Loading...
HomeMy WebLinkAbout2005 11 14 Consent 210 COMMISSION AGENDA ITEM 210 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR November 14, 2005 Meeting MGR fv /DEPT /~ Authorization REQUEST: Utility Department Requesting Emergency Supplemental Appropriation For Repairs to the Sanitary Sewer System PURPOSE: The purpose of this Board item is to request authorization for the construction of emergency repairs to the sanitary sewer system on Sheoah Boulevard with Sunshine Building and Development at a cost of$17,539.14. CONSIDERA TIONS: This approval is needed to authorize repairs to a gravity sewer line on Sheoah Boulevard which collapsed in two locations within 100 feet of each other. This line serves those homes on MacGregor Road, Third Street, Moree Loop, and the south end of Sheoah Boulevard. The collapse was identified on November 2 and bypass pumping initiated. Sunshine Building and Development Corp. was contacted to provide a track backhoe, wellpoints for dewatering, and the labor necessary to perform the repair. They recently completed the Tuskawilla Road outfall and the crews were available. City personnel were responsible for bypass pumping, materials trucking, traffic control, and restoration. The sewer line repairs were begun on November 3rd and completed on November 8th. The cost for the sewer line repairs was $17,539.14. Full restoration of the road will be complete by November 23rd. No sewer backups occurred due to the results of this repair. FUNDING: The funding source for this expense is the fund balance reserves of the FY 2005/2006 Utility Enterprise Fund. $18,000 is needed to be transferred into the R&M Sewers line code (3600-54691). The funds will be expended over the next 30 days. November 14, 2005 Consent Agenda Item 210 Page 2 RECOMMENDATION: It is recommended that authorization be given for the construction of emergency repairs to the sanitary sewer system on Sheoah Boulevard with Sunshine Building and Development at a cost of$17,539.14 and a supplemental appropriation of$18,000 from fund balance be made to the Utility R&M Sewers line code. IMPLEMENTATION SCHEDULE: The sewer line has been repaired. The road restoration will be complete by November 23,2005. ATTACHMENTS: None COMMISSION ACTION: