Loading...
HomeMy WebLinkAbout2002 12 09 Consent D Traffic Signalization System . COMMISSION AGENDA ITEM D CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR December 9, 2002 Meeting MGR ~ /DEPT ~ Authorization REQUEST: Public Works Department Requesting Authorization to "Piggy-back" offtfle Seminole County Contract A/B-30210l/GG for construction of the intersection Signalization System Improvements at State Road 434 and Wagner's Curve with Traffic Control Devices, Inc. . PURPOSE: . The purpose of this Board item is to request authorization to "Piggy-back" off of Seminole County Contract A/B-302101lGG and enter into a contractual agreement with Traffic Control Devices, Inc., Altamonte Springs Florida for the construction of a traffic signalization system at the intersection of State Road 434 and Wagner's Curve at a cost of$123,472.83 plus a 10% contingency. CONSIDERATIONS: This project is needed to provide for improved traffic control and safety at the intersection of State Road 434 and Wagner's Curve. Items covered by the standard Seminole County Contract amount to $113,553.06. Items not covered are: Pedestrian LED inserts and black round top cabinet Median modifications and striping $3,262.54 $6,657.23 The project scope of work includes all labor, equipment, and materials for the installation of a complete traffic signalization system. The signals will be mast arms as per the City standard. All permits have been received. The Capital Projects Coordinator recommendation is attached. . Consent Agenda Item D December 9, 2002 Page 2 FUNDING: The proposed contract amount is $123,472.83 and $75,000.00 is budgeted for this project in the Transportation Impact Fee Fund. The interlocal for this signal anticipated $25,000 each from the School Board and Seminole County. We have received the $25,000 from the School Board. Seminole County's share was utilized for the temporary signal. In addition, the developer will be paying $19,533.31 towards the construction for changes required because of the development. The net cost to the City is $78,939.52 payable from the Transportation Impact Fee Fund (140-56310). The funds will be spent over the next 150 days. RECOMMENDATION: It is recommended that authorization be granted to "piggy-back off Seminole County . Contract NB-30210l/GG and enter into a contractual agreement with Traffic Control Devices, Inc., Altamonte Springs Florida for the construction of a traffic signalization system at the intersection of State Road 434 and Wagner's Curve at a cost of$123,472.83 plus a 10% contingency payable from the Transportation Impact Fee Fund (140-56310). IMPLEMENTATION SCHEDULE: The scope of work will be completed within 150 days of issuance of the NTP. ATTACHMENTS: 1. Capital Project Coordinator recommendation COMMISSION ACTION: . . Attachment No. 1 MEMORANDUM TO: Kip Lockcuff, P.E. Utilities/Public Works Director FROM: Gregory A. Bishop Capital Projects Coordinator RE: Bid Analysis State Road 434 and Wagner's Curve DATE: December 2, 2002 On, November 21, 2002, the City of Winter Springs received Traffic Control Devices, Inc. bid for the construction of the State Road 434 and Wagner's Curve Traffic Signal. The bid received was priced as follows: . Items cover by Seminole County Contract Items not covered by Seminole County Contract to be performed by Traffic Control Devices, Inc. (Pedestrian LED inserts and black round top cabinet) Items not covered by the contract to be performed by others ( modification of median and striping) Contingency (10%) TOTAL CONTRACT COST $113,553.06 $3,262.54 $6,657.23 $12,347.28 $135,820.11 EVALUATION OF RESPONSIBILITY The Engineer, Professional Engineering Consultants, Inc. recommended that the contract be awarded to Traffic Control Devices, Inc. based on Seminole County Contract A1B-3021 01/GG. RECOMMENDATION In my opinion, an award of the State Road 434 / Wagner's Curve Traffic Signal Upgrade project to Traffic Control Devices, Inc. is in the best interest of the City. .