Loading...
HomeMy WebLinkAbout2003 01 13 Informational E Tuscawilla Lighting and Beautification District Project . . . COMMISSION AGENDA ITEM E CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR January 13, 2003 Meeting MGR fA/' /DEPT j/!/ Authorization REQUEST: Public Works Department Updating the City Commission on the Status of the Tuscawilla Lighting and Beautification District Project PURPOSE: The purpose of this agenda item is to update the City Commission on the progress of the Tuscawilla Lighting and Beautification District. CONSIDERA TIONS: Attached is the monthly progress report from SRI relative to the December monthly progress reports for the Tuscawilla Lighting and Beautification District. Since the execution of the final change order and agreed upon pending work list, work under the control of the contractor has been completed. The missing signage and railings have been ordered and we believe we have resolved the issues with Florida Power to get the meters set. The south fountain pump was pulled again under warranty for a problem with the bearings which trips the breaker. The 10% retainage is still being withheld until all items are complete. This is expected to occur by the end of the month. ATTACHMENTS: 1. December Report COMMISSION ACTION: . . . Attachment NO.1 Status Report - January 2003 Tuscawilla Lighting and Beautification District Entry Way Enhancements The scope of work for this project consists of new entryway enhancements, new irrigation and re- landscaping of the center median islands along Winter Springs Boulevard. This is a phased project with a contract completion date established as July 6, 2002. Work in place to date is as follows: General 1. Final change order No.5 in the amount of$27,057.67 is approved. 2. Lighting is complete at all entryways. Punch list to be issued. 3. Weep holes have been installed at the bottom of the waterfall walls at the main entry. 4. Labeling of all electrical and irrigation panels have been completed. 5. Final inspections are secured and final clean - up has been performed. Action Items: 1. Final testing and adjustment of all lighting performed on 1/02/03, deficiencies noted, contractor to correct. 2. The rails and signage remain incomplete (not installed) at the Seneca Entry, shop drawings submitted and approved 1/03/03, and Contractor states work will be complete within two to three weeks. 3. Contractor to install rain sensors per the contract documents. 4. Sri working with Florida Power to resolve meter set issues at Trotwood and Citrus/Shetland.' 5. Paver repl~cement per change order No.5 at the South pond is scheduled for completion by January 21,2003. 6. Contractor has submitted partial closeout documentation. Final payment will be held until all decumepts are received. T Cathcart continues to correct or address warranty items and issues as they are brought to the Contractors attention. 8. Final completion and closeout of this project is anticipated to be complete by the end of January 2003. 9. Attached you will find a copy of change order NO.5 and Sri final project closeout agreement dated 12/02/02 for reference. John S. NeSmith Construction Administrator