Loading...
HomeMy WebLinkAbout2002 09 09 Regular O Serious Issues with Doran Project 090902 Add On Regular 0 Publix Lighting,doc COMMISSION AGENDA ADD-ON ITEM 0 Consent Informational Public Hearing Regular X September 9,2002 Meeting Mgr. ~7 Authorization Dept. REQUEST: City Manager advising the Commission of a serious issue related to the Town Center and requesting appropriate direction. PURPOSE: This agenda item is needed to make the Commission aware of a serious issue related to the Doran project and providing the Commission with an opportunity to provide any direction it deems appropriate. CONSIDERA TIONS: In violation of previously approved lighting plans and permit requirements the lighting poles and fixtures installed by Doran represent irreparable harm to the design of the Town Center and cannot be tolerated. Relatedly, I have advised Shane Doran in the attached letter that, CO's will be withheld until an appropriate resolution can be found. In direct contradiction to the approved plans and everything we have done to prevent the parking lot from looking like a traditional strip mall parking field, the installation of high, modem poles creates, in fact, the look of a typical strip mall parking field. A resolution involving shorter ornamental poles must be found if we are to maintain a Town Center design theme. FUNDING: Unknown RECOMMENDATION: It is recommended that the Commission confirm the City Manager's decision to withhold the CO's on the Doran project until such time a resolution to the lighting issues is resolved. A TT ACHMENTS: September 6, 2002 Letter to Shane Doran COMMISSION ACTION: /~~, /<': /'-~~~'\ .. O",{,---'--__J1 "\~ (tJ ".""~\-"r~)'\ \~ 'u. . -,~--\ I (f)j \ .. . . 11,1L',(...riH....I~ I, '\ . 19~(~..... J/ \, >"~ J. ;7"/1 '- :'~I;> .-.--.. e",," '" ~:::~~g/ CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 Ronald W, McLemore City Manager September 6, 2002 Shane Doran, Vice President James Doran Company 216 Seven Farms Drive, Suite 200 Charleston, SC 29492 Dear Shane: In all of our previous discussions you and your staff have represented that the lighting fixtures in the Doran project would be compatible with the design of the city's lighting poles and fixtures, and the theme of the Town Center. In fact, in one meeting Lee Colyer stated to me that you would be adopting the same Washington style pole and acorn lighting fixture chosen by the city for the Town Center which have a maximum height of 15 feet. Moreover, your landscape architectural plans submitted to and approved by the Commission on October 22, 2001 along with your final engineering plans clearly provided for HADCO R51 BCNA Acorn Style Lighting on 12 and 16 foot ornamental poles. None of the lighting installed is consistent with the approved plans. On Tuesday evening, September 3, 2002, on my way out of town to attend a Wednesday funeral in Fort Lauderdale, I visited the site and noticed that high 30-foot modem poles and fixtures incompatible with the Town Center design theme, incompatible with poles and fixtures being utilized by the city and the approved plans for the project, had been erected. Wednesday I called your architect in Atlanta and advised him that this was not in keeping with our agreement, that I was not aware of the city approving a revised lighting plan, and that other arrangements would have to be made. Your architect advised that he had to use these high poles and modem fixtures to meet Publix minimum lighting levels. On Thursday, September 4, 2002, when I returned to the city from Ft. Lauderdale I checked with staff to detemline if the plans had been revised. In my review I determined the following: I. Revised lighting plans were received by the city on Thursday, August 29, 2002 from your Architect Randall Paulsen. 2. On September 5, 2002 the city received an application for a permit to install the revised lighting plan. In conclusion, your company has installed revised lighting poles and fixtures before you provided the city with revised plans and before you applied for a permit for installation. Secondly, the revised lighting plans you have submitted are inconsistent with the design theme of the Town Center and the lighting plans approved by the city on October 22, 2001. Therefore, I am putting you on notice that you have not complied with the city regulations and requirements in this matter and must cease and desist with any additional installation of lighting poles and fixtures. I want to point out that the intensity of the light required by Publix is not of concern to the city. What the city anticipated was a plan that would be representative of street lighting on Main Street, USA, with ornamental metal or concrete poles and acorn style fixtures consistent with the plans approved on October 22, 2001. Instead, what you have installed without appropriate plans and permits, and submitted in the form of revised plans is representative of a strip mall parking field lighting plan. What is of particular concern is the height of the lighting poles and the modem design of the poles and fixtures. Furthermore, I am familiar with multiple ornamental fixtures including as many as five fixtures on 20-foot ornamental poles that would provide intensive lighting of the level required by Publix. I don't understand why you could not have chosen this type fixture. Additionally, the shorter fiberglass poles while workable, are disappointing. I have no alternative but to bring this matter before the Commission sitting as the DRC Monday night recommending disapproval of the plan and that the CO's for Publix be withheld until such time that this issue is resolved, Sincerely, /2 1p1~ // Ronald W. McLemore City Manager /jp cc: Mayor and Commission Lee Coyler Rick Maxian U:\Docs\Word\Town CenterVDC Dcyclopment\Publix Lighting Issucs,doc 11111111""11111111111111",1"'1111111'1'1111111111111111111 1/2" TOOLED CONTRACTION JOINT W/ 1/2" RADU, EDGE 4" SMOOTH CONCRETE BAND TYPICAL ALL SIDES D1 "=1'-0" L101 TYPICAL CONCRETE SIDEWALK li~;:;~.:~>:::=-' - .' ~W.: q' . ~~.~"! . ".::t. ~..r'.. !~:' :'.." '-'. ~t.. '~-~....: ~.~: .. .;-. - -,~., . ,"I:" ';;~i~~~;~j.;j:<5~t~~~ 1 NTS L101 SITE LIGHTING FIXTURE NOTES: DECORATIVE CAP PLAN 15" WIDTH AT ACORN SEALED GLOBE W/ REFRACTOR LENS 1I111lijijillliliiiiiillllliiiiilllllliiillllllliiiiilllll!il:i!! ~ 1/2" RADIUS EDGE. TYPICAL ALL SIDES EXPANSION JOINT (SEE SECTION) 42" OVERALL FIXTURE HIEGHT SEE ELECTRICAL PLAN FOR POLE HIEGHT llilIES; 1, FIXTURE BY DESIGN IS HADCO R51 BCNA. CONTRACTOR TO SUBMIT SPECIFICATIONS IF REOUESTING SUBSTITUTION. 2. FINAL FIXTURE SELECTION WILL BE COORDINATED WITH CITY R,O.W, LIGHTING IMPROVEMENT. ";"":'J D3 3/4"=1 '-0" LUMino.ire Schedule Project: All Projects - SYMbol Qty Lo.bel Arra.ngeMent LUMens LLF Description 0 0 44 R51BCNA,' T REF, 320\V PS, BACK-BACK 34000 0,800 16' POLE ~ 20 R51BCNA, T REF, 320\vPS" 3 @ 120 DEGREES 34000 0,800 16' POLE c:J 32 R51BCNA, T REF, 175\V MH SINGLE 14000 0,800 12' POLE ~oo~~@ 1 i ARCHITECTURAL OUTDOOR LIGHTING ! o.~COl'lpo.ny - I ! Project: i WINTER SPRINGS TOWN CENTER I i Rep: STEVE SA TEY PARKING LOT IlluMino.nce Vo.lues(F c) Avero.ge =8.51 Mo.xiMUM =12,5 MiniMUM =5,0 Avg/Min Ra. tio=1. 70 Mo.x/Min Ro. tio=2,50 cole: 1in.= x ft. Project : 081401-1 08/21/01 Drawing: RESH WILHELM I Dote: NOTES: 1. CALCULATIONS DO NOT SHOW THE EFFECTS OF SHADOWING CAUSED BY OBJECTS WITHIN THE AREA, 2. READINGS SHOWN ARE MAINTAINED HORIZONTAL FOOTCANDLES TAKEN AT GRADE, "..-- t.lb~1iNb SHoJ.JN IN. (,.1-('( R.o,kl, , (DR CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-18JtO Ronald W. McLemore City Manager MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager ;1'\....- September 9,2002 From: Date: Subj: Doran Development Lighting Issues =n~WoA.---~ cr-d ~ ~. () c;fc1lo1J ~ This date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28,2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to the recent plan submitted on August 28, 2002 that has been built but not approved. October 22,2001 November 30,2001 August 28, 2002 Approved Plan 96 Poles Unapproved Plan 80 Poles Unapproved Plan 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. Ijp \\CITYHALLl\JPALLADINO\Docs\Word\Town Center\JOC Development\090902 Doran Development Lighting Issue memo,doc CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 Ronald W, McLemore City Manager MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager l'\../ September 9,2002 From: Date: Subj: Doran Development Lighting Issues This date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28,2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to the recent plan submitted on August 28, 2002 that has been built but not approved. October 22, 2001 November 30,2001 August 28, 2002 Approved Plan 96 Poles Unapproved Plan '80 Poles Unapproved Plan 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. Ijp \\CITYHALLl\JPALLAOINO\Docs\Word\Town CenterVDC Developrnent\090902 Doran Dcveloprnent Lighting Issue merno,doc ~ ~Ct.~-=:'~~ t:' .... ~~1::\J -z. _I I. f;l Ul '-:;-~~ J (J) . \Incvq)o.at~lf ..\..,.J/ ' \ i'J59 ''-, / ./:-.......-. --/. ,-lOi<\o~ ...------ Ronald W. McLemore City Manager CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager ;1"-" September 9, 2002 From: Date: Subj: Doran Development Lighting Issues Thls date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28, 2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to tJ;le recent plan submitted on August 28, 2002 that has been built but not approved. October 22, 2001 November 30,2001 August 28, 2002 Approved Plan 96 Poles Unapproved Plan 80 Poles Unapproved Plan 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. Ijp \\CITYHALLlVPALLADlNO\Docs\Word\Town Center\lDC Development\090902 Doran Development Lighting Issue memo,doc ~\NTE:.<<? ~\~~j~~'" tl .~'~ \~ ~( '-:;0---1) IJJ , ,I"<,,,p"'.t..t~\ I ' \ Jl)5f}l~ '~'---_/ ~~~ Ronald W, McLemore City Manager CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager l"-../ September 9,2002 From: Date: Subj: Doran Development Lighting Issues This date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28,2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to the recent plan submitted on August 28, 2002 that has been built but not approved. October 22, 2001 November 30, 2001 August 28, 2002 Approved Plan 96 Poles Unapproved Plan 80 Poles Unapproved Plan 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. Ijp \\CITYHALLlVPALLADlNO\Docs\Word\Town Center\JDC Development\090902 Doran Development Lighting Issue memo,doc CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708.2799 Telephone (407) 327-1800 MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager /\...../ September 9,2002 From: Date: Subj: Doran Development Lighting Issues This date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28, 2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to the recent plan submitted on August 28, 2002 that has been built but not approved. October 22,2001 November 30,2001 August 28, 2002 Approved Plan Unapproved Plan Unapproved Plan 96 Poles 80 Poles 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. Ijp \\CITYHALLIVPALLADlNO\Docs\Word\Town CentcrVDC Dcvelopment\090902 Doran Dcvelopmcnt Lighting Issue memo,doc CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 Ronald W, McLemore City Manager MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager l'\.../ September 9, 2002 From: Date: Subj: Doran Development Lighting Issues This date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28, 2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to the recent plan submitted on August 28, 2002 that has been built but not approved. October 22,2001 November 30, 2001 August 28, 2002 Approved Plan 96 Poles Unapproved Plan 80 Poles Unapproved Plan 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. /jp \\CITYHALLlVPALLADlNO\Docs\Word\Town CenterVDC Development\090902 Doran Development Lighting Issue memo. doc ;.,.l\Y'.ITl::~ ~~-,--~~ t( "':. ~ 01 ' (J) , ", . \lnc(Ir()nrac!ttt" ' . \ 1~59 '. ,~-~: ~\op. Ronald W, McLemore City Manager CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager l\...../ September 9,2002 From: Date: Subj: Doran Development Lighting Issues This date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28, 2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to the recent plan submitted on August 28, 2002 that has been built but not approved. October 22,2001 November 30, 2001 August 28, 2002 Approved Plan Unapproved Plan Unapproved Plan 96 Poles 80 Poles 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. Ijp \\CITYHALLl\JPALLADlNO\Docs\Word\Town Center\JDC Development\090902 Doran Development Lighting Issue memo,doc CITY OF WINTER SPRINGS, FLORIDA Ronald W. McLemore City Manager 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 April 18, 2002 Richard Maxian Randall Paulson Architects Roswell Mill 85-A Mill Street, Suite 200 Roswell, GA 30075 Dear Ric: In response to your question regarding the parking lot lighting poles and fixtures for your Town Center development in Winter Springs, please be advised of the following: The typical high pole 5 foot candle light fixture will not be permissible in the Town Center. There is a pending ordinance that will be adopted within the next thirty days requiring parking lot lighting to have not more than .5 foot candle light bleed over into areas adjacent to the parking area. This standard will have to be met in your client's parking lot. Additionally, the city has adopted a street lighting ~tandard for the Town Center and intersections along State Road 434 that will be permissible in the parking lot. I have attached two poles and fixtures that meet this standard. Furthermore, we prefer the glass globes rather than the poly carbonate due to the fact that the heat and sunlight in this area causes the poly carbonate to rapidly discolor, causing numerous blends of color. I don't think your client would be happy with.this-either:'-' - --,- --. If you need any additional information, please contact me at your convenience. Si~ Ronald W. McLemore City Manager /jp cc: Mayor and Commission Attachment \\CITYHALL]DC\JPALLADINO\Docs\Word\Town CenterVOC Oevelopment\Street Lighting in Parking Lots.doc o p::::j 5. top diameter Pole length /OJ 16' bolt circle';; '0" o ,- t}. o fi;, .,r..... '-'7;{ .,~t.:: "', '.',' '.\- .:~. /,,~1:~ ""t.-,, Emlxddcd I ',' :/::i[f{:~::'. ,,' :,;'~'~';~:;{.:. . :~,};~j.,:' "{ .;; '~',. ~ ,;.. lktvrian .. ':'y Style II - Order information Anchor Base Order Shaft Lamp Cn," Weight Number Length (nominal) (Ibs) VBF-3,l * # 10'2' 11'6' 350 VBF-4,l * # 1315~ :. 14'6' 400 VBF-4.7 * # 15!5" . 17'0' 500 VBF-5,6 * # 18'011' 19'6' 640 Embedded Order Shaft ' Lamp Crr," Weight Number Length , (nominal) (Ibs) VEF-3 * # 9'8" 11'6" , 430 " VEF-4,O * # 13'1 tI '14'6' 480 VEF-4,6 * # 15'111 17'0' 630 VEF-5,5 * # 171811 19'6' 800 .1 411f~\t:~... < * Insen three-digit code for color and finish choice~ See aggregate sheet. . . # Insert code for luminairt: choice. See lumi.naire sheet. :>\;:::"'~:"~'> "FOtdOUbl~'annlu~,add38'tobrnPcentet, ,{j.j~:;' General informatIOn, . ,;J!~\i'f!;; , Ameron's Traditional Series poles,are available in a variety of stand"fdl!i;\? --, and custom configurations, Constructed with the highest quality:\ . 'c." ' _ prestressed concrete, these'<:entrifugally cast; low-maintenance po! 't,f:~, arc strong, durable and vi~ia?on resistant, All poles can be fitted ,..,~,:",'~'?' smgle or double-arm lwruna1tcs manuf.u:tured by Ameron, " ,:,!Ii*" -. J'}4,~}!~ C)i' " Surface treatment '"",, The concrete shafts are ligndy bl~ed to exposetIie texrure'aiid';c beauty of the natural andtciTii~;iggi:egateSwhilomaintitihings shatp d~finition of de~;~d.-p~p:pns;.t\'an'opti?n; 1'01",,3#j,~;; be proVlded WIth surfuces'unparied by,the mold," >..,;, ".. "~'i"""',., ,Colors and finishes~~~r~:J');~J,~,/r:""t,' ;:,y,', <':11" Many standard and custolll"ggr:egate.colorsare aViiilable: See the' separate aggregate scled:i6i).'she8t fu(de#:Grnmti :i-esistant:'::,iw~~~ coatings are available to.~~~~~!i~~)~ces"~M-PC~~~S~]i~~:f~ AmerlocI<- and Amershidd<ocoanngs protect all metal parts an&. ,'>);,;'?;'(~,:" accesrories. ]~~0~7~J~:;::~ ,',/:.:". ..... ,..{'. : ...~~?~;~:~~M' -~.~~ For more information abOfi't%i1eMil's Traditional $eries Po.le1, ~r.j:B"" contact any ofouragen~$:at1prrWi~~.)~Qr:.tht:'agenis in ypur\fe4 'f," call toll-free 800-228-367,9.1'iD.'(ie3lifOriiia'800:22n2989.:",,:::'!\'Ii ,;t~tIJ;'~~:ii;A0fl1:N',\),~~~;' ?::lii~;; Ameron Pole pig&fas:rii~io~ '.., ,.. ';j?~'~;~~ _r<!._,I.. 'c- """"', ,: -, . 1020 "B" Street FiIlmore~Galifdriii:i 93015 ~. /,i,!f~iit4i~:(~~;~:i~;.~;~ ~2:,~~~~~:,~ ::..~?dj~~ . -,t;.._:: <-.1 f.0:~~:?:?~"~ :..'''~~' . _:.~,f{,..>:.. ,;..'X ~S~.~::t~:~t-.~:(~.t"J" . .~~~.'- ;-:.: ',~ ~f. ",,,'~'Wl;",,...':' .\..... .;.;:::;};t[,t:'"'~"V f",,.;,...~~._;;r;;;g~, : ~1!:4 . :'.'i,',::..... ;...' .. "..'7..~.,~,~.~I"t..-:;~;',. ~."'.',!;;' ,.~~~61;~; . .~'..--.;'.. ": ' 04/16/02 '&1 407 849 9402 PEe 2 '17: 45 ~::~,:,9:~~,~t;~'r:p~~) ,.K';;:~$;<~':~~' j ~,~"~~'> & ~ 9'5' ~~I [lJ 0021002 DESIGN Pl538 "':':.', '" .'l:'U."M'J'N A IRE: " , , : ". . . . ," .- - 4'0n__~ Styl.: NL 124-4 G1~: Polycorbonol.~ Watfage/Lan:tping: Motcury Vapor (100, 175 Of 250 Walt) High Pressuru Sodium (70, 100, 150,200 Of' 250 Waft) Motal Halido (100, 175 or 250 Wotr) In(:Ond~t Distribution: Symmetric or ~melric: Voltage: 120, 206, 240, 271 or 480 Options: Pri5mOlic (N1.318RJ Globo See Luminoire Sedion fOf Details :~ .::;..., ~... . '. .: :1,,::... .~.. . ,.;..~. ,.:. '.~ :.:.,;' . .';-:':' L::UMINAI.RE;,-r::EN'ON:'CH::TAI L' ,'- .'::::-({ .:~. :" '.: '..:.:"~: ~" (~.~'. :';'.=.::.:: ':,"' '.:: ';):. '", :. ;~'':. MM!5 ;~~_. lA_~i;tw , - - . - .. .-.- . I II. ".'...:_ :~;'~._~~ M.....-' "".... --......- ,.- - "~I _I.A. "'__11__ ..,_ ~.. - "" ow ____._.. ~~::= ':'::)'::>',: icf.~O;{RT~*~t$~,~i '::'>,;Y:~i.~ Shoff - Fabricated Steel, ASTM.AS9S Bose. l.pe. Qm Alurnxn, M.J56.Of. _ '..n.... , _ _ _, _, 12'-16' . ..... I . J"_ t . _ ~~~~ ;..;~...- ~fVu In ousu . .. I. ___& .._....__ -..-........... -_.---~,~QfYl.;I~ ~ ft_,,_.o I .._ _ ._t ... .. ... .J -~ -. ,., . ....-. . .........-- 11111 Union Metal CORPOAATlON p.o. eo.c 9920 . Ca.-t/gn. OhIo oW711 Phone (330) 456.16S3 . fax (33OJ 456.0196 6,94' DtA. ----. I 27' I I J'___l: BOLT PROJfcnON: 21/2" ~ : ..-,"..... ;" ...,'. : . . I,' .::. ...... '. ...... " .,,',':.' ,:' A='JCt:t.O,~ B~!-:.T'-pAT~: ': ,.--: ~ ,-:. '. . ;':' ":'. ';".' ':"";'. " , '. . . ~"9 heigh1w ahown ONt r.coMtl'lended, other ~ heighlll or. CM3ilobl.. .. s.. ~ion IlKtion lpede~ WA COlWIn.cion) for co....plete dosiQn cl.toils and Mw to ordor. Lc_'5.5'_~ 01A. Memorandum To: Ronald W. McLemore, City Manager From: Mike Scheraldi, Buildiog Inspector} Ref: Doran Project Lighting Plans and Inspection Date: September 9,2002 On August 27, 2002 I was performing building inspections on the Doran Project in the Town Center when I was approached by Doran Project Manager John Bates who requested that'I inspect light pole footings while I was on site due to the possibility of delays that might result from expected rainfall. I agreed to accommodate Mr. Bates as a courtesy, but cautioned Mr. Bates that I didn't have an approved set of plans to inspect with, and noted on the plans "POUR AT YOUR OWN RISK. NOT FINAL APPROVED BY THE CITY 8/22/02 (Initialed) I then performed a footing inspection on nine (9) light pole footings. NOTE: I mistakenly dated the note 8/22/02, when it was actually 8/27/02 when I did these inspections. On 8/29/02 an unidentified permit runner submitted a copy of a revised site lighting plan and clock tower to the City Permit Specialist indicating they were for Plans Examiner, Davis Alamina., ,Pennitting Division Manager, .Max ,Epstein routed, the revised, copy of ,'...., the Clock Tower Plans to Inspector Scheraldi and the revised Site lighting Plans to City Manager, Ron McLemore. On 8/30/02 I inspected six (6) more light pole footings as a courtesy. On 9/4/02 I inspected 1 more light pole footing as a courtesy. On 9/5/02 the City received a permit application for the construction of the Site Lighting Plan submitted on August 29,2002. .'..~.. .'; ;-l~>' ;~--"'-- - --- cIJi~~~~~~GS I pbit # _:.::_. Date q - t/ --() d, . Time .) Type ofPermlt: (Chebk"~illthat apply) _Building ~'Electrical _ Plumbing Mechanical I. . '. ....... I Fence Pool Shed _ Roofing 'CiiIitract Value: ='~Alan _ R.O.W. Pods _ Sign Arbor Permit # Septic Permit # (Fee Simple) OWner's Name t a 0 j I-a.l ~lZet' t1. L:U _ Phone # gq 3 - ~ '8 , - 7 5x, ..,,~. .....--, , ~mng A~s~,;';,,; :~f.i.t,2f$V'en Fa f.ill!5.J3d 5u.i h' 2m ('bllrk.<;to"-,~,, Zq<t ConstructlonAddress'. ("uJ/~;ff'r ~<)pI;n3s . Tt,l!Jf1 (lpnkr Lot# Living sq.ft.'l~<floo~ 1 . . , /. Living sq. ft. 2nd. floor Livirig Other sq. ft. ~' Sq. ft. Of: ..r:,G~ge ' Entry . Rear Porch. Other non-conditioned Subdivision' .:'" ....,qJ5TC. Zoning Section_ TownshiP. Range Contractor \1"', RA~~Y\rl ('l)~+Co(pAddress Phone # .gt1.1R("fr. License # . Expires Bon~g Company, Address ArchitectlEngmeer Address Mortgage Lender Address Work Description LoT' [;.; '-lInt!-> LUe6+ t&Jft'(\.!ltJ. LtJ'juJerrJ FL 3J. 750 Workman's .comp Expires 11:lpt't!'!~~!: Contractor .&Ic.c. 6C Address ~ 5. . . . . .' tit) 7 ,,.p,~~~ #: ~~c(x)/,1lq Exprres'&/31/0L/- Phone #,6S'7(J9)j Amperage ..~... Descrif~~\ ~(d'; c f,.; <,_+r ,'r", I :"5e nr i <: <" ~ h+ pQ l<"':"i . ''':'c nC;;C ~ .::-tlr Voltag~ (.. P~ T-Pol.: Ycs---,- -No_see. p IIi--h. .~..._:.ua4:....a~. CQAtra9t9~ .~..~ Address Po l e..- '/11:5+ tL (/a.t-,i (J n 5 R- "3Z'7<1 ,1c~~e.#. '~'. : '{, Expires Phone # u__i. np~,.rintinri Or "". Ae..,:,:'e.'lec+ r U:. .""1-e r\h( e.. +0 ----- -n_-r-':--,.....~~~"_I..H . . , :'''~'':''n' Type' EER SEER . Contract Amount $ 1 ~~\~~ ~1 J' \ r rrt A Contract amou~~ ' ~~ 0 \" . ~~ ,~ ~ ~'\1 ... of: Fixtures to be added. ' . 1~ ~ tt\ ._.~. Water Heaters. Vacuum Breakers ua Water Drams tlI~ C :==:~-c:i=-l Fixtures: As defined by 1994 Standard Plumbing Code Fixture Unit-Table 713.1 ~~ . I . " .....r ~UIU u~ll~; Contractor.':, Address i,.p,n"", H Expires Phone # ,n:_ Description ~::.. Type Contractor . .' , Expires, ;"~'_.'_.........' '.' ....; ....,.'. ~",.~"J'J.'. _An uescr.l~~on.. .,:', ' .'" . Phone Address '..' ..,~: .':. ; . . . . , ,:CQntract Amo'UHt: ". ,. f'" , ': :;. "'f'", . " f~1' "~ ~.' . '... . September 6, 2002 Shane Doran, Vice President James Doran Company 216 Seven Farms Drive, Suite 200 Charleston, SC 29492 Dear Shane: In all of our previous discussions you and your staff have represented that the lighting fixtures in the Doran project would be compatible with the design of the city's lighting poles and fixtures, and the theme of the Town Center. In fact, in one meeting Lee Colyer stated to me that you would be adopting the same Washington style pole and acorn lighting fixture chosen by the city for the Town Center which have a maximum height of 15 feet. Moreover, your landscape architectural plans submitted to and approved by the Commission on October 22, 2001 along with your final engineering plans clearly provided for HADCD R5l BCNA Acorn Style Lighting on 12 and 16 foot ornamental poles. None of the lighting installed is consistent with the approved plans. On Tuesday evening, September 3,2002, on my way out of town to attend a Wednesday funeral in Fort Lauderdale, I visited the site and noticed that high 30-foot modem poles and fixtures incompatible with, the Town Center design theme, incompatible with, poles and fixtures being utilized by the city and the approved plans for the project, had been erected. Wednesday I called your architect in Atlanta and advised him that this was not in keeping with our agreement, that I was not aware of the city approving a revised lighting plan, and that other arrangements would have to be made. Your architect advised that he had to use these high poles and modem fixtures to meet Publix minimum lighting levels. On Thursday, September 4, 2002, when I returned to the city from Ft. Lauderdale I checked with staff to determine if the plans had been revised. In my review I determined the following: I. Revised lighting plans were received by the city on Thursday, August 29, 2002 from your Architect Randall Paulsen. 2. On September 5, 2002 the city received an application for a permit to install the revised lighting plan. In conclusion, your company has installed revised lighting poles and fixtures before you provided the city with revised plans and before you applied for a permit for installation. Secondly, the revised lighting plans you have submitted are inconsistent with the design theme of the Town Center and the lighting plans approved by the city on October 22, 2001. Therefore, I am putting you on notice that you have not complied with the city regulations and requirements in this matter and must cease and desist with any additional installation of lighting poles and fixtures. I want to point out that the intensity of the light required by Publix is not of concern to the city. What the city anticipated was a plan that would be representative of street lighting on Main Street, USA, with ornamental metal or concrete poles and acorn style fixtures consistent with the plans approved on October 22, 200 I. Instead, what you have installed without appropriate plans and permits, and submitted in the form of revised plans is representative of a strip mall parking field lighting plan. What is of particular concern is the height of the lighting poles and the modern design of the poles and fixtures. Furthermore, I am familiar with multiple ornamental fixtures including as many as five fixtures on 20-foot ornamental poles that would provide intensive lighting of the level required by Publix. I don't understand why you could not have chosen this type fixture. Additionally, the shorter fiberglass poles while workable, are disappointing. I have no alternative but to bring this matter before the Commission sitting as the DRC Monday night recommending disapproval of the plan and that the CO's for Publix be withheld until such time that this issue is resolved. Sincerely, " Ronald W. McLemore City Manager /jp cc: Mayor and Commission Lee Coyler Rick Maxian U:\Docs\Word\Town Center\JDC Developrnent\Publix Lighting Issues,doc CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS. FLORIDA 32708.2799 Telephone (407) 327-1800 Ronald W, McLemore City Manager September 9,2002 Shane Doran, Vice President James Doran Company 216 Seven Farms Drive, Suite 200 Charleston, SC 29492 Dear Shane: In response to your comments regarding a set of plans submitted in November 200 I. Several members of my staff and I worked Saturday in an attempt to locate copies of any plans constituting a revision to the lighting plans approved on October 22, 200 I by the City Commission. We have been unable to find any plans, or other forms of documents giving evidence of staff or Commission action on a revised set of lighting plans other than those submitted to the City on August 29,2002, which have not been approved. Furthermore, it is difficult to understand how a set of plans printed on June la, 2002, sealed on August 8, 2002, and submitted for approval on August 29, 2002 could have been approved sometime in November 200 I. I need your help. If you or your representatives have any documentation of staff action on any revised set of lighting plans please provide them to me as early as possible on Monday, September 9, 2002. In regards to your comments regarding the withholding of CO's, please be assured that no one here desires to take this action. However, we must get quickly to an acceptable resolution of this problem. Withholding of a CO would be the very last course of action that the City would take in this matter and only if all other alternatives failed to produce an acceptable resolution to the problem. Sincerely, ~~tJ1"~ Ronald W. McLemore City Manager Ijp cc: Richard Maxian John Bates U:\Docs\Word\Town CenlerVDC Development\090902 Lighting Plans Submittal.doc CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 Ronald W, McLemore City Manager MEMORANDUM To: Mayor and Commission Ronald W. McLemore, City Manager l'\.../ September 9,2002 From: Date: Subj: Doran Development Lighting Issues This date the building department acquired a revised lighting plan that was not approved by the City from Doran's Construction Manager dated November 30, 01. This is apparently the plan he referred to when I spoke with him this past Friday. This plan introduces the high 35-foot poles but is significantly different from the plan submitted on August 28, 2002. As shown below, the number of light poles was dramatically reduced from the original plan adopted on October 22, 2001 to the recent plan submitted on August 28, 2002 that has been built but not approved. October 22,2001 November 30,2001 August 28, 2002 J Approved Plan Unapproved Plan Unapproved Plan 96 Poles 80 Poles 68 Poles Maximum 16 feet height Maximum 35 feet height Maximum 35 feet height Although the reduction of poles mayor may not have saved the developer a substantial amount of money, again in our opinion they do irreparable harm to the Town Center. Ijp \\CITYHALLlVPALLADlNO\Docs\Word\Town Cenler\JDC Development\090902 Doran Developmenl Lighting Issue memo.doc ?fClqUEQ/ ~C(1UI f\CP 1~J-O ) '1 RU \tv\' :'orJ t1\A(11)i'( ......~M 'J, , " ."'.;" . .:,..../..;. . ..~~-..;,rI;~~:.;;.~;~~ ~~,~.\ . ',' ',"7": ..~'~." Luminaire Schedule ,Pro ject: Winter Springs Town Center :.symbol Lobel (HOLOPHANE) Arrangement Lumens LLF Description .. ,0 MS3AC10MHMTQNNBK; 1000W MH SINGLE 1 1 0000 0.81 35' POLE 0,0 WA400MHXXX5, 400W MH BACK~BACK 36000 0.81 16' POLE 0 GV1A175MHXXXX3, 175W MH SINGLE 13000 0.81 12' POLE ",," ~~,/'-~:~ "",/ ~.I"" //// ,/~ /' // /'/ / ./' .// /,., . STATISTICS Avg 5.9 fc Max Min MaxiMin 3,8:1 Avg/Min ' 1,9: 1 11 ,9 fc 3,1 fc ,DESIGNER: MARK LYBRAND NOVEMBER 26, 2001 NOlE: PARKING LOT UGIfllNG SHAlL BE SERVED FROM SHOPPING CENrrR HOUSE PANELS. C!O/Y /7'.4h t1/~ ~//ljLJ~ ~Opl ~ 4,d;;} ;J"'7,t1~ -~:55'~/11., //A' ,,(}/11/ ~~/f;./ 'iJ4--:iJ /&:/ /~ p,hP ~ hftf 4#/~ . ~. F i:: . t~ f: ( t, ~