HomeMy WebLinkAbout2004 11 08 Informational 301 COMMISSION AGENDA ITEM 301 CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR November 8, 2004 Meeting MGR,1S ~DEPT ~f f Aut nzatlOn REQUEST: Fire Department is advising the City Commission of the status of various Federal Emergency Management Agency (FEMA) projects within the City. PURPOSE: This agenda item is to update the Commission on the status ofFEMA projects as a result of damages/deficiencies during Hurricane Charley, Frances, and Jeanne. CONSIDERATION: The hurricanes occurred on the following dates: Hurricane Charley - August 13, 2004. Hurricane Frances - September 3,2004. Hurricane Jeanne - September 25,2004. The city suffered damages to private and public structures, which does not include vegetative material for a total estimated loss of $20 million dollars. Debris management has been the major impact of expenses to the city and our estimated expenses for debris pickup, reduction, and moving the debris to the landfill will be $7.6 million dollars. To date the city has been invoiced for $6.2 million dollars and we have paid $5.2 million of the expenses. The City's total estimated expenses for labor, equipment, and materials are $400,000. FEMA will reimburse the city 100% for a 72-hour period of eligible expenses for each of the 3 storms and 90% of eligible expenses for the remainder of the period. The State of Florida has indicated that they will fund an equal match for the eligible expenses with the City of Winter Springs (at 5% each) for the remaining 10% of expenses. With this information in mind, the City has prepared a "Best Case Reimbursement Scenario" and a "Worst Case Scenario." The Best Case Scenario assumes that all of the City's expenses ($8,641,500) are reimbursable by FEMA at 90% ($7,650,890) and by the State at 5% ($391,830), with the City's portion being 5% ($391,830). The City would also be responsible for the interest on the short term loan at 100% ($100,000) and for the creek restoration program offered through the National Resources Conservation Service (NRCS) at 25% ($106,150), bringing the City's portion of the hurricane expenses to $597,980. November 8, 2004 Information Item 301 Page 2 The Worst Case Scenario assumes the following, which are based on comments made to the City during the numerous FEMA meetings: ARE NOT ELIGIBLE FOR REIMBURSEMENT . Gated/Private Community debris removal for a total expense of $300,000; and . 75% of bagged vegetative debris for a total expense of $70,000 ARE NOT eligible for reimbursement. ARE TYPICALLY NOT ELIGIBLE FOR REIMBURSEMENT . Uprooted stumps under 24 inches in diameter for a total expense of$229,000; . Stump grinding for a total expense of $47,000; . Debris field monitor reimbursable for a total expense of $70,000; and . Time and material debris work completed in the parks for a total expense of $53,000. Based on the above assumptions, the total expenses of $8,641,500, FEMA's portion would be $6,942,950, the State's portion would be $352,395, and the City's portion would be $1,346,155. In addition, FEMA has indicated that our contracted price for eligible stump removal may not be within FEMA's reasonable pricing range guidelines. However, we plan to appeal the denial of each expense to FEMA when we receive their official denial response. Sewer Incident during Hurricane Charley - The City's insurance carrier Florida Municipal Insurance Trust has been working with each of the 10 residents that were impacted by the sewage backup that occurred during the power outage which resulted from Hurricane Charley. Each resident is currently in a restoration phase. The City has met with the home owners and the insurance carrier periodically to insure good communications and a cooperative effort in restoring them to pre-event status. The deductible on this event will be $25,000. Sewer Incident during Hurricane Frances - The sewer incident that occurred to a resident on South Moss Road during Hurricane Frances has been completed and released by the insurance company and resident. The deductible on this event is $3,500. To date, the City has applied for FEMAlState reimbursements totaling $5,153,417. FUNDING: Federal, State and Local Funds RECOMMENDATION: NIA Informational ATTACHMENTS: (2) Storm Cost, Worst and Best Case COMMISSION ACTION: November 8, 2004 Infonnation Item 301 Page 3 ATTACHMENT 1 STORM COST WORST CASE DEBRIS REMOVAL TOTAL STATE FEDERAL CITY General $4,900,000 $245,000 $4,410,000 $245,000 Gated 300,000 300,000 Bags 94,000 1,200 21,600 71,200 FRS 21,000 1,050 18,900 1,050 Parks 260,000 10,890 196,110 53,000 Stump Removal 326,000 4,850 87,300 233,850 Stump Grinding Reg! Parks 14,000 14,000 Stump Location Reg/Parks 13,000 13,000 Stump Grinding Regular 20,000 20,000 Mulching 435,000 21,750 391,500 21,750 Landfill 900,000 45,000 810,000 45,000 Monitoring 350,000 14,000 252,000 84,000 7,633,000 343,740 6,187,410 1,101,850 Creek Restoration - FEMA 54,000 2,655 48,690 2,655 Creek Restoration - NRCS 425,000 318,850 106,150 479,000 2,655 367,540 108,805 City Force Work 400,000 6,000 388,000 6,000 Sewer Hurricane Charley 25,000 25,000 Hurricane Francis .3,500 3,500 City Property Damage Insurance Deductible 1,000 1,000 29,500 29,500 Loan Interest 100,000 100,000 Total $8641 500 $352 395 $6.942 950 $1 346 155 November 8, 2004 Information Item 301 Page 4 ATTACHMENT 2 STORM COST BEST CASE DEBRIS REMOVAL TOTAL STATE FEDERAL CITY General $4,900,000 $245,000 $4,410,000 $245,000 Gated 300,000 15,000 270,000 15,000 Bags 94,000 4,700 84,600 4,700 FRS 21,000 1,050 18,900 1,050 Parks 260,000 13,000 234,000 13,000 Stump Removal 326,000 16,300 293,000 16,300 Stump Grinding Reg! Parks 14,000 700 12,600 700 Stump Location ReglParks 13,000 650 11,700 650 Stump Grinding Regular 20,000 1,000 18,000 1,000 Mulching 435,000 21,750 391,000 21,750 Landfill 900,000 45,000 810,000 45,000 Monitoring 350,000 17,500 315,000 17,500 7,633,000 381,650 6,869,700 381,650 Creek Restoration - FEMA 54,000 2,655 48,690 2,655 Creek Restoration - NRCS 425,000 -0- 318,850 106,150 479,000 2,655 367,540 108,805 City Force Work 400,000 6,000 388,000 6,000 Sewer Hurricane Charley 25,000 1,250 22,500 1,250 Hurricane Francis 3,500 l75 3,150 175 City Property Damage Insurance Deductible 1,000 100 900 100 29,500 1,525 25,650 1,525 Loan Interest 100,000 -0- -0- 100,000 Total $8641 500 $391 830 $7 650 890 $597 980