HomeMy WebLinkAbout2002 04 22 Informational C Status of Town Center Roads Project ~, COMMISSION AGENDA ITEM c I CONSENT INFORMA TIONAL X ~ PUBLIC HEARING REGULAR i April 22, 2002 Meeting MGR (lr../ IDEPT /;r-- Authorization REQUEST: Public Works Department Updating the City Commission on the Status of the Town Center Roads project. PURPOSE: The purpose of this agenda item is to update the City Commission on the progress of the Town Center Roads project for March 2002. CONSIDERA TIONS: Attach~d is the March 2002 monthly progress report for the Town Center Roads project. The project was awarded to Esterson Construction at a cost of$1,883,215 and includes the reconstruction and construction of Tuskawilla Road and Hickory Park Grove Boulevard and their associated drainage, utilities, and brick pavers on Tuskawilla Road. The Notice to Proceed was issued on February 5, 2002 with a completion date of November 2, 2002. ATTACHMENTS: 1. March Report COMMISSION ACTION: .. f 1""\ I I M~Ht:.I~' NO. 1 ..,......."". -.' '.'''.' '{fu' ~ .... .. -;..... '.'.",. . '.:'. .,~': -, ': . --. , ..@....tff2...;. . . , . , ;, ," " ., " '. '.. ." - .::". ,,:. q'O.. " ;,".. '::; . .EN~tNE~RS, I~C. Hickory Grove Park Road CPH Project No. W04100.1 Owner: Contractor: City of Winter Springs Esterson Construction Co., Inc. CPH Engineers, Inc. 1117 East Robinson Street Suite C Orlando, Florida 32801 Phone: 407-425-0452 Fax: 407-648-1036 _:::'.ww. cphengineers.com MONTHLY PROGRESS REPORT Apri/1, 2002 Kip Lockcuff, City of Winter Springs I, Kip, The following items reflect the current status of work complete for the above listed project: 1. The retention pond excavation has begun. Currently, the Contractor is approximately sixty percent complete with the excavation. Once the excavation is complete, the . Contractor shall begin final grading on the side slopes. 2. Site striping and clearing has been completed in the area of the proposed retention pond and along the entire length of Hickory Grove Park Road (both travel lanes ) as well as a small portion of clearing at the intersection of Hickory Grove Park Road and Tuskawilla Road 3. A portion of the road center line and the back of curb has been staked out for Hickory Grove Park ROCld. 4. The City, CPH and Esterson Construction have had a meeting with Scott Stegall of the Seminole County School Board, to discuss the proposed work schedule for Tuskawilla Road. The School Board was informed of the road work for Tuskawilla Road and of possible lane and road closures along the Road. 5. The City has set up a meeting with the Homeowners Association for the residents on Tuskawilla Road and the residents on Orange Avenue to discuss the construction for Tuskawilla Road. The tentative date for this meeting is April 4, 2002 and will be held in City Chambers at City Hall. 6. To date there have been no submittals for change orders. CPH Engineers has reviewed the first pay request and has determined that there will be at a minimum two change orders for the project. The change orders will be submitted on each individual item for which there will be overages beyond the original contract. : 7. The final paving design for Tuskawilla Road is to have brick pavers the entire length of the proposed work area for the road. This was part of an additive alternate for this project. ., SANFORD . ORLANDO . DELAND . PALM CITY . CAPE CORAL . JACKSONVILLE . PALM COAST . PUERTO RICO >'f '. ~. .~ -:~ -~ The following items are items that are in progress: The locations of the right-of-way and utility easement areas along the east side of Tuskawilla Road have been drafted by Tinklepaugh Surveying. Tinklepaugh is currently drafting the legal descriptions written. This will be forwarded to the -- Engineer once completed. 2 The location and description of the additional right-of-way along the south an?t east side of Hickory Grove Park Road and along the west side of Tuskawilla Road at SR 434 have been completed. The descriptions have been forwardEld to Tinklepaugh Surveying for their review and conformation. 3 The power line and panel box at the radio tower north of City Hall still needs to be relocated. 4 CPH is still waiting for a revised cost estimate for the revisions to the plans at the intersection of Hickory Grove Park Road and SR 434. 5 CPH is still waiting for a cost estimate for a proposed force main to be installed from the south side of SR 434 to the first sanitary sewer manhole on Hickory Grove Park Road. Please review the above listed items and if you have any comments or questions, please contact Allen Lane. Sincerely, CPH ENGINEERS, INC. /~c Allen C. Lane, Jr. CC: David Mahler, P.E. .' J:\W04100.1\WD\0401 Monthly Report.DOC -