Loading...
HomeMy WebLinkAbout2006 07 24 Consent 402 Blumberg Boulevard Town Center Trail COMMISSION AGENDA ITEM. 402 Consent X Informational Public Hearing Regular July 24,2006 Regular Meeting V //f/ Mgr. / Dept. Authorization REQUEST: Public Works Department Request Approval to Purchase Brick Pavers for the Blumberg Boulevard/ Town Center Trail from Pavers Systems. PURPOSE: To request approval to pre-purchase the required brick pavers from Pavers Systems for the Blumberg Boulevard! Town Center Trail Project for $49,473.98. CONSIDERA TIONS: This agenda item is needed to ensure the required materials are available to avoid delay to the Blumberg Boulevard improvements. Paver Systems pavers were used in the construction of the Town Center Streetscapes project constructed in 2004. The same paver colors and city lock pattern used on the pedestrian crossing landing in the Blumberg Boulevard median east of the Magnolia Square fountain has been chosen to be used leading up to the Veterans Memorial and as a matching feature on the western trail end at Doran Boulevard. These pavers were only manufactured by Paver Systems. Currently Paver Systems has discontinued this paver but will bring it back into production to allow the City to Complete the Town Center Project. For the pavers to be manufactured, Paver Systems must schedule them for production by the end of July for the pavers to be ready in the CITY OF WINTER SPRINGS CITY COMMISSION REGULAR MEETING - July 24, 2006 INFORMATIONAL AGENDA ITEM 402 PAGE20F2 scheduled September production run. If the pavers are not scheduled for the September production run, the order will have to be scheduled for the production runs in the spring of 2007. The pavers selected for the remainder of the trail were chosen to match or compliment the city lock pattern. These are considered specialty pavers and are also not part of Paver Systems regular production runs and are only produced twice a year. For the City to obtain the required quantity and colors chosen, these must also be ordered in July to be ready for September. The availability of the pavers in September will coincide with the current project schedule for the construction of the Blumberg Trail. The quantity of pavers has been provided by the architect and checked by Paver Systems to ensure the quantities are corrected. A waste factor of 10% has also been included to ensure there will be enough pavers to complete the job and have replacements for any pavers damaged in the future. FUNDING: Funding for the purchase of these pavers is budgeted in this year's budget under line code 305-65000-30045 RECOMMENDATIONS: The PublicW orks Department recommends approval to pre-purchase pavers for the Blumberg Boulevard! Town Center Trail from Pavers Systems for $49,473.98. ATTACHMENTS: None COMMISSION ACTION: S:\dept - Public Works-Utility\Commission Meetings\July 24 2006\072406_ COMM _ Consent_ 402 _ Blumberg_Trail ]avers.doc Landscape Plan Town Center Trail City of Winter Springs Florida CPH Engineers Planners Landscape Architects Surveyors Construction Management