Loading...
HomeMy WebLinkAbout2006 01 23 Regular Item 302 Village Walk Landscape COMMISSION AGENDA ITEM 302 REGULAR X January 23,2006 Meeting MGR / DEPT Authorization REQUEST: The Community Development Department, Urban Beautification Services Division, is requesting approval for the installation of canopy trees in the Village Walk Project area along SR 434. PURPOSE: This Agenda Item is needed to request authorization from the City Commission to proceed with the installation of (90) canopy trees of various sizes along SR 434 between Sheoah Boulevard and SR 419 (Village Walk) in the right-of-way and easement areas. CONSIDERATIONS: On November 28, 2005, City Staff presented regular agenda item 502 requesting the City Commission delay the installation of canopy trees along SR 434 in the Village Walk area until funding became available. The City Commission instructed Staff to return with additional information in January 2006 regarding possible funding from the SR 434 Access Management Project contingency which was originally funded at $340,000. After several meetings with Seminole County officials regarding this issue, City of Winter Springs Capital Projects Coordinator Greg Bishop has concluded that mediation will likely be necessary after the SR434 Access Management Project final completion date of January 16, 2006 due to project cost overruns and quality issues. Although Staff believes some contingency funding will be recovered as a result of mediation, an amount is undetermined at this time pending results of the contract closeout process. 012306_ COMM_Regular_302_SR434_ Village_ Walk_ Tree_Planting In the interest of time, Staff is presenting a plan to the City Commission that will allow the project to proceed without delay and with funds currently available in the FY '05/06 budget. Proiect Specifications (90) Canopy trees (30 to 100 gallon sizes) installed in existing rights-of-way and easements along SR434 between Sheoah Blvd. and SR 419. Varieties of trees include: Live Oak, Sand Live Oak, Winged Elm, Sycamore, Maple, Allee Elm, Laurel Oak and Bald Cypress. . Trees will be installed in various sizes ranked by growth rate and establishment requirements. . A specific program of watering, fertilization and pruning will allow younger trees to outperform trees that are larger at the time of installation. . Larger trees will be installed in select areas to provide instant canopy. . Bubbler irrigation for each tree will be attached to existing zone valves. . Installation and establishment process primarily by City Staff with aid from contractors on large material and irrigation. Total Proiect Cost $ 35.000 The Urban Beautification Services Division Manager and City Forester will hand pick all trees from local nurseries to insure grade and quality of material. As a cost saving measure, larger trees will be installed by a contractor while smaller trees will be installed by City Staff. The City Urban Forestry Worker I (Urban Forestry Grant Funded) will establish and maintain all trees during the first 6 months after installation, after which, maintenance will be turned over to the landscaping contractor. A licensed irrigation contractor will be hired to install bubbler lines to each tree utilizing the current irrigation systems at the installation site. FUNDING: Funding for this project is currently available from the Arbor Fund Line Code (110-54685- 30072) in the amount of$35,000. 012306_ COMM_Regular_302_SR434_ Village_ Walk_ Tree_Planting RECOMMENDATION: Staff recommends the City Commission approve plans for the installation of (90) canopy trees of various sizes along SR434 Village Walk in right-of-way areas and easements from Sheoah Boulevard to SR419 at a cost of $35,000 from the Arbor Fund Line Code (110-54685-30072). IMPLEMENTATION SCHEDULE: This project will be implemented beginning in March 2006 with tree procurement from local nurseries. The project is scheduled to be completed by June 2006. ATTACHMENTS: COMMISSION ACTION: 012306_ COMM_Regular_302_SR434_ Village_ Walk_ Tree_Planting