Loading...
HomeMy WebLinkAbout2004 01 26 Informational 300 COMMISSION AGENDA Il~EM 300 CONSENT INFORMA TIONAL X PUBLIC HEARING REGULAR January 26, 2004 Meeting MGR.~IDEPT /~ Authorization REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Badcock Shopping Center The traffic study is being reviewed by the City's consultants and the site plan was reviewed at the October 7,2003, DRC. Revised final site plans were submitted on November 24,2003, and were reviewed at the December 9, 2003, DRC meeting. per 1/26/04 agenda. Barclay Woods (Towl.Ilwmes) - On December 9, the final subdivision plan was submitted and reviewed at the December 16 DRC. Review of the traffic analysis revealed a traffic concurrency issue on this portion of SR 434 (no widening proposed there in FDOT 5 year work plan). Traffic consultants for both the applicant and the City are investigating alternatives to meet concurrency requirements. per 1/26/04 agenda Dr. Courtney's Office - A pre-construction meeting was held December 8, 2003 and site work has commenced while the building plans are being reviewed. per 01/26/04 agenda Garcia Driveway Re-locate. - The crew completed the new driveway and is now removing sections of the existing driveway. per 1/12/04 agenda Highlands Apts., Phase II - The 42 unit apartment (3 floor) final site plan was approved on October 14, 2002. A pre-construction conference was held March 27, 2003. The applicant needed to provide either a storm-water permit or letter of exemption from the SJRWMD (the site was once part of the larger adjacent Seville on the Green) before commencing clearing. Building plans were reviewed by staff and the applicant must resubmit revised plans. On. August 8, 2003, the applicant submitted a revised final engineering/site plan with on-site January 26, 2004 lnfonnation Item 300 Page 2 storm-water management. A revised plan, submitted December 11,2003, was reviewed at the December 16,2003, DRC. per 1/12/04 agenda JDC Calhoun - Construction continues. Buildings 9, 10, 11, 13, and 14 have received certificates of occupancy (COs). Building No.1 is under construction. An incomplete plat to subdivide the Wendy's site from the 15 acre JDC tract was submitted May 7 and reviewed at the June 2, 2003, staffDRC meeting. The City's surveying consultant has certified the plat and the City Commission will review it at this meeting. A Second Amendment to the Development Agreement was approved at the June 23, 2003, commission meeting, allowing Building No. 1 to be a tall single floor structure with the appearance of a 2 floor structure, designed to accommodate a second floor if/when the market dictates. City records indicate the following businesses are locating in the JDC Calhoun Town Center: Building 1 - Tijuana Flats (restaurant), an art studio, and a wine bar cafe; Building 8 - Leslie Pool Supply, a dentist, and a tanning salon; Building 9 - Red Bug Cleaners, E-Nails, Great Clips, and Subway; Building 10 - Washington Mutual; Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, ShapeXpress, and a dentist; Building 12 - Publix; Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular; Building 14 - Papa Via's Take & Bake and China Feast; and Building 15 - Wendy's. per 1/26/04 agenda Miranda - A pre-construction meeting was held September 5. Revised site signage and a. construction sign wen: approved by the City Commission at the October 27,2003, meeting. per 1/26/03 agenda Moss Road Townhomes - On December 23, 2003, Metropolis Homes submitted a conditional use application and concept plan to build as many as 69 townhomes on an "L" shaped 9.10 acre site (7.58 units per acre) fronting on both SR 434 and Moss Road, adjacent to the Nations Bank and Victorio's Pizza. Access is proposed from Moss Road, with emergency access from SR 434. Alignment of the entrance roadway with Lori Anne Lane and wetland encroachment/buffering issues must be addressed with the subdivision plan review. The conditional use will be heard at the January 22,2004, BOA meeting. per 1/26/04 agenda Nursery Road (Phil Reece) - The final engineering/site plan was submitted October 30, 2003, and was discussed at the November 11, 2003, DRC. Revised plans and a traffic study were submitted on December 17 and reviewed at the January 6, 2004, DRC. per 1/12/04 agenda Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla Office Park) BJM Associates has submitted a fully executed re-plat. It has been sent to the City's surveying consultant for review for consistency with Chapter 177, Florida Statutes and subsequent certification. A copy of the plat and pertinent support documentation has been provided to the City Attorney. per 01/12/04 agenda January 26. 2004 Infoml3lionltem 300 Page 3 Parkstone - The FLU amendment was heard by the LP A at its September 3 and October 1, 2003, meetings and had a transmittal hearing at the October 27, 2003, City Commission meeting. The Commission adopted Ordinance No. 2003-35 at the January 12, 2004,City Commission meeting. The applicant has had 2 pre-application conferences with the DRC to discuss a subdivision plan submittal. per 1/26/04 agenda SR 434 Retail(a.k.a. Villagio) - Vertical construction continues. One segment of the sanitary sewer construction will not take place until building is to a point that the construction of the last section of sanitary will not conflict with vertical facet construction. The manager has been working with the developer and adjacent homeowners regarding the 6' tall masonry wall and buffer - the building permit for the wall is on hold in the interim. per 12/08/03 agenda Tuskawilla Trails. - The sub-base has been installed for the road and the crew has begun constructing the curbing. Mid-State has another crew that has focused on grading building pad and yard areas. The '~jack-and-bore" to connect to the existing water main in the Tuscawilla Road ROW has been scheduled for December 31.' per 1/12/04 agenda Wagner's Curve (a.k.a. Heritage Park) - Building permits for the townhomes have been issued. C. W. Meyer (the site contractor) has formed and poured sidewalks within the development and leading out to the crossing at SR 434. Some of the sidewalk is being re-done to provide adequate h.mdicap accessibility. Staff has required modifications to the gazebo, to bring it into compliance with the approved plans. per 1/26/04 agenda Winter Springs Elementary (New -located on SR 419):-'- Construction continues. The FDOT has recently indicated an unwillingness to allow a traffic light at the proposed location, after initially indicating otherwise. Staff estimated that the cost to the City to provide police officers at the school crossing would amount to $44,000 per year that has not been budgeted. At the January 12,2004, City Commission meeting, the Commission voted to send a letter to the FDOT. per 1/26/04 agenda Board of Adjustment - One variance request (building setbacks at Hacienda Village) and one conditional use request (town-homes in C-1 adjacent to the Nations Balik) have been received for a special BOA meeting. per 1/26/04 agenda FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: