Loading...
HomeMy WebLinkAbout2002 07 22 Informational A Current Planning Projects COMMISSION AGENDA ITEM A CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR 07/22/02 Meeting MGR. ~P'fj. Authorization REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: A very Park - Construction continues. The potable water and sanitary sewer improvements to be accepted by the City were accepted by the City at the June 24, 2002, City Commission meeting. Staff may now issue certificates of occupancy for the buildings and their associated lots, as pertinent. Belfaire(formerly Battle Ridge) - All files and correspondence were requested (City Clerk memo dated 5106/02) for review relating to the final engineering/subdivision plan and modification to the annexation and pre-development agreement. A pre-construction meeting was held May 23, 2002. An archaeological survey has been provided to the City. Staff still awaits a fully executed addendum to the annexation and pre-development agreement, but was advised by the City Attorney that it had been executed and that the clearing could be authorized. Construction has commenced. Fox Run Preliminary Subdivision Plan- On March 26, staff received the application and plans for preliminary subdivision of a 5-lot residential subdivision on 1.28 acres at the west end of Panama Circle. This item was reviewed at the April 2, 2002, DRC. Staff awaits a re- submittal. Garcia Driveway Re-locate. - Staff received an application from Manny Garcia to relocate a private drivelroadway from Tuscawilla Unit 5 onto an adjacent portion of Oak Forest Tract "A" that Mr. Garcia owns. The item was initially scheduled for the June 18, 2002, DRC, but was re-scheduled for the July 2, 2002, DRC. Staff awaits the applicant's responses from DRC comments. July 22, 2002 Information Item A Page 2 Highlands Apts., Phase II - The 42 unit apartment preliminary site plan was approved on April 22, 2002. The final engineering/site plan re-submittal was reviewed at the July2, 2002, DRC. Revised plans were submitted July 9,2002, and are being reviewed. JDC Calhoun - Construction continues. The applicant has re-submitted building plans for buildings 9, 11, 13, and 14. Staff received a request from Wendy's (Building No. 15) for revised drive-thru access and has been coordinating the proposed design requests with Dover Kohl. Any modification of the approved site plan must be approved by the City Commission. Miranda - Staff awaits a site plan submittal. Nursery Road (Phil Reece) - Staff awaits a building plan submittal for the walls and engineering plans for the storm-water pond. Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla Office Park) - Staff believes that a subdivision re-plat is mandated by sections 9-3 and 9-4 of the City Code. Trees that the homeowners removed have not been replaced. Parkstone - Construction continues. Since the City Commission, on June 24, 2002, accepted those potable water and sewer improvements that were to be dedicated to the City, certificates of occupancy may now be issued for buildings and their associated lots, as pertinent. SR 434 Retail(a.k.a. Villagio) - The FDOT conducted a meeting to discuss access alternatives. The applicant states he will submit another site plan design, minus the cross- access between the site and the entrance road to Stone Gable. SR 434 Roadway Improvements Project - No additional information. Torcaso Park Improvements- On March 27, staff received the final engineering/site plan for the City's Torcaso Park improvements. This item was reviewed at the April 2, 2002, DRC meeting. Tuskawilla Office Park - Construction is proceeding. The final plat received approval on July 8,2002, subject to staff and the City Attorney's review and approval. A proposed entry feature with signage has been forwarded to Dover Kohl for review. Tuskawilla Trails. - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64 acres) was approved at the June 10,2002, City Commission meeting. Staff awaits submittal of the final engineering plans. Wagner's Curve - The final subdivision plan was submitted May 24, 2002, and reviewed at the June 4, 2002, DRC meeting. Staff awaits are-submittal of the final subdivision plans. Winter Springs Elementary. - A site plan for a 15,000 SF learning center, to replace existing portables, was received May 3, 2002, and reviewed at the May 21, 2002, DRC. Are-submittal was reviewed at the June 18,2002, DRC. July 22, 2002 Information Item A Page 3 Board of Adjustment - The Board of Adjustment (BOA) will meet on July 18 (rather than on the first Thursday - July 4), to consider 2 setback requests. FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: