HomeMy WebLinkAbout2002 09 09 Informational A Current Planning Projects COMMISSION AGENDA ITEM A CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR 09/09/02 Meeting MGR. ~PT ~ Authorization REQUEST: Community Development Department is advising the City Commission of the status of various current planning projects. PURPOSE: This agenda item is to update the Comm.ission on the status of current planning projects. CONSIDERATION: Avery Park - Construction continues. per 8/26/02 agenda Belfaire(formerly Battle Ridge) - In May, all files and correspondence relating to the final engineering/subdivision plan and modification to the annexation and pre-development agreement were copied for Stenstrom, McIntosh, Colbert, Whigham and Simmons (the City of Oviedo's Attorney). Construction has been proceeding. A representative from both the Seminole County Planning Department and the Black Hammock citizens group inspected the approved plan and the First Addendum to the Annexation and Pre-development Agreement. Engle Homes is investigating the process for providing a sales trailer on-site. per 8/26/02 agenda Fox Run Preliminary Subdivision Plan- On March 26, staff received the application and plans for preliminary subdivision of a 5-10t residential subdivision on 1.28 acres at the west end of Panama Circle. This item was reviewed at the April 2, 2002, DRC. Staff awaits are-submittal per 4/22/02 agenda Garcia Driveway Re-locate. - Staff received an application from Manny Garcia to relocate a private drive/roadway from Tuscawilla Unit 5 onto an adjacent portion of Oak Forest Tract "A" that Mr. Garcia owns, The item was initially scheduled for the June 18,2002, DRC, but was re-scheduled for the July 2, 2002, DRC. Staff received a partial response to the DRC comments and awaits a complete response, Due to the complexity of the issue, the partial response will be addressed at the September 3, 2002, DRC. per 9/09/02 agenda September 9,2002 Information Item A Page 2 Highlands Apts., Phase II - The 42 unit apartment preliminary site plan was approved on April 22, 2002. The final engineering/site plan was scheduled on the August 12 City Commission agenda, but was not heard, The Commission directed that the plans be completed before being brought back to the City Commission. per 9/09/02 agenda JDC Calhoun - Construction continues. Buildings 9 and 11 are under construction. Buildings 13 and 14 are still in the permit stage. No solution for the Wendy's (Building No. 15) drive- thru access has been reached. Any modification of the approved site plan must be approved by the City Commission. Building 10 (Washington Mutual) received a special exception but has not submitted building plans. per 8/12/02 agenda Miranda - Staff has conducted a pre-application conference with the applicant's engineer and awaits a site plan submittal. Staff has inquired of Dover Kohl & Partners of specifics of the frontage roadway. per 8/26/02 agenda Nursery Road (Phil Reece) - Staff awaits a building plan submittal for the walls and engineering plans for the storm-water pond. The City Manager sent Mr. Reeece a letter on August 23, reminding him of the requirements (improvements and park dedication) set forth in the development agreement that was approved on July 8 and executed August 1, 2002. per 8/26/02 agenda Oak Forest Unit 7 (Triangular-shaped 0.86-Acre Tract between Oak Forest & Tuskawilla Office Park) Trees that the homeowners removed without a permit have not been replaced, per 8/26/02 agenda Parkstone - Construction continues. Since the City Commission accepted those potable water and sewer improvements that were to be dedicated to the City, the applicant has requested that the performance bonds (guaranteeing their installation) for units 3 and 4 be returned. A letter was sent to the bonding company clarifying this and that the City is ready to return the bonds. per 8/26/02 agenda SR 434 Retail(a.k.a. Villagio) - The FDOT conducted a meeting to discuss access alternatives, The applicant has submitted another site plan design, minus the connection to Stone Gable Circle, with two curb-cuts onto SR 434, and a median-cut to serve the project. The applicant has held a meeting with the homeowners to discuss potential ways to mitigate the effects of the project (08/20/02), As a result of that meeting, several design professionals residing within Stone Gable met with the applicant's design team on August 27, 2002, to try to re-design the site to make it as acceptable to the residents as possible while still remaining a financially viable project. per 9/09/02 agenda SR 434 Roadway Improvements Project - No additional information. per 4/22/02 agenda Torcaso Park Improvements- On March 27, staff received the final engineering/site plan for the City's Torcaso Park improvements. This item was reviewed at the April 2, 2002, DRC meeting. The City Engineer is working on plans for the park. per 8/26/02 agenda September 9,2002 Information Item A Page 3 Tuskawilla Office Park - Construction is proceeding. A proposed entry feature with signage was forwarded to Dover Kohl for review, but no solution has been attained. per 8/12/02 agenda Tuskawilla Trails. - The preliminary subdivision plan (36 lots and a storm-water pond on 8.64 acres) was approved at the June 10, 2002, City Commission meeting, The final engineering plans were reviewed at the August 20, 2002, DRC. Staff awaits resubmittal. per 8/26/02 agenda Wagner's Curve - The final subdivision plan was submitted May 24, 2002, and reviewed at the June 4, 2002, DRC meeting. Staff awaits a re-submittal of the final subdivision plans, A variance application was submitted on August 22, 2002, requesting relief from the City's Subsection 9-241 (e) storm-water management requirements. A final subdivision plat was submitted on August 22, 2002, proposing to split the commercial from the residential portions of the site. The plat will be reviewed at the September 3,2002, DRC. per 9/09/02 agenda Winter Springs Elementary. - A memo has been sent to the City Attorney requesting verification of the applicability of the City's sign and dumpster pad enclosure regulations on school sites. per 8/26/02 agenda Winter Springs Elementary (New - located on SR 419) - A preliminary site plan for a new elementary school, located generally northwest of the intersection ofSR 434 and SR 419, was submitted August 21 and will be reviewed at the September 3, 2002, DRC. per 9/09/02 agenda Board of Adjustment - The Board of Adjustment (BOA) will hear an application by Centex for relief from the City's Subsection 9-241 (e) storm-water management requirements. No BOA meeting has been scheduled for September 5, 2002, because a quorum cannot be assembled. per 9/09/02 agenda FUNDING: None required RECOMMENDATION: None required ATTACHMENTS: None COMMISSION ACTION: