Loading...
HomeMy WebLinkAbout2003 02 10 Informational A Current Planning Projects COMMISSION AGENDA ITEM A CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR 2/1 0/03 Meeting MGR, ;V'- /DEPT ~ Authorization REQUEST:. Community Development Department is advising the City Commission of the status of various current planning projects, PURPOSE: This agenda item is to update the Commission on the status of current planning projects, CONSIDERATION: Avery Park - Construction continues, The provision for "mother-in-law" apartments in the Town Center code has prompted the Department to prepare separate addresses, based on numbered alley-ways, to ensure appropriate emergency response to these facilities. per 1/13/03 agenda Belfaire (aka "Barrington Estates" & formerly "Battle Ridge'') - On January 29, 2002, a final plat, survey, application fee, andtitIe certification were received, This will be reviewed at the February 18, 2002, DRC, per 2/10/03 agenda Dr. Courtney's Office - In December 2002, Dr. Courtney submitted preliminary engineering/site plans for a dentist office on the wooded 0,72 acre site immediately west of City Hall, between City Hall and the equipment rental facility, A revised architectural rendering and geometry plan are included in this agenda, per 2/10/03 agenda Fox Run Preliminary Subdivision P/an- On March 26, staff received the application and plans for preliminary subdivision of a 5-10t residential subdivision on 1.28 acres at the west end of Panama Circle. This item was reviewed at the April 2, 2002, DRC. Staff awaits are-submittal per 4/22/02 agenda Garcia Driveway Re-/ocate, - Staff notified from Mr.Garcia that his variance request (I 2' paved roadway surface, no curb/gutter, and no sidewalks) had been approvded, Mr. Garcia was advised that the 3/13/2000.minutes required a 50 foot-wide easement, set back at least 20 feet from the adjacent Oak Forest residential lots. Per 1/13/03 agenda February 10, 2003 Information Item A Page 2 Highlands Apts" Phase II - The 42 unit apartment final site plan was approved on October 14,2002, per 10/28/02 agenda JDC Calhoun - Construction continues, Builqings 11, 13, and 14 have received certificates of occupancy (C.O,). Building No, 9 is nearly ready for a C,O, The Wendy's (Building No, 15) drive-thru access has been decided by the Commission, Detailed engineering plans have been provided to staff pursuant to the City Commission's October 28, 2002, directive. There is a dispute about access to the dumpster enclosure and therefore the item is brought back to the City Commission as part of the January 13, 2002, agenda, Window signs are included in this agenda. City records indicate the following businesses are locating in the JDC Calhoun Town Center: Building 9 - Red Bug Cleaners, E-Nails, Great Clips, California Yogurt, and Subway; Building 10 - Washington Mutual; Building 11 - State Farm, H & R Block, Rachel Nicole's Salon, and a dentist; Building 12 - Publix; Building 13 - Winter Springs Liquors, Mailboxes, Etc., and Choice Cellular; Building 14 - Papa Via's Take & Bake and China Feast; and Building 15 - Wendy's, per 02/1 0/03 agenda Miranda - The applicant submitted a site plan on October 17, 2002, a re-submittal on December 24, and another re-submittal on January 29. The staff DRC will review and provided comments at the February 18, 2003, staffDRC meeting, per 02/10/03 agenda Nursery Road (Phil Reece) - The City closed on the park properties on November 25, 2002. The deed has been sent to be recorded, per 01113/03 agenda Oak Forest Unit 7 (Triangular-shaped O,86-Acre Tract between Oak Forest & Tuskawilla Office Park) Trees that the homeowners removed without a permit have not been replaced, BJM Associates has submitted 2 draft plats and 1 boundary survey for preliminary review. Staff met with B1M and reviewed the progress on the plat. BJM is in the process of having the plat executed, which is complicated by the number of owners and mortgage holders, per 2/10/03 agenda Parkstone - Construction continues. Since the City Commission accepted those potable water and sewer improvements that were to be dedicated to the City, the applicant has requested that the performance bonds (guaranteeing their installation) for units 3 and 4 be returned. A letter was sent to the bonding company clarifying this and that the City is ready to return the bonds, per 8/26/02 agenda SR 434 Retail(a.k.a. Villagio) - Subsequent to the City Commission's comments on the revised geometry plan on December 16, 2002, the applicant and staff have been working on site plan modifications to save trees and buffer the Stone Gable residences and drafting a development agreement. This item is on this agenda, per 02/1 0/03 agenda February 10, 2003 Information Item A Page 3 SR 434 Roadway Improvements Project - No additional information, per 4/22/02 agenda Torcaso Park Improvements- On March 27, staff received the final engineering/site plan for the City's Torcaso Park improvements, This item was reviewed at the April 2, 2002, DRC meeting, The City Engineer is working on plans for the park. per 8/26/02 agenda Tuskawilla Office Park - Building plans for Building No, 4 were re-submitted and are being reviewed by staff, Site lighting, the adjacent dumpster enclosure, trees, and the wall must be adequately addressed prior to any C,O, being issued at the site. The internal sidewalk was addressed at the January 27,2003, City Commission meeting, per 2/10/03 agenda Tuskawilla Trails, - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64 acres) was approved at the June 10, 2002, City Commission meeting. The final engineering plans were reviewed at the November 5, 2002, DRC, Revised plans were submitted December 24, 2002, and again on January 21, 2003, Staff and the applicant are negotiating a proposed development agreement that, along with the final engineering plans, is anticipated to be brought to the February 24, 2003 City Commission meeting. per 2/10/03 agenda Wagner's Curve - Land clearing is under way, A final subdivision plat was submitted on August 22, 2002, proposing to split the commercial from the residential portions of the site, The plat was executed and recorded January 30,2003. Within about 2 weeks, Centex plans to submit the pl~t for the portion it plans to purchase for its 158 town homes, 2/10/03 agenda Winter Springs Elementary, - A memo has been sent to the City Attorney requesting verification of the applicability of the City's sign and dumpster pad enclosure regulations on school sites,. The City Attorney has verbally opined that signage is subject to the City's regulations, per 9/23/02 agenda Winter Springs Elementary (New - located on SR 419) - A preliminary site plan for a new elementary school, located generally northwest of the intersection ofSR 434 and SR 419, was submitted August 21 and reviewed at the September 3, 2002, DRC and again conceptually at the January 7, 2002, DRC, Staff received a re-submittal for review and comment at the February 4, 2003, DRC. per 2/10/03 agenda Board of Adjustment - Two applications have been received for the February 6, 2003, BOA meeting, One is a conditional use to allow a tattoo and body piercing shop in the C-2 zoning district along US 17-92 and the other is a setback variance request. per 2/10/03 agenda FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: