HomeMy WebLinkAbout2002 06 24 Informational A Current Planning Projects COMMISSION AGENDA ITEM A CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR 06/24/02 Meeting MGR. Authorization REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Avery Park - Construction continues. The Contractor has obtained a permit to install the water fountain the storm-water pond. A letter of credit in the amount of $26,71.0..0.0 was issued April 2 and received by the Community Development Department on April 8, 2.0.02, in lieu of a maintenance bond for the potable water and sanitary sewer improvements to be accepted by the City. The original was provided to the City Clerk and a copy to the City Attorney. Acceptance of the utility and maintenance bond is a consent item on this agenda. Belfaire(formerly Battle Ridge) - All files and correspondence were requested (City Clerk memo dated 5/.06/.02) for review relating to the final engineering/subdivision plan and modification to the annexation and pre-development agreement. A pre-construction meeting was held May 23, 2.0.02. An archaeological survey has been provided to the City. Staff still awaits a fully executed addendum to the annexation and pre-development agreement. Construction may not commence until staff receives this document. Fox Run Preliminary Subdivision Plan- On March 26, staff received the application and plans for preliminary subdivision of a 5-lot residential subdivision on 1.28 acres at the west end of Panama Circle. This item was reviewed at the April 2, 2.0.02, DRC. Garcia Driveway Re-locate. - Staff received an application from Manny Garcia to relocate a private drive/roadway from Tuscawilla Unit 5 onto an adjacent portion of Oak Forest Tract "A" that Mr. Garcia owns. The item is scheduled for the June 18, 2.0.02, DRC. June 24, 2002 Information Item A Page 2 Highlands Apts., Phase II - The 42 unit apartment preliminary site plan was approved on April 22, 2002. The final engineering/site plan submittal was received May 15 and was reviewed at the May 21,2002, DRC. JDC Calhoun - Construction continues. The applicant has re-submitted building plans for buildings 9, 11, 13, and 14. These are under staff review and require modifications. Staffwill take the Washington Mutual (Building No. 10) spandrel glass and metal canopy issues to the staff DRC on June 18, 2002, as precedent for the City Commission's review for a special exception, pursuant the discussion at the June 10, 2002, City Commission meeting. Miranda - The applicant is awaiting a revised development agreement from the City Attorney. Nursery Road (Phil Reece) - The FLU amendment, rezoning, and development agreement are scheduled for this meeting. Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla Office Park) - Staff believes that a subdivision re-plat is mandated by sections 9-3 and 9-4 of the City Code. Parkstone - Construction continues. On May 14, 2002, the City Manager authorized 10 additional building permits at Parkstone Unit 4. Acceptance of a utility and maintenance bond is scheduled on this agenda. SR 434 Retail(a.k.a. Villagio) - The FDOT will be conducting a meeting to discuss access alternatives. The applicant has been negotiating with the Stone Gable homeowners. SR 434 Roadway Improvements Project - No additional information. Torcaso Park Improvements- On March 27, staff received the final engineering/site plan for the City's Torcaso Park improvements. This item was reviewed at the April 2, 2002, DRC meeting. Tuskawilla Office Park - Construction is proceeding. The final plat was received on May 15, 2002, reviewed by the staff DRC on May 21, 2002, and is scheduled on this agenda. A proposed entry wall/signage feature and a temporary construction easement are also scheduled on this agenda. Tuskawilla Trails. - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64 acres) was approved at the June 10,2002, City Commission meeting. Staff awaits submittal of the final engineering plans. Wagner's Curve - The final subdivision plan was submitted May 24, 2002, and reviewed at the June 4, 2002, DRC meeting. Staff awaits a re-submittal of the final subdivision plans. Winter Springs Elementary. - A site plan for a 15,000 SF learning center, to replace existing portables, was received May 3, 2002, and reviewed at the May 21,2002, DRC. Are-submittal will be reviewed at the June 18, 2002, DRC. June 24, ~002 Information Item A Page 3 Board of Adjustment - The Board of Adjustment (BOA) needs to meet in July (other than on the first Thursday - July 4), to consider 2 setback requests. Staff is awaiting a re-submittal from the applicant at 1521 W oodsglen Drive. The matter was heard at the December 6,2001, BOA meeting, for a variance for an addition to encroach 8 feet into the 20 foot rear yard setback set forth for Fox Glen at Chelsea Park. The BOA requested that the applicant bring in other alternative designs with less encroachment. FUNDING: None required RECOMMENDATION: None required A TT ACHMENTS: None COMMISSION ACTION: