Loading...
HomeMy WebLinkAbout2006 05 22 Informational 505 Stormwater Pond Saratoga Condominiums COMMISSION AGENDA ITEM 505 CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR May 22, 2006 Meeting MGR./DEPT. Authorization REQUEST: Public Works Department is Providing the Commission Information Regarding the Design and Possible Expansion of the Detention Pond at Saratoga Condominiums PURPOSE: The purpose of this agenda item is to provide the Commission information regarding the possible expansion of the proposed stormwater pond at Saratoga Condominiums CONSIDERATIONS · Final Engineering for Saratoga Condominiums was approved by the City Commission at the April 24, 2006 Commission meeting. · The approved plans included a proposed wet detention pond at the east side of the property that would exclusively serve Saratoga Condominiums (see map, Exhibit 1). · At the April 24 meeting, the Commission requested that Staff investigate the feasibility of combining the proposed Saratoga Condominiums pond with an existing pond immediately adjacent to the north side of the Saratoga site (see Exhibit 1). The existing pond serves Moss Lane and the Excelsior Business Park. · While the two ponds are relatively close to each other (within 100-200 feet at the narrowest point), the challenges with combining these two ponds into one pond include: o The ponds have an elevation difference of approximately 3-feet, with the existing pond being controlled at an elevation 3-feet lower than the proposed Saratoga pond. Lowering the control elevation of the Saratoga pond by 3-feet to match the existing pond elevation in a combined pond is not feasible. Similarly, raising the control elevation of the existing pond to match the Saratoga pond would be difficult without substantial grading of the area surrounding the existing pond. o The land between the two ponds is all jurisdictional wetlands. Wetland mitigation would be required to connect the two ponds. Informational Agenda Item 505 May 22, 2006 Page 2 of 3 o The existing and proposed ponds are both privately owned and would require an agreement between the two property owners to cover items such as construction cost sharing, maintenance responsibility, access, etc. o The time and cost for land acquisition, design, permitting, and wetland mitigation is probably not compatible with Saratoga's schedule FUNDING: None RECOMMENDATION: Based on the challenges listed above, Staff does not recommend combining the two ponds. ATTACHMENTS: 1. Exhibit 1 - Saratoga Condominiums Map COMMISSION ACTION EXHIBIT 1 Saratoga Condominiums Map