Loading...
HomeMy WebLinkAbout2001 05 14 Informational D Recent Culvert Cleaning ./ COMMISSION AGENDA ITEM D CONSENT INFORMATIONAL X PUBLIC HEARING REGULAR May 14,2001 Meeting MGR r:;EPT J/Y Authorization REQUEST: Public Works Department Responding to the Question Regarding the Recent Culvert cleaning of Gee Creek at S.R. 434. PURPOSE: The purpose of this Board item is to respond to the question raised at the April 23rd City Commission meeting regarding the recent culvert cleaning and bank stabilization on Gee Creek at S.R. 434. CONSIDERA TIONS: The Oviedo maintenance office ofFDOT was the group responsible for the culvert dredging and subsequent bank stabilization of Gee Creek at S.R. 434. According to Basil Saghorchi, FDOT -Oviedo maintenance engineer, the banks were covered with a filter fabric and then concrete riprap to stabilize the banks and prevent the erosion from the banks from occurring which contributed to the blockages in the culvert under S.R. 434. The top of the bank was then sodded. Using concrete rubble for riprap is a common practice both by the FDOT and City crews. While occasionally a bank may collapse resulting in the riprap falling into the creek, we have found it to be an effective method of deterring bank erosion. ATTACHMENTS: None COMMISSION ACTION: None required.