HomeMy WebLinkAbout2006 08 14 Consent 400 Sanitary Sewer Line Rehab COMMISSION AGENDA ITEM 400 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR August 14,2006 Meeting MGR ;v/fDFJ'T /#" Authorization REQUEST: The Utility Department is requesting authorization to hire American Water Services to perform Sanitary Sewer Line Rehab by Piggybacking ofT V olusia County Project No. 02-B-203BB. PURPOSE: The purpose of this Board item is to request authorization to piggyback off of Volusia County Project No. 02-B-203BB with American Water Services for relining of sewer lines at a cost of$166,466.00. CONSIDERATIONS: This project is needed for the maintenance and rehabilitation of the sanitary sewer collection system. The Utility Department budgets annually for sewer line rehabilitation. The V-Lining process, a trenchless technology, is the preferred method of rehabbing the sewer lines by the City. The V-Liner process is a folded high-density polyethylene pipe that is pulled through the existing sewer line and expanded and cured in place. No excavating, digging or restoration is required. Pipe size 8" 10" 15" Length(ftJ 1,319 2,231 504 Scope of Work Lining/Ft. Cleaning/Ft. $35.00 $1.25 $38.50 $1.25 $49.00 $6.00 Laterals $500 $1,750 TOTAL Cost $48,313.75 $88,682.25 $29.470.00 $166,466.00 These pipes average 33 years old. We expect the useful life of these relined pipes to increase 50 years. The locations are Sheoah Circle at Elgin Drive, Sheoah Circle at August 14,2006 Consent Agenda Item 400 Page 2 Sterling Dr. to Shepard Road, Sheoah Blvd. to North Moree Loop, South Moree Loop to the entrance of Seville on the Green, Northern Way at Swan Street, North First Street from North Bombay to North Cortez, Duncan Drive, and Inkwood Court. FUNDING: The Utility Department budgeted $200,000 in the Renewal and Replacement fund for sewer and manhole relining. The project cost of $166,466.00 will be paid from this fund. Funds will be expended over the next 45 days. RECOMMENDATION: It is recommended that authorization be granted to piggyback off V olusia County Project No. 02-B-203BB with American Water Services for reconstruction of sewer lines at a cost of$166,466.00 payable from the Utility Renewal and Replacement line code (3610-65000-30030). IMPLEMENTATION SCHEDULE: The installation will be complete within 45 days of Commission approval. ATTACHMENTS: None COMMISSION ACTION: