Loading...
HomeMy WebLinkAbout2003 11 10 Consent 201 Northern Way Repairs Contractual Agreement COMMISSION AGENDA ITEM 201 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR November 10, 2003 Meeting MGR 1l/A1 /DEPT J~ Authorization REQUEST: Public Works Department Requesting Authorization to Enter into a Contractual Agreement for Northern Way Repairs. PURPOSE: The purpose of this Board item is to request authorization to enter into a contractual agreement with Orlando Paving Company, A Division of Hubbard Construction Company for Northern Way Repairs, at a cost of $52,883.30 plus a 10% contingency. CONSIDERATIONS: This project is needed to repair portions of North em Way (north loop) where ground water destroyed the roadway wearing surface. Underdrains were installed under separate contract to control the ground water. Orlando Paving Company, a Division of Hubbard Construction Company was low bidder on the City's resurfacing contract # ITB-O1 4-03-AH in Fiscal Year 2002/2003 and agreed to the City piggybacking on our previous contract with them. The scope of work includes milling and resurfacing, manhole adjustment rings, and blue hydrant reflectors. November lO, 2003 Consent Agenda Item 201 Page 2 FUNDING: This project was budgeted in the current fiscal year from the Transportation Improvement Fund - Capital Improvement Infrastructure line code (63lO0) at an estimated cost of$lOO,OOO.OO. The cost of the road repairs are $52,883.30 which is payable from the Transportation Improvement Fund - Capital Improvements Infrastructure line code (104- 63100). Funds would be expended over the next 60 days. RECOMMENDATION: It is recommended that authorization be given to enter into a contractual agreement with Orlando Paving Company, a Division of Hubbard Construction Company for the Northern Way Repairs at a cost of$52,883.30 plus a 10% contingency payable from the Capital Improvements line code (104-63100) ofthe Transportation Improvement Fund. IMPLEMENTATION SCHEDULE: The scope of work will be completed within 60 days of approval. ATTACHMENTS: 1. # ITB-O 14-03-AH COMMISSION ACTION: Attachment No. 1 BID NUMBER: ITB-014-03/AH ASPHALT RESURFACING OF VARIOUS CITY STREETS BID CLOSING: APRIL 30, 2003 Bid Closing Was Called By: Nancy Vobomik, Purchasing Coordinator Bid Opened: Bid Closed: 3:00 p.m. 3:07 p.m. Witnesses: Judith Cooper, City Controller, Finance Department Holly Pierstorff, Assistant to the City Clerk Four (4) Bids Received: 1. APAC-SOUTHEAST, INC. AGENT: ILLEGffiLE, VICE PRESIDENT ADDRESS: 3504 LAKE LYNDA DRIVE, SUITE 170, ORLANDO, FLORIDA 32817 TELEPHONE: (407) 208-1445 FACSIMILIE: (407) 208-1553 BID AMOUNT: $131,627.68 2. THE MIDDLESEX CORPORATION AGENT: ROBERT PEREIRA, VICE PRESIDENT ADDRESS: ONE SPECTACLE POND ROAD, LITTLETON, MASSACHUSETTS 01460 TELEPHONE: (978) 742-4400 FACSIMILIE: (978) 742-4455 BID AMOUNT: $139,197.70 3. ORLANDO PAVING COMPANY AGENT: R. WAYNE EVANS, SENIOR VICE PRESIDENT ADDRESS: 1936 LEE ROAD, WINTER PARK, FLORIDA 32789 TELEPHONE: (407) 740-5778 FACSIMILE: NOT PROVIDED BID AMOUNT: $126,615.25 4. RANGER CONSTRUCTION INDUSTRIES, INe. AGENT: MARK VEILLETTE, VICE PRESIDENT ADDRESS: 1200 ELBOC WAY, WINTER GARDEN, FLORIDA 34787 TELEPHONE: NOT PROVIDED F ACSIMLE: NOT PROVIDED BID AMOUNT: $143,788.60 Holly Pierstorff, Assistant to the City Clerk City of Winter Springs Copy: Mr. Kip Lockcuff, Director, Public Works/Utility Department Ms. Nancy Vobornik, Purchasing Department city Clerk\Docs\ W ord\BIDS\RESUL TS\Fy0203\ITB-O 14-03 AH.doc