Loading...
HomeMy WebLinkAbout2002 08 26 Informational A Current Planning Projects COMMISSION AGENDA ITEM A CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR o si11/0 2 Meeting MGR.(~EPT ;# Authorization REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Commission on the status of current planning projects. CONSIDERATION: Avery Park - Cons~ction continues. The developer is investigating the possibility of cantilevering the wall of a proposed domicile at lot l8 over the property line and into the air- space above the common up-land area adjacent to and associated with the storm-water pond. Belfaire(formerly Battle Ridge) - In May, all files and correspondence relating to the final engineering/subdivision plan and modification to the annexation and pre-development agreement were copied for Stenstrom, McIntosh, Colbert, Whigham and Simmons (the City of Oviedo's Attorney). Construction has been proceeding. A representative from both the Seminole County Planning Department and the Black Hammock citizens group inspected the approved plan and the First Addendum to the Annexation and Pre-development Agreement. Fox Run Preliminary Subdivision Plan- On March 26, staff received the application and plans for preliminary subdivision of a 5-lot residential subdivision on 1.28 acres at the west end of Panama Circle. This item was reviewed at the April 2, 2002, DRC. Staff awaits a re- / submittal. Garcia Driveway Re-Iocate. - Staff received an application from Manny Garcia to relocate a private drive/roadway from Tuscawilla Unit 5 onto an adjacent portion of Oak Forest Tract "A" that Mr. Garcia owns. The item was initially scheduled for the June 18, 2002, DRC, but was re-scheduled for the July 2, 2002, DRC. Staff received a partial response to the DRC comments and awaits a complete response. Augus~2002 Information Item A Page 2 Highlands Apts., Phase II - The 42 unit apartment preliminary site plan was approved on April 22, 2002. The final engineering/site plan re-submittal was reviewed at the July2, 2002, DRC and plans are being revised for the City Commission review. JDC Calhoun - Construction continues. Buildings 9 and II are under construction. Buildings 13 and 14 are still in the permit stage. No solution for the Wendy's (Building No. 15) drive- thru access has been reached. Any modification of the approved site plan must be approved by the City Commission. Building lO (Washington Mutual) received a special exception but has not submitted building plans. Miranda - Staff awaits a site plan submittal. Nursery Road (Phil Reece) - Staff awaits a building plan submittal for the walls and engineering plans for the storm-water pond. Oak Forest Unit 7 (Triangular-shaped O.86-Acre Tract between Oak Forest & Tuskawilla Office Park) - Staff has visited the site to determine the veracity of allegations about the wall and trees. City staff met with one of the City's surveying consultants to try to find an affordable solution to the subdivision process. Trees that the homeowners removed without a permit have not been replaced. Parkstone - Construction continues. Since the City Commission accepted those potable water and sewer improvements that were to be dedicated to the City, the applicant has requested that the performance bonds (guaranteeing their installation) for units 3 and 4 be returned. SR 434 Retail(a.k.a. Villagio) - The FDOT conducted a meeting to discuss access alternatives. The applicant has submitted another site plan design, minus the cross-access between the site and Stone Gable Circle, with two curb-cuts onto SR 434, and with a relocated median-cut. The applicant has contacted the HOA to meet with them about the project (08/05/02 at 6:30 P.M.). The final site plan is scheduled for the August 7, 2002, Planning and Zoning Board meeting. SR 434 Roadway Improvements Project - No additional information. Torcaso Park Improvements- On March 27, staff received the final engineering/site plan for the City's Torcaso Park improvements. This item was reviewed at the April 2, 2002, DRC meeting. Tuskawilla Office Park - Construction is proceeding. The final plat was recorded with the Clerk of the Circuit Court. A proposed entry feature with signage was forwarded to Dover Kohl for review, but no solution has been attained. Tuskawilla Trails. - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64 acres) was approved at the June 10, 2002, City Commission meeting. Staff awaits submittal of the final engineering plans. AUgus~ 2002 Information Item A Page 3 Wagner's Curve - The final subdivision plan was submitted May 24, 2002, and reviewed at the June 4,2002, DRC meeting. Staff awaits are-submittal of the final subdivision plans. Winter Sprillgs Elementary. - A site plan for a 15,000 SF learning center, to replace existing portables, was received May 3, 2002, and reviewed at the May 21, 2002, DRC. Are-submittal was reviewed at the June l8, 2002, DRC. Board of Adjustment - The Board of Adjustment (BOA) met on August I to consider 2 rear- yard building setback requests. FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: