Loading...
HomeMy WebLinkAbout2005 04 11 Informational 309 Installation of Sidewalks on Northern Way, Shetland Avenue and Dyson Drive COMMISSION AGENDA ITEM 309 CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR April 11, 2005 Meeting MGR;2- IDEPT Authorization Iff REQUEST: Public Works Advising the City Commission that the Public Meeting on the Installation of Sidewalks on Northern Way, Shetland Avenue and Dyson Drive is scheduled for April 21st. PURPOSE: The purpose of this Board item is to advise the City Commission that the public meeting is scheduled for April 21, 2005, City Hall Commission chambers, 7:30 PM. CONSIDERATIONS: Staff has scheduled the public meeting for the sidewalk project for April 21, 2005 at 7:30 PM in the City Commission chambers. Design consultants and staff will be available at 6:30 PM to individually discuss the project. Notices of the meeting will be sent to the property owners abutting the project. The City newsletter will also contain information about project. RECOMMENDATION: It is recommended that the City Commission support this project and authorize staff to work with the County on informing the public on the safety benefits of this project. IMPLEMENTATION SCHEDULE: The results and recommendations of the public meetings will be brought back to the City Commission for a final decision. ATTACHMENTS: 1. Public Meeting Notification letter COMMISSION ACTION: Attachment No. 1 NOTICE PUBLIC WORKSHOP CONSTRUCTION OF SIDEWALKS ON NORTHERN WAY, SHETLAND AVENUE AND DYSON DRIVE April 21, 2005 7:30 PM Winter Springs City Hall You are invited to a public meeting held by the City of Winter Springs and Seminole County regarding proposed sidewalk safety improvements on Northern Way, Shetland Avenue and Dyson Drive. The meeting will be held on April 21st at 7:30 PM in the Winter Springs City Hall City Commission chambers. Representatives from the design consultants and staffwill be available from 6:30 to 7:30 PM to individually discuss the proposed improvements. The proposed improvements are for five foot sidewalks along the south side of Northern Way, west side of Shetland Avenue, and both sides of Dyson Drive. All three roads are part of the City collector road system and it is a goal of the City to provide sidewalks on all collector roads for safe recreational pedestrian activity as well as for school children within the two mile no bus radius. Previous public meetings have resulted in the plans being modified by reducing the initial ten foot sidewalks and the addressing of various drainage problems brought to the consultants attention. The proposed improvements are being funded through the County at a cost savings to the City of approximately $800,000. The input received from the public meeting will be provided to the Winter Springs City Commission who will subsequently make a final decision on whether to proceed to bidding and construction of this project Please plan on attending so concerns you may have can be addressed or input can be documented. If you are unable to attend, but would like to still provide input, please contact Brian Fields, P.E., City Engineer, (407-327-7597). If you have any questions, please feel free to contact Brian or myself Kipton Lockcuff, P.E. Utility/Public Works Director Cc: City Manager Mayor/City Commission Tuscawilla HOA