Loading...
HomeMy WebLinkAbout2004 12 13 Consent 203 COMMISSION AGENDA ITEM 203 Consent X Informational Public Hearing Regular December 13. 2004 Regular Meeting /~ 0fJ Mgr. / Vnept. Authorization REQUEST: Information Services (I.S.) requests an additional appropriation in the amount of $5,000 in order to complete the Commission Chambers Audio Visual upgrade project. PURPOSE: To obtain an additional appropriation in the amount of $5,000 to complete the Commission Chambers Audio Visual upgrade project. CONSIDERATIONS: In FY 2004, the Commission asked that the document camera be replaced. However, since the projectors were due to be replaced in FY 2005 1.S. recommended that the projectors be replaced first. The document camera is a higher end camera and is probably not the major issue; but rather the projectors being older are more than likely causing the documents to appear blurry or unclear. I.S. estimated and budgeted $6,000 for this project ($5,000 for two projectors and $1,000 for installation). However, after taking a closer look at the wiring above the ceiling, a wiring problem was found and some additional work must be done in order to install the new projectors correctly. The problem has been temporarily fixed but needs to be repaired permanently. Some troubleshooting is also going to be required for the document camera. In addition, the I.S. Director would like for a S:\Information _ Services\Admin _ Docs\Agenda Items\FY 2005\December 2004\121304_ COMM _ Consent_ 203 _Commission_Chambers _ A V_Upgrade ]roject.doc CITY OF WINTER SPRINGS CITY COMMISSION REGULAR MEETING - DECEMBER 13.2004 CONSENT 203 PAGE20F2 comprehensive wiring diagram and analysis be done for the entire audio visual system in the Chambers. The reason for this is that the entire audio visual system has been pieced together throughout the years and was not installed all at one time. Therefore, updated, comprehensive audio visual system documentation is recommended at this time. The new projectors will require some additional wiring, different mounting equipment, and fasteners. Estimates were obtained from several vendors for this project. Prices are as follows: Projectors Installation Labor Engineering Contingency $6500 (includes wiring and mounting equipment) $1,040 (2 men/l day) $2,850 (wiring diagram and analysis) $610 (won't be used ifnot needed) FUNDING: An additional appropriation of$5,000 is requested from General Fund. RECOMMENDATIONS: That the Commission approve an additional appropriation of$5,000 to complete the revised scope of work for the replacement of the projectors in the Commission Chambers. ATTACHMENTS: COMMISSION ACTION: