Loading...
HomeMy WebLinkAbout2005 10 10 Consent 206 COMMISSION AGENDA ITEM 206 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR October 10, 2005 Meeting MGR ~EPT H Authorization I REQUEST: The Public Works Department requesting City Commission approval to enter into a contract for professional engineering services for the design of Winter Springs Boulevard Improvements, Phase I, Segment 3 from Howell Creek to the Oviedo/Winter Springs City Limits. PURPOSE: The purpose ofthis agenda item is to request authorization for the Public Works Department to enter into a contractual agreement with Professional Engineering Consultants, Inc. (PEC) for professional engineering services for the design of Winter Springs Boulevard Improvements, Phase I, Segment 3, at a cost of $60,736. CONSIDERATIONS: · In August 2005, PEC completed a Preliminary Study and Pavement Evaluation Report for Winter Springs Boulevard from Tuskawilla Road east to the city limit, a distance of approximately three miles (Attachment 1). The preliminary findings from PEC's evaluation were presented to the City Commission at the April 11, 2005 City Commission meeting. · PEC's report and Staffs review of Winter Springs Boulevard indicates that the existing pavement conditions vary from typical wear to pavement failure. The recommended improvements consist of pavement milling and resurfacing within certain limits, generally from Forest Hill Drive to the city limit. Pavement reconstruction is recommended within certain limits, generally from east of Tuskawilla Road to Forest Hill Drive. In addition, curbs and sidewalks are recommended for replacement in certain areas, and areas in the roadway experiencing localized ponding will be addressed. · The total cost of the recommended improvements, including design and construction, is estimated to be $2.4 million. A total of $800,000 is budgeted in FY 2005/06. Consent Agenda Item 206 October 10,2005 Page 2 · The project has been divided into three segments: o Segment 1: From Tuskawilla Road to Northern Way (0.5 miles) o Segment 2: From Northern Way to the Bridge at Howell Creek (1.0 miles) o Segment 3: From the Bridge at Howell Creek to the Winter Springs / Oviedo City Limit (1.5 miles) · Segment 3 has an estimated cost of$795,000 and was selected for Phase I of the project. Segment 3 consists of pavement milling and resurfacing both the eastbound and westbound lanes from the Howell Creek Bridge to the city limit. In addition, the pavement will be reconstructed at four intersections along this corridor of Winter Springs Boulevard. FUNDING: The one-cent sales tax is the source of funding for Winter Springs Boulevard. A total of $800,000 is budgeted for FY 2005/06, which is estimated to cover the Phase I construction cost and the $60,736 engineering fee requested by this agenda item. RECOMMENDATION: It is recommended that authorization be given to the Public Works Department to enter into contractual agreement with Professional Engineering Consultants, Inc for the design of Winter Springs Roadway Improvements, Phase I, Segment 3 at a cost of$60,736. IMPLEMENTATION SCHEDULE: The design is expected to be complete by the end of November, with advertisement for bids in early December and bid opening in mid-January 2006. Construction would commence on approximately March I, 2006 and would take 90-120 days for completion. ATTACHMENTS: 1. Preliminary Engineering Study and Pavement Evaluation Report - August 2005 2. PEC proposal for professional engineering services - September 16, 2005 (Revised September 28, 2005) 3. Map of Winter Springs Boulevard COMMISSION ACTION: PEe PROFESSIONAL ENGINEERING CONSUL TANTS, INC, September 16, 2005 (Revised September 28, 2005) Mr, Kipton Lockcuff~ p, E Public Works DirectorlUtilities Engineer City of Winter Springs 1126 E" State Road 434 Winter Springs, Florida 32708 P-5341 R1 MK-03 Re: Winter Springs Boulevard Roadway Improvements Proposal for Professional Engineering Services Dear Mr Lockcuff: Professional Engineering Consultants, Inc, (pEe) is pleased to present this proposal for professional engineeting services for the Winter Springs Boulevard Roadway Improvements pr~ject. The project limits for this initial segment (Segment 3) of construction are from the bridge over Howell Creek to City Limits with an approximate length of 15 miles, The construction plans will be consistent with the recommendations of the Preliminary Engineering Study and Pavement Evaluation Report dated August 2005" The terms of this proposal are consistent with ow continuous Seminole County Minor Roadway and MSBU Design Contract (pS-5165-04/AJR) terms and conditions, including howly rates, SCOPE OF SERVICES The scope of services is broken into two major tasks, These tasks are (1) Design and Construction Plans Preparation, and (2) Bidding Phase Services, Task 1: Design and Construction Plans Preparation. This task includes the following: 1. Establish monumentation at approximately 1,000 foot intervals to be used as primary horizontal control for Winter' Springs Boulevard from Tuskawilla Road to City Limit 2, Reference said monumentation to a minimum ofthree (3) visible features, engineers planners sUNeyors "Engmeering Our Community" 200 East Robinson Street.. Suite 1560. Orlando, Florida 32801 · 407/422-8062" FAX 407/849-9401 Mr Kipton Lockcuff September 19,2005 (Revised September 28,2005) Page 2 P-5341Rl 3 . Establish the X. Y values of each monwnent relative to Seminole County horizontal control SPC'83/90 datum.. 4 Provide design topographic surveys fiom curb line to curb line at the intersection of Winter Springs Boulevard with Northern Way West, Wood Duck Drive West, Wood Duck DIive East, and Northern Way East (areas oftotalreconstruction) 5 Prepare construction plans in accordance with the latest design standards, design manuals and policies to include the following: · Key sheet; · Summary of pay items sheet; · Typical sections; · General notes; · Plan sheets (scale 1 ":40'); · Intersection detail sheets at ar'eas of total reconstruction; · Geotechnical information sheet; · Signing and pavement marking sheets and; · Traffic phasing sheets. Task 2: Bidding Phase Services. This task includes the following: 1, Produce bid docwnents (bid plans and bid specifications), 2., Distribute did docwnents (bid plans and bid specifications) to Contractors and Supplies. Contractor / Supplier' cost of plans to be retained by PEe, 3, Provide plan and specification clarification Prepare and distribute addenda (if needed).. 4. Conduct / attend pre-bid meeting.. Prepar'e agenda for, preside over and prepare and distribute minutes of pre bid conference. 5 , Attend Bid Opening and collect a copy of each bid submitted. 6. Review bids and prepare a detailed bid tabulation. 7 Pl'Ovide to Owner' a written Recommendation of Award , Mr.. Kipton Lockcuff September 19,2005 (Revised September 28,2005) Page 3 P-534LRl 8 After official award of the contract by the Owner, prepare Conformed Documents (ConstIUction Plans and Construction Specifications) and tr.ansmit to Contractor for use. SCHEDULE A sixty (60) to ninety (90)-day schedule is anticipated to complete the construction drawings. PROFESSIONAL FEES The attached sheet provides a breakdown ofthe rnanhours and fees Task I: Design and Construction Plans Preparation. ......... ... .... , . Task 2: Bidding Phase Services..,.. ,.,..,.,. .. "".,.. "," .$54,286,,00 .$6,449..60 We appreciate the opportunity to submit this proposal and look forward to working with you If you have any question, please contact me., Very truly yours, :::~~rCONS~IANTS'WC I lansportation D~ger I Associate Principal Attachment G:\clerical\HJGHW A Y\PECIOI HWY PROPOSAlSl200S PROPOSAlSIP-S341 RI Winter Springs Blvd doc Mr Kipton Lockcuff, P.E September 19, 2005 Page 4 P-5341 City of Winter Springs Winter Springs Boulevard Roadway Improvements PEe Manhour and Fee Estimate Task 1: Desian and Construction Plans Preparation 0tG:m~.'==~:~~QI~Ir.m\~~ RATES $11455 $85.55 $7395 $5365 L _. I Roadway Design 48 152 128 _ 24 352 $29,25520 I Signing and Pavement Marking Design 8 32 24 0 64 $5,428 80 -.. I , Phasing Plan .. 8 32 _ 24 I 0 64 $5,42880 Quality ControllConstructability Review 24 0 0 O. __ 24 _ $2,74929. $tiBTCttAt;:MAi\i.tiOUR$;cos:f:::::::::::::::;:: ::::::::::~::::::::: ::::::::~11t::::: ::::::::11~;:::::::: ::::::::::2:4:::::::::.'::::::::~::::::: :::<:::M2;86~:~O ~r.) Survey _ _. $10,824.00 Direct Reimbursements $600.00 tOfAi;:TASji(j::::::::::::::::::::::::::::::::::::::::::;::::::::;::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::7::::::::::::::::::::::::::$$4;28$;00 Task 2: Biddina Phase Services ... ............ "' :!::!Jj::i;::[..:::!~4.':~~a~G >~#.i~t> . . . . . . . . . . . . . :::::~r.~~V. ::::jj'ADb:::::: ....W-p..I-.. ::::::::::::::::::::::::::::::::::::::::::imNt:::;:::::::::::::::::::::::::::::::::::::: ............ :::::::. . :<-:~: .:::;:: .... ......, ..................-.....,............ )~~~~( ::~~i~~!f ;:::;::Tec!l;:;:::: :::~~~~ij< ............ ...............--............. RATES $1 14 55 $85 55 $73.95 $53 65 ~_._. ""- .- Bidding Phase Services ~ 8 24 $6,449 60 -- t:J'Ql'AI;;:TA.$K::~~:::::::::::::-:-:::.::::;:::::::::::::::::::::::::::::;:::::;:;:::;:::::.;:::7:::::::::?::::;~:.:;::;::::::.:::::::::::::::::~:::::::::.::::;:::::::::: :::7:::;::::::::7:::.:.:7:.:$~;~~~ P-5341 Winter Springs Blvd ~~ :::s. C) riJ ~ Vi '. Qa ~c t--<~ -. ~ S! t:l... ~. ~ ~~ ~ s.. ~ ~ ~ ..... ~ "": ~ "": s. aa O:l c l:: ~ $l ~ "ti ~ .: ~ S! ~ ~ ~ ~ ~ ~ :--. ~ ~ S! ~ ~ ..... ~ ~ c S! s.. ~ O:l "": ~ ~ ~ ..... ~ ~ - - 1;,;' (j ~ ~ ;>;- ..... c s.. ~ ~ ~. ~ ~ ~ ..... ~ "":