HomeMy WebLinkAbout2006 12 11 Consent 405.1 Jesup's Reserve Phase I COMMISSION AGENDA ITEM 405.1 Consent X Information Public Hearine: Ree:ular December 11, 2006 Meeting REQUEST: The Public Works Department requests the City Commission validate the staff recommendation fmding Jesup's Reserve, Phase I to be built in substantial accordance with the Final Engineering plans, to accept the public roads, potable water, and sanitary sewer infrastructure for ownership and maintenance, and to authorize transportation impact fee credits to Levitt & Sons in the amount of $189,354.16 for the design and construction of the collector road (McLeods Way) per the Developer's Agreement. PURPOSE: The purpose of this Agenda Item is to request the City Commission validate the staff recommendation finding Jesup's Reserve, Phase I to be built in substantial accordance with the Final Engineering plans per Section 9-178, to accept the public roads, potable water, and sanitary sewer infrastructure for ownership and maintenance, and to authorize transportation impact fee credits to Levitt & Sons in the amount of $189,354.16 for design and construction of the collector road (McLeods Way) per the Developer's Agreement. PROJECT SUMMARY: J esup' s Reserve consists of 161 townhome units on 11.03 acres, located on the south side ofS.R. 434 and west of Tuskawilla Road in the Winter Springs Town Center. Phase I consists of 151 townhome units, and Phase II consists of 10 townhome units at the eastern end of the property. APPLICABLE CODE: Section 9-178. Required Improvements to be completed prior to building on lots; exceptions. ( c) Where the building official has an authoritative method of assurance that the improvements will be completed in accordance with approved plans, such as withholding occupancy, the building official may issue building permits upon advising the developer 121106_COMM_Consent_ 405_Jesups Reserve_Acceptance December 11, 2006 Consent Agenda Item 405.1 Page 2 that all or partial occupancy will be restricted until satisfactory completion of the improvements has be accomplished. (d) ... Certificates of occupancy will not be issued until all improvements are accepted by the city commission. FINDINGS: 1) The site has been constructed in substantial accordance with the final engineering plans approved by the City Commission at the August 8, 2005 City Commission meeting, except as noted below under the recommended conditions of approval. 2) All City agencies have found the work to be acceptable, except as noted in the recommended conditions of approval below. 3) FDOT has accepted the work performed within the FDOT right-of-way. 4) Record drawings have been submitted and accepted by Staff. 5) Levitt & Sons has provided a two-year, 10% maintenance bond to the City for the public roadways and water and sewer facilities that are being turned over to the City for ownership and maintenance. 6) Phase II consists of 10 townhome units at the east end of the property that cannot be constructed until additional right-of-way has been obtained from the adjacent property owner (Ondick). The additional right-of-way is required to construct Roberts Family Lane as shown on the approved final engineering plans. REIMBURSEMENT FOR COLLECTOR ROAD (McLEODS WAY): Under the Pre-Annexation Developer's Agreement for Jesup's Reserve approved by the City Commission at the September 20, 2004 meeting, the City is obligated to reimburse or issue transportation impact fee credits to Levitt & Sons for the design and construction cost for McLeods Way, a new collector road that runs through Jesup's Reserve. The total cost to design and construct McLeods Way is $189,354.16. RECOMMENDED CONDITIONS OF APPROVAL: The following items shall be completed and accepted by the City prior to issuance of any Certificates of Occupancy, except where specifically noted otherwise: I) Sidewalks and landscaping in the immediate vicinity of townhome units shall be completed and accepted by the City on a building by building basis prior to Certificates of Occupancy for those buildings. 2) Sidewalks and landscaping along the S.R. 434 frontage shall be completed upon removal of the overhead utilities, per the terms of the Developer's Agreement. 3) Complete the pond grading, landscaping, and irrigation. 121106_ COMM _ Consent_ 405 _Jesups Reserve_Acceptance December 11, 2006 Consent Agenda Item 405.1 Page 2 4) Install the one-way sign in the S.R. 434 median opposite of the Roberts Family Lane entrance. S) Install reflective markers at the barricades located at the southeast corner of the site. 6) Repair the curb at the McLeod' sWay entrance. 7) Complete and/or repair missing or damaged sections of the concrete valley gutters. 8) Install pavement markings on McLeod's Way at the northbound approach to S.R. 434. 9) All alleys are required to have inverted crown sections with positive slopes away from the units. Alleys that do not meet this criteria shall be repaired prior to issuance of any C.O.'s for the surrounding units. 10) After onsite building construction is substantially complete, the final asphalt surface shall be installed per the approved final engineering plans. 11) The performance bond on file with the City (bond #1003690 for $1,865,021.68 dated September 30, 2005) shall not be released until the satisfactory completion of the above- listed items. FUNDING: No funding is required for the issuance of the Phase I transportation impact fee credits. However, Roberts Family Lane has not been completed yet due to right of way acquisition issues and the costs associated with the completion are also the City's responsibility as per the Developer Agreement. The Roberts Family Lane costs will be addressed when the Phase II acceptance is brought before the Commission. RECOMMENDATION: Staff recommends that the City Commission validate the staff recommendation finding Jesup's Reserve to be built in substantial accordance with the Final Engineering plans, subject to the conditions listed above, accept the public roadways, potable water and sanitary sewer infrastructure for ownership and maintenance, and authorize the issuance of transportation impact fee credits to Levitt & Sons in the amount of $189,354.16 for design and construction ofthe collector road (McLeods Way). IMPLEMENTATION: Certificate of Occupancies for those units eligible can be issued after Commission approval and completion of the items listed in the conditions of approval. If Levitt has paid transportation impact fees in excess of those required after the impact fee credits are applied, the City will reimburse Levitt for those overpayments from the Transportation Impact fee Fund. ATTACHMENTS: None CITY COMMISSION ACTION: 121106_COMM_Consent_ 405_Jesups Reserve_Acceptance