agenda. Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved on March 8, 2004. There have been delays, due to conflict with the existing storm-water system at Seville on the Green. The water system installation had also been held up, while waiting for FDEP clearance. per 10111/04 agenda JDC Calhoun - Construction continues. Buildings 8, 9, 10, 11, 12, 13, and 14 have received certificates of occupancy (COs). Building 1 has received a temporary Certificate of Completion and some Building No. 1 businesses are open (e.g. Tijuana Flats and the art studio). Building 2 is under construction. City records indicate the following businesses are locating in the JDC Calhoun Town Center: Building 1 - Tijuana Flats (restaurant), an art studio, a coffee shop, and a wine bar cafe; Building 8 - Leslie Pool Supply, a dentist, tutor, and a tanning salon; Building 9 - Red Bug Cleaners, E-Nails, Great Clips, Famous Uncle AI's Hotdogs, and Subway; Building 10 - Washington Mutual; Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist; Building 12 - Publix; Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular; Building 14 - Papa Via's Take & Bake and China Feast; and Building 15 - Wendy's. October 11. 2004 Information Item 300 Page 3 On September 15, 2004, the City received final engineering plans from Lochraine Engineering for the northeast portion of the JDC site (that area north of Tree Swallow Drive and east of Cliffrose Drive). Final engineering had not been completed for that portion of the approximately 15 acre site. per 7/26/04 agenda Maharaj Plat - Harold and Bendix Maharaj submitted a final plat to divide one approximately 5.4 acre platted lot at the northeast corner of Hayes Road and Panama Road on February 18, 2004. The proposed plat was approved at the September 20 City Commission meeting. per 10/11/04 agenda Medallion Convenience Store - Final engineering/site plans were submitted for a convenience store and car wash at the SW corner of SR 434 and Hayes Road, on March 24, 2004. This site is adjacent to the intersection that was demonstrated to need an east-bound right-hand auxiliary turn lane. The applicant's team has been advised of City Commission concerns about a car wash at that location. per 8/23/04 agenda Miranda - Site clearing is completed and no further activity has occurred on-site. per 7/12/04 agenda Moss Road Townhomes - At its April 12, 2004, meeting, the City Commission approved the Metropolis Homes conditional use application and concept plan to build as many as 84 condominiums and commercial development on an "L" shaped 9.10 acre site fronting on both SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. On September 20, the City Commission approved a 6 month extension for the conditional use. per l0/11/04 agenda Nursery Road (Phil Reece) - The final engineering/site plan was approved at the March 8, 2004, City Commission meeting and a preconstruction meeting was held on March 30. The City Commission approved the aesthetic review of the first new building at its July 12, 2004, meeting and a building permit has been issued. Crews are installing the infrastructure. Shop drawings for the pre-cast concrete structures as well as the site sanitary and water facilities have been approved. per 8/09/04 agenda Parkstone - A PUD master plan amendment, preliminary subdivision plan, and final subdivision plan were approved by the City Commission at its July 26, 2004, meeting. On September 1, a revised final engineering plan was submitted, proposing to re-locate the entrance more southerly along Parkstone Boulevard and lower the approved final grade. The proposal was addressed at the September 21,2004, DRC meeting. No re-submittal has been received. per 1 0/11/04 agenda Sprint - On August 27,2004, Sprint (applicant) and Spectra Site (tower owner) submitted plans to extend the existing 144.5' tall telecommunications tower on the Weaver site, between Barrington Estates and DeLeon Road. The applicant proposes to extend the height of the tower 20' and add Sprint antennae. The City Attorney has been advised and provided copies of the submittal. Per 9/13/04 agenda October II, 2004 Infom13tion Item 300 Page 4 SR 434 Retail (a.k.a. Villagio) - Vertical construction continues. At its July 12,2004, meeting the City Commission approved a modification to the development agreement and site design, to include a drive-thru bank at one of the out-buildings. Building plans for both out-buildings have been approved and the applicant has submitted plans for the fountain. per 9/13/04 agenda Tuscawilla Square - On June 2, 2004, a preliminary site plan was submitted for Tuscawilla Square, a restaurant and retail development, totaling 13,600 square feet, on 1.41 acres at Gary Hillary Drive (formerly Colt) Drive. The existing Tuscany Restaurant currently occupies a portion of the site. The applicant has been negotiating a development agreement with the City Manager and City Attorney. A re-submittal was reviewed at the July 20 DRC and the overall project was subsequently addressed with the City Manager, City Attorney, and planning staff. per 9/13/04 agenda Winter Springs Elementary (New -located on SR 419) -The traffic light is in place and functioning and school is open. per 8/23/04 agenda Winter Springs Townhomes - Preliminary plans for approximately 436 town-homes on 40 acres within the Town Center were received from Engle Homes on July 2 and were reviewed the July 20 DRC. The City Commission approved a concept plan at its August 9, 2004, meeting. The City Attorney noted that the concept plan, as proposed, would require a development agreement or special exception or both. per 8/23/04 agenda Board of Adjustment - A variance request from Section 9-3 of the City Code was received from Mr. and Ms. Backus to re-subdivide one of 2 lots previously created from a platted lot in the Ranchlands (creating a total of 4 lots - one existing lot divided into 3 lots and the other existing lot left alone). The variance was to be heard at the September BOA meeting, but was deferred until the October 7, 2004, meeting at the applicant's request. If approved, the applicant would still need to provide a final subdivision plat and request the City Commission waive the final engineering/subdivision requirements. The Montgomerys have applied for a "general permit" (pursuant to county regulations, administered by the City, for property in the City with county Future Land Use designation and zoning) to allow a woodworking business at their De Leon Road/Cress Run site, on property they purchased from Mr. Weaver. This was to be heard at the September 2 BOA meeting, but was deferred until the October 7 meeting at the county's request. The Lacey building setback variance request was deferred until the City Commission considers a new variance ordinance. per 9/27/04 agenda FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: