Loading...
HomeMy WebLinkAbout2006 11 13 Consent 404 Starmer Ranaldi Expansion Senior Center and Therapy Pool COMMISSION AGENDA ITEM 404 Consent November 13, 2006 Regular Meeting Mgr. Dept. Authorization REQUEST: Parks and Recreation Department requesting authorization for an adjustment in design fees for Architectural Engineering Design Services with Starmer Ranaldi Planning and Architecture Inc., for enclosing the Expansion of the Senior Center and Therapy Pool at a cost of $ 70,000 (Increase of $ 16,000). PURPOSE: The purpose of this Commission Item is to receive approval for the adjustment in Architectural Engineering Services for the design of the Senior Center Expansion and Therapy Pool due to enclosure of the pool. CONSIDERATIONS: . This agenda item is needed to provide an adjustment to professional design services for the Winter Springs Senior Center Expansion and Therapy Pool. The project includes the disciplines of architecture, civil engineering, structural engineering, mechanical engineering, and electrical engineering. SRI was previously approved by the City Commission for General Architectural Services on November 13,2005. . The cost for the design services was $ 54,000 and did not include enclosing the pool. . SRI has been continually working on the project and now has plans that are 100% complete and ready to go through Development Review and Architectural Review Process prior to going out to bid. November 17, 2006 Consent Agenda Item # 404 Page -2- FUNDING: The funding source for this expenditure of $ 70,000 is budgeted in the 2006/07 budget as follows: CDBG Grant Park Impact Fund: Total $ 855,000 $ 350,000 $ 1,205,000 RECOMMENDATIONS: It is recommended that the City Commission authorize the adjustment in the Architectural/Engineering Design Services with Starmer Ranldi Planning and Architecture Inc. for the Senior Center Expansion and Therapy Pool at total cost of $ 70,000 payable from the Impact Fee Fund 155-65000, Project 70105. IMPLEMENTATION SCHEDULE: Bid Project Award Project Begins December 2206 January 2007 February 2007 The project is to be completed prior to December 31, 2007. ATTACHMENTS: 1. SRI Proposal for Design Services COMMISSION ACTION: ATTACHMENT #1 Planning and Architecture Inc Starmer Ranaldi 16 Oct 06 Chuck Pula, Director Park and Recreation Department City of Winter Springs 1000 East SR 434 Winter Springs, Florida 32708 Re: Senior Citizens Center Expansion and Pool Improvements Professional Design Fees Chuck We received a letter from the City's accounts payable department noting a difference in what we are billing vs. what the City Commission had approved for this project. In reviewing our files we never executed a fee amendment when the project scope and size went from $ 660,000 to $ 1,100,000 back in March of 2006. As you may recall per the attached design narrative (dated 6 Mar 06) which was approved by the City Commission we increased the scope of the project to change from a covered pool area to a fully enclosed and conditioned building. Please accept this letter as a written request to adjust our design fees from $ 54,000 (8% of the original $ 660,000 construction budget per the attached estimate dated 2 May 05) to $ 70,000 (7.5% of the revised $ 935,000 construction budget per the attached cost estimate dated 22 Feb 06). Re W President Approved Chuck Pula Date 890 Northern Way ph 407 977 1080 Suite E 1 Fx 4079771019 Winter Springs, Florida 32708 www.sriarch.com AA.{X)2984 March 6, 2006 Winter Springs Senior Center Assembly Hall Expansion and Therapy Pool The following narrative is intended to define the two (2) site plan and building design options being considered for the existing Senior Center. SITE PLAN" A" This plan illustrates the following: 1. An expansion of 3500 GSF to the existing assembly hall. The new addition will relocate the platform stage to be centrally located between the old and new assembly hall 2. A new game room for billiards and cards 3. A new restroom facility to accommodate the additional number of residents that will be able to use the facility. 4. A new covered outdoor therapy pool ( 300 GSF including the pool deck.) with ramp and stair pool access. A swivel transfer chair. A series of massage therapy jets and a bench seating area within the pool. An outdoor rinse shower for use before entering the water. The 3000 GSF shade structure is a contemporary steel column and steel cable and fabric tension structure. Please refer to the attached architectural plans and rendered elevations. The structure is designed to offer relief from the sun as well as allow for full natural ventilation of the pool and deck area. 5. The pool support facilities are to be a: a. Rinse showers at the pool deck. b. Handicap Pool Transfer lift and chair. c. ADA Ramp into pool d. Mainstream stairs into pool e. Massage jets area f. Below water surface handrail around perimeter of pool. 6. A (33) stall parking lot will take the place ofthe existing tennis courts. 7. The pool equipment will be located behind the rest room building on the north of the property by the basketball court. Estimated construction cost is $865,000.00. Please refer to the attached itemized cost estimate. SITE PLAN "B" This plan indicates the following: 1. The design for the Assembly areas is to be the same as in Scheme "A". 2. The parking expansion shall be the same as scheme "A" 3. The therapy pool area is being modeled after the success of the City of Altamonte Springs therapy pool complex. The new pool facility is 4500 GSF. It will be fully enclosed and air conditioned. The American Arthritis Association recommends the water temperature to be between 92 and 94 degrees F. This then further justifies enclosing the pool area. The water temps can be better regulated through out the year ifthe pool is enclosed. However, sliding glass doors are provided to be opened during mild temperatures and to allow for the natural ventilation and the desirable views to the lake side of the park. 4. The pool building enclosure will be an extension ofthe assembly hall building system. The building envelope wall/roof composition shall be masonry bearing walls and pre-engineered wood trusses with a standing seam metal roof system to match that of the existing building. 5. The entrance to the new pool complex shall be located on the west side adjacent to the new (33) car parking lot. 6. A new office will be located at the new exterior entrance side of the addition. 7. The pool support facilities are to be a: a. Check in and supervision office b. Male and Female dressing and shower facilities c. Therapy Pool training aids storage closet d. Rinse showers at the pool deck. e. Handicap Pool Transfer lift and chair. f. ADA Ramp into pool g. Mainstream stairs into pool h. Massage jets area 1. Below water surface handrail around perimeter of pool. The estimated construction costs for this scheme are $1,197,000.00. Please refer to the attached itemized cost estimate. Senior Center Addition & Therapy Pool Sunshine Park City of Winter Springs Opinion of Construction Value Preliminary Design 2-May-05 Division unit quantity cost subtotal div sub Division unit quantity cost subtotal div sub Finishes Senior Cntr Addition & Therapy Pool Scheme B Opinion of Construction Value 22-Feb-06 Sunshine Park City of Winter Sprinqs Prelimina y Design Division unit quantity cost subtotal div sub 2 Site Work pavinq sv 1800 30 $ 54,000.00 Division unit quantity cost subtotal div sub Finishes