HomeMy WebLinkAbout2005 06 27 Informational 303 - Plans to extend Oak Forest Wall CITY COMMISSION AGENDA June 27, 2005 Meeting Consent Information X Public Hearing Regular ITEM 303 MGR. ~ /Dept-ft REQUEST: The Community Development Department, Urban Beautification Services Division, requests the City Commission review plans by the Oak Forest Wall And Beautification District Advisory Board for a wall extension. PURPOSE: The purpose of this agenda item is to infonn the Commission of plans by the Oak Forest Wall And Beautification District Advisory Board to extend the Oak Forest Wall at the North end of the development along Tuskawilla Road. CONSIDERA TIONS: The Oak Forest Capital Improvement Program was designed to provide improvements to the Oak Forest Community consisting of a perimeter wall along Tuskawilla Road and landscaping. The primary benefits of this program are: Noise Abatement, Light Abatement, and Beautification. After the original wall project was completed, $25,000 in remaining capital funds were set aside by the Advisory Board for a wall extension that would potentially be necessary after certain property adjoining Oak Forest was purchased by residents, located at the North end of the development along Tuskawilla Road. In order to provide a unified aesthetic appearance for the Oak Forest Community, the Advisory Board feels it is necessary for the wall extension to be constructed. Therefore, Staff is taking the necessary steps to solicit public bids for the wall construction and research various options for acquiring the necessary property needed for the wall to be installed. Two options are currently available for placement of the wall extension. First option, the property between Tuskawilla Road (Right-Of-Way) and Mr. Brian Oliver (Oak Forest Resident) will need to be purchased from the current land owner, Mr. Todd Newby (Seminole Pines Assoc.), at an estimated cost of $5,000 (all fees included). Second option, an easement would be granted to the City of Winter Springs by Mr. Brian Oliver, which would allow the wall to be constructed on the edge of Mr. Brian Oliver's property at an estimated cost ofless than $1,000. June 27, 2005 Info Item 303 Page 2 Projected Costs For The Oak Forest Wall Extension Project Are As Follows: 1. 2. 3. 4. 5. 6. 7. Wall Construction - Materials and Labor Legal Fees Engineering / Design / Permitting Survey Easement Abandonment (BellSouth) Purchase ofland from Mr. Newby Easement from Mr. Brain Oliver Total Maximum Cost Assuming Option 1 $20,000 $2,000 $2,500 $500 $850 $5,000 (Option 1) $1,000 (Option 2) $30,850 Staff will bring this issue back to the City Commission at a later date when additional information is available. FUNDING: No funding required at this time. RECOMMENDATION: No recommendation at this time. ATTACHMENTS: A. Photo - Proposed Oak Forest Wall Extension Site B. Map - Proposed Oak Forest Wall Extension Site CITY COMMISSION ACTION: June 27, 2005 Info Item 303 Page 3 Attachment · A' - Proposed Oak Forest Wall Extension ':':'-'"<~'i',",.Ji:',,::-'C '....,,':,-.,< '-';/>'A,<r:i;;i/J-:,j>___./6;_ Location: North end of Oak Forest Subdivision along Tuskawilla Road, bordering Tuskawil/a Office Park. June 27, 2005 Info Item 303 Page 4 Attachment '8' - Proposed Oak Forest Wall Extension Map i~J~~ii ,; L I . / " l I / l I l_ ._--~.._--"'----,.------- -......__."-~ - Proposed Wall Extension .~..- ~-- -' ...,........."..,.,/' ~,.. ...... J"".'#' /' ........... ....-- /....,.... ,.'./ { I , I ,I l I I f I I I . I I I ! I I I , I f , i ! ,I I I I " I , ~- - ....- -.._---