Loading...
HomeMy WebLinkAbout2002 09 23 Consent I Repairs to the Mt. Laurel Retention Pond l' COMMISSION AGENDA ITEM I CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR September 23, 2002 Meeting MGR )VrDEPT )~ Authorization REQUEST: Public Works/Stormwater Division Requesting Emergency Authorization For Repairs to the Mt. Laurel Retention Pond. PURPOSE: The purpose of this Board item is to request authorization for the construction of emergency repairs to the Mt. Laurel retention pond with Prime Construction Group, . Inc. at a cost of$16,217.66. CONSIDERATIONS: This approval is needed to perform emergency repairs to the Mt. Laurel Drive retention pond. Storm events on the weekend of August 31 sl resulted in the failure of a retention pond berm on Mt. Laurel Drive. Periodic rainfalls have continued to erode more of the berm and piping. Prime Construction Group, Inc. was contacted to provide an emergency repair estimate. They have been the low bidder on two recent City projects. Their estimate is attached. The scope -Of work could De completed 'within five days.,'. . Tli '-"1' 'L (~}..L '. \ \.._-- ! /..... I.,t.. ,,_.~~---....-"-' Z>"'~~-.i'~_t l r \ ~ .':., I'" \ ..-:~. _ \ I L ' c- .:, \ . \, '\ \ 1 ""c,~,~~: ;'.IS~; CR;=;~;~; ::,Et'.'lli'.::;Lt: Th,,\!L { i ~~J.: /.'",-',.' ...., - .... ::...\;_ ,_-.: .......- .;~ .,; 1.1. . ~ ",\."~~ '" \' .. ", ""./'1/ '=----------1 \.~'.' o'.'~ 1 ::'" \':. 1.''1 121 I "11 I:. J,J.J3 "- -, September 13,2002 Consent Agenda Item I Page 2 FUNDING: The funding source for this expense is the reserves of the FY 2002/2003 Stormwater Utility Fund. Projected reserves as of October 1, 2002 are at $147,000. The funds will be expended over the next 30 days. RECOMMENDATION: It is recommended that authorization be given to perform emergency repairs to the Mt. Laurel by Prime Construction Group, Inc. at a cost of$16,217.66 payable from the FY 2002/2003 reserves of the Stormwater Utility Fund. IMPLEMENTA TION SCHEDULE: The new pond maintenance contract will commence on April 1, 2001 for a twelve- month period with an option for a second and third twelve-month period if the work performance is satisfactory. ATTACHMENTS: 1. Cost Estimate COMMISSION ACTION: U~/LJ./4VV4 V~;~~ r^A ~Ulb~obl0~ 1't< Hili CUN ':;Tl<L1CT tuN ~002 '-1 Change Order Proposal Change Request No.: Owner Reference: Description: Date: lO-Sep-02 City of Winter Springs Pond reconstruction Crew Size Quantity Unit Unit Price Extension Forman Operator Lahar Foreman, Dirt :)perator. Track Excavator laborer. unskilled 1 1 1 5 5 5 Day Day day $300.00 $264.00 $165.00 $1.500.00 $1,320.00 $825.00 peG Labor S4Jbtot31 $3,645.00 PCG Labor Marku 20. $729.00 Subcontracts eQuipment moves 6 Ea $250.00 $1,500.00 MOT 1 Is $100.00 $100.00 Sod 600 sqyds $2.10 $1,260.00 SubCOl $2,860.00 Subcontractor Markup 20.00 $572.00 Materials Clay Delivered 100 yds $9.00 $900,00 Rubble 3" to 8" delivered 40 tons $22.00 $880.00 Concrete for sidewalk 1 Is $250.00 $250.00 Filter Cloth 1 roll $235.00 $235.00 Material Subtotal $2,265.00 Material Tax 6.00% $135.90 Material Marku 20. 480.18 Equipment and Other Rentals PC220 Excavator Excavator. PC 220 (Mo. Rate) 5 day $302.00 $1,510.00 031 Dozer DOler, JO 650 (Mo. Rate) 5 day $251.00 $1.255.00 624 loader Loader, JD 624 - 3 CY (Mo. Ratt) 5 day $279.00 . $1.395.00 Rental Subtotal $4,160.00 Rental Tax Rental Marku 20.00% $832.00 Change Order Subtotal $15,679.08 Daily JobsiteOverhead 5.00 DayS $45.00 S225.oo Small Tool Allowance 2.00% $15,679.08 $313.58 $16.211.66 Bond Amount Change Order Grandtotal $1 1 .66 Add,t oRal Contrad im. rtqUest Days The items listed aboye a... for classlflcatJon on1, this is a Lump Sum propo$al. This estimate i$ valid for 30 daJS' F~~~~.~.~~~lllI.oo~'~ClI\teI _.__ _~_.__ _..___n__