HomeMy WebLinkAbout2006 09 11 Consent 408 West Wastewater Treatment Facility COMMISSION AGENDA ITEM 408 CONSENT September 11, 2006 Meeting MGR DEPT Authorization REQUEST: Utility Department Requesting Approval for the construction of a Support Structure for the new sludge thickening equipment at the West Wastewater Treatment Facility with Unlimited Welding Inc. at a cost $24,527. PURPOSE: The purpose of this Board item is to request approval to have Unlimited Welding Inc. 235 Sanford Oviedo Road Winter Springs the construct a steel platform with stairs at the West Wastewater Treatment Facility for the sludge thickening project. CONSIDERATIONS: This platform is needed to place the new sludge thickener on top wastewater treatment plant. The purchase ofthe rotary sludge thickener was approved on June 12, 2006 at a cost of$85,500. The thickener will allow us to increase the solids content of sludge being hauled from 1% to 4% which will reduce the volume of truck loads needed for removal. Unlimited Welding Inc. is a local company located on Old Sanford Oviedo Road that has done quality work for the City in the past. Of all the welding fabrication companies contacted, they are the only company that responded. The cost for Unlimited Welding to build the platform and stairs is $24,527.00. A sketch of the structure is provided on page 2. FUNDING: Funds are budgeted in the Utility Department line code 3620- 62100. September 11, 2006 Consent Agenda Item 408 Page 2 Recommendation: It is reommended that authorization be gratned to for Utility Department to contract with Unlimited Welding to construct and erect a platform for the sludge thickening equipment at a cost of $24,527 plus 10% contingency.