Loading...
HomeMy WebLinkAbout2006 10 09 Consent 401 Improvements for Traffic Signal at SR 434 and SR 419 COMMISSION AGENDA ITEM 401 Consent October 9. 2006 Regular Meeting Mgr. / Dept. Authorization REQUEST: Public Works Department is Requesting Authorization to Retain the Services of Professional Engineering Consultants (PEC) for the Design of Improvements to the Traffic Signal at the Intersection of State Road 434 and State Road 419. PURPOSE: To enter into a contract with PEC through the Seminole County Minor Roadway and MBSU Design contract to design and prepare construction plans and obtain permits for improvements to the traffic signal at the intersection of SR 434 and SR 419 for replacement of the existing strand pole with mast arm signal in the amount of$21,416.10. CONSIDERATIONS: Improvements to the traffic signal have previously been identified by Seminole County and the City as in need of substantial repair due to the age of the signal. Florida Department of Transportation currently has a contract underway to resurface SR 419 from SR 434 to US 17-92 which includes some minor improvements along this roadway. This intersection with the exception of Consolidated Way is the only intersection from Vistawilla to Sheoah that is not a decorative mast arm mounted traffic signal. CITY OF WINTER SPRINGS CITY COMNlISSION REGULAR l\IIEETING - OCTOBER 9. 2006 CONSENT AGENDA ITEM 401 PAGE20F2 The Public Works Department anticipates design to be completed this year with construction budgeted for Fiscal Year 2007-08. PEC's attached proposal includes three tasks. The Public Works Department is requesting that only Task 1 and Task 2 for amount of $21,416.10 be approved at this time. FUNDING: The funding for the design ofthis project has been budgeted this fiscal year (FY 2006-07) under the Road Improvements Fund (115-65000- 30013). RECOMMENDA TIONS: The Public Works Department recommends that Professional Engineering Services, Inc be retained for the design of a mast arm traffic signal for the intersection of SR 434 and SR419 in the amount of$21,416.10. ATTACHMENTS: Professional Engineering Services Proposal COMMISSION ACTION: PROFESSIONAL ENGINEERING CONSUL TANTS, INC. August 30, 2006 Mr. Kipton Lockcuff; P.E Public Works I Utility DirectOT City of Winter Springs 1126 East State Road 434 Winter Springs, FL 32708 RE: State Road 434 and State Road 419 Intersection Signalization Project Proposal for Professional Engineering Services Dear Mr. Lockcuff: Professional Engineering Consultants, Inc. (PEC) is pleased to present this proposal for professional engineering design, and post design services for the SR434 I SR419 intersection signalization project. This project consists of constructing a mast aIm signal at this intersection The terms ofthis proposal are consistent with our continuous Seminole County Minot Roadway and MSBU Design contract (PS-5l65-04 AJR) terms and conditions, including manhours and homly rates SCOPE OF SERVICES The scope of this project is broken into three major tasks.. These tasks are (1) Signalization design, construction plans preparation and permitting, (2) Vacuum Excavations, and (3) Post design services Task 1: Signalization Design. Construction Plans Preparation and Permittine:. This task includes the following: 1.Prepare complete signalization plans in accordance with the latest design standards, design manuals and policies adopted by FDOT and Seminole County as applicable. 2. Provide isolated intersection timings 3. Provide standard mast arm pole and foundation design for the proposed poles in accordance with Seminole County Mast AIm Standards. 4. PerfOIm utility coordination. 5. Submit the construction plans to FDOI and Seminole County for review and approval. Task 2: Vacuum Excavation Services. Conduct vacuum excavation services at the proposed mast aIm foundation locations. Engineering Our Commumty . 200 East Robinson Street Suite 1560. Orlando. Florida 3280-1 Mr. Kip Lockcuff, P.E. August 30,2006 Page 2 Task 3: Post Design Services. 1. Provide the plans and quantities to the contractor and obtain a price quote based on the Seminole County Push-Button contract 2. Review the quote based on established unit prices and make the required adjustments. 3. Review mast arm poles shop drawings and calculations" 4. Review submittal data for the signalization hardware.. 5. Respond to "request for information" during construction. 6 Assist in resolving any construction related issues 7. Attend on-site meetings to discuss construction progress, SCHEDULE A ninety (90) day project schedule is anticipated to complete the construction drawings. Ihis time is exclusive of any review time by FDOI and Seminole County" Close coordination will be required in order to minimize the review time by the various agencies, PROFESSIONAL FEES Task 1: Signalization Design, Construction Plans Preparation and Permitting Task 2: Vacuum Excavation Services (OPTIONAL) Task.3: Post Design Services (OPTIONAL) $19,584.10 $1,832.00 $7,886.03 The attached sheet provides a breakdown of the manhours and fees. We appreciate the opportunity to submit this proposal and look forward to working with you, If you have any questions, please contact me Very truly yours, Professional Engineering Consultants, Inc. Attachment cc: MK-O.3 file G:\clerical\HIGHWAYlPECIOI HWY PROPOSALS\2006 PROPOSALS\P-6276 doc City of Winter Springs SR 434/SR419 Intersection Signalization PEC Manhour and Fee Estimate Task 1: Signalization Design, Construction Plans and Preparation and Permitting. Task 2: Vacuum Excavation Services Task 3: Post Design Services