Loading...
HomeMy WebLinkAbout2003 01 13 Consent C Sanitary Sewer Line Rehab COMMISSION AGENDA . ITEM C CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR January 13 2003 Meeting MGR rmEPT Iff Authorization REQUEST: The Utility Department is requesting authorization to hire Azurix North America to perform Sanitary Sewer Line Rehab by Piggybacking offBroward County BCOES Project No. 8548. PURPOSE: The purpose of this Board item is to request authorization to piggyback off of Broward County BCOES Project No. 8548 with Azurix of North America for relining of sewer lines at a cost of$78,665.00. CONSIDERA nONS: . This project is needed for the maintenance and rehabilitation of the sanitary sewer collection system. The Utility Department budgets annually for sewer line rehabilitation. The U-Lining process, a trenchless technology, is the preferred method of rehabbing the sewer lines by the City. The U-Liner process is a folded high-density polyethylene pipe that is pulled through the existing sewer line and expanded and cured in place. No excavating, digging or restoration is required. Azurix of North America is now known as American Water Services. The total amount of sanitary sewer mains that we intend to rehab at this time is; 505 ft of 10 inch pipe, 173 ft of 12 inch pipe and 1,091 ft of 8 inch pipe for a total 1,769 ft. The cost for relining per lineal foot is $42.00, $55.00 and $35.00, respectively. Reinstating the sewer laterals and bypass pumping adds $9,755 to the cost. The total cost will be $78,665.00. These pipes average 25 years old. The locations are Vistawilla Drive, Sybilwood Circle, South Edgemon Avenue and Elderwood Street. FUNDING: The Utility Department budgeted $100,000 in the Renewal and Replacement fund for . sewer and manhole relining. The project cost of$78,665.00 will be paid from this fund. Funds will be expended over the next 90 days. January 13, 2003 . Consent Agenda Item C Page 2 RECOMMENDATION: It is recommended that authorization be granted to piggyback off of Broward County BCDES Project No. 8548 with Azurix of North America (now known as American Water Services) for reconstruction of sewer lines at a cost of $78,665.00 payable from the Utility Renewal and Replacement line code (3610-56310). IMFLEMENTA nON SCHEDULE: The installation will be complete within 90 days of Commission approval. ATTACHMENTS: . 1. Bid Schedule of Prices COMMISSION ACTION: . I . PReVIous CONTRACT #N2087-00 QUOTATION REQUEST #L-3-02-083-B2 SCHEDULE OF PRICES ESTIMATED 2-YEAR QUANTITIES FOR SANITARY SEWER I. .REHABIUTATION THROUGH THE INSTALLATION OF FOlD-AND-FORMED LINERS I ESTIMATED UNIT TOTAL TASK DESCRIPTION USAGE UNIT PRICE PRICE I 1, ' INSTALL a-INCH DIAMETER 15,000 LF 36. f52 it U-L1NER-ALL DEPTHS $ $ S-~OaJ#- I 2. INSTAlL 1 D-INCH DIAMETER 700 LF 1;2... ~ ..2~ ~tO, ~ U-L1NER-ALL DEPTHS $ $, I 3. -INSTAlL 12-INCH DIAMETER 50 ' LF SJ-'l1 ;Z 7.5l), oJ , U-L1NER-ALL DEPTHS $ $ J I 4, INSTAlL 15-INCH DIAMETER 50 LF 6Y:~ ~e2a?I(6 U-L1NER-ALL DEPTHS $ $ I 5. REINSTATE SERVICE LATERALS 270 EA Igo,~ If 0 h ()J. OJ AFTER INSTALLATION OF U-L1NER $ $ 6. BYPASS PUMPING 8-INCH SEWER 20 EA $ 8oo~t8 $ /~ tJ2J,tB I 7, BYPASS PUMPING 10 TO 12-INCH 3 EA II ()f) r o.g, ~3(J11 ~ , SEWER $ $ Ie 2. O()O t!!- /0 o() BYPASS PUMPING 15-INCH SEWER 5' EA $ . I $ . IJCYJ " , r / I 9. POINT REPAIRS, 8" TO 10" PIPE AT 15 EA ~ 000, f!J. 6'0. O{();B DEPTHS UP TO 6 FEET $ $ , I 10. POINT REPAIRS, 8" TO 10" PIPE AT 20 EA cP. I()a an ~ DEPTHS 6 FEET TO 8 FEET $ 5;OtJO, .- $ , I 11. POINT REPAIRS, 8" TO 10" PIPE AT 5 EA 1~600J ~ . 00 DEPTHS 8 FEET TO 10 FEET $ $' 5'"/1 tA?<? ;' -- , J I 12. POINT REPAIRS, 8" TO 10" PIPE AT 3 EA /~c9YOI @ $ 1~ S-,,2(JIQ; DEPTHS 10 FEET TO 12 FEET $ I 13. POINT REPAIRS, 8" TO 10" PIPE $2iS-Oo,O~ ,z~ 90 ,P~ AT DEPTHS 12 TO 14 FEET 1 EA $ I 14. POINT REPAIRS, 8" TO 10" PIPE $.2~ om e ;z. ~ 0tlJ a~ AT DEPTHS 14 TO 16 FEET 1 EA $ - 15. POINT REPAIRS, 12" TO 15" PIPE 5;30d,O$ ~ gOtJ ,~E:, I AT DEPTHS UP TO 6 FEET 1 EA $ $ . I FFPL-PB03,JAN.2000 PAGE 20 OF 27 213/00 I