Loading...
HomeMy WebLinkAbout2000 11 13 Regular F Trotwood Connection Park Improvement Date: 11/13/2000 Due to time constraints, this Agenda Item was not heard. COMMISSION AGENDA ITEM F CONSENT INFORMATIONAL PUBLIC HEARING REGULAR X November 13,2000 Meeting MGR f~IDEPT j}4/' Authorization REQUEST: Public Works Requesting Approval to Accept Funds from the Developer of Winding Hollow for the City to Complete the Trotwood Connection Park Improvements. PURPOSE: The purpose of this Board item is to request approval to accept $47,716 from The Pizzuti Companies for the City to complete the improvements to the Trotwood Connection Park and formally designate the area as Oak Hollow Park. CONSIDERA TIONS: This approval is needed to complete the scope of the proposed improvements to the Trotwood Connector within the previous budget constraints. On March 22, 1999, the City Commission approved the linear park plans for the Trotwood Connection at a maXimum cost of$83,247.00. Pizzuti completed the grading, road hammerheads at both ends, and sidewalk connection at a cost $35,531.00, The remaining work includes decorative concrete work, lighting, landscaping, irrigation, playground equipment, and removable bollards to allow for emergency vehicle access. This past March, Pizzuti met with us to review bids they had received to complete the scope of work. The costs far exceeded the available funds and as we reduced the scope the interest of contractors also decreased. Pizzuti offered to remit the remaining balance to the City for us to complete the work using City labor where possible. Staff has met on numerous occasions with Jim Toukatly and Dean Kowal, representing Oak Forest Unit 8 and Winding Hollow, respectively, to refine the project scope to within budget limits, The attached No~ember 13, 2000 --Regular Agenda Item F Page 2 construction cost estimate details how we anticipate completing the project within the $47,716 budget. The only significant difference in the originally approved plans and proposed improvements is that seed and mulch with some Bahia sod will be used in lieu of all St. Augustine sod. During our meetings with Mr, Toukatly and Mr. Kowal, there was some concerns about the "Trotwood Connection" designation of this linear park and it was suggested that it be officially designated Oak Hollow Park to alleviate those concerns. The Parks and Recreation Director supports this designation, FUNDING: No City funds are anticipated to be needed at this time. The Pizzuti Companies will remit to the City the $47,716 if approved, RECOMMENDA TION: It is recommended that the City Commission approve the acceptance of $47,716 from The Pizzuti Companies for the City to complete the improvements to the Trotwood Connection Park and formally designate the area as Oak Hollow Park. IMPLEMENTATION SCHEDULE: The improvements will be completed within 60 days of the receipt of the funds from Pizzuti. Maintenance of the area will be added to the landscape maintenance contract. Parks and Recreation personnel will perform daily maintenance functions as needed, ATTACHMENTS: 1. Pizzuti letter of March 23, 2000 2. City Construction Cost Estimate to Complete COMMISSION ACTION: ./" ~ TIII-: 1'1/'./.1 :TI (:(),\II'..\i'iII':S ('4 q.1 \11:1 :- ';.-.lil :,-1 1:,,,;:.1.......,..'1 I "illllll....,';:.i.,.j.:-.:l.-. (11...:11'. i.I., ~::Ii. IIlil!1 f'.l','!d : ~::!l. -.!Idlj . ) i : : . \ ',: .; ~ .' ~":'~";!::: i i..,:.I'..:., \\' Hit'. . I 1;,,:01.. : :. ':'!'!" . ;'.~::i..l ;'l".ll,': .jP-,;;.ll.t!:II!i1 l :,\ HI",;;'! l.d";;" ! :11\ \t.\ I ; 'll" \li'! \,;!,.:i"i1 l'j;,..:: : I..:.;.!..,,! !',).t'::,... Illfj".;_c,III:.! ! 'i :"'." !.,:' j.~ ~ .~~.' I -,01 ", i ,.. :... ~ 1 i - " '1.-.':; I \\ ! i: .....1 : t. '\'.....,i.I/..ii:i ATTACHMENT NO. 1 c ~' TA. l ~17TT\\"1"~J1] '.' . \.:.1 \ \.. --'" ,', I \ . h. v, 1 i ""\...v"" ,,,..;...l ,_l I. ~ f\ ~,-._.;:11 ""'.l::.~ : ",., .. -tr~ -g.' r~~~T r:~! -~'- -1- r-t?f~{ -ff L.,< ~ Y ~ ~~~ ! I. [:, f) ~~~ d: l.r;->d% ! gj (.~ ..iii.. .....~ eo- ._~ !)!L--r.... "__" .'''''''__' .;"t. MAR ~ 4 2000 CITY OF W1NTER SPRINGS C i(y "'an >>gfOK March 23,2000 Mr. Ron McLemore City Manager CITY OF WINTER SPRINGS 11 26 East State Road 434 Winter Springs, FL 32708-1800 Re: The Trotwood Connector @ Winding Hollow Dear Ron, Over the past several months, we have been working with Kip Lockcuff, SRI Architects and a number of vendors in an effort to complete the work outlined within the enclosed Commission Meeting Agenda (Minutes) dated 3/22/99 for the above project, To date, we have completed and paid for the concrete sidewalk and the vehicular turnarounds on both sides of the connector. We have also completed and paid for the necessary design work, responded to the homeowner's association comments and concerns with design revisions, and have obtained competitive pricing for the balance of the work. Following the completion pricing, we met with Kip Lockcuff and Don LeBlanc (on 2/14/00) because the contractor pricing exceeded the proposed budget quite substanTially, We agreed during that meeting 10 .value engineerH (VE) the project in an effort to get it back within budget. and decided collectively to use the low landscape bidder to try to do this, Unfortunately, the scope of the project following VE has gotten so small that we have been unable to get anv of the landscape contractors interested in pursuing it further. After some discussion with Kip, we feel that the City may be able to accomplish this work more cost effectively than Piuuti can, and thus I am recommending that Piuuti make a cash payment to the City to satisfy Piuuti's responsibility for the work. The amount would be calculated by subtracting the current direct costs from the original budget of $83,247 stipUlated in tt,e enclosed document. Please let us know if this is an acceptable methodology. and we will move forward with a summary of the costs-to-date, wl,ich we will first present to Kip for his approval. <: \/11,/ tk"'-:lJfl\',:'f\l:;\v";l\(hn~1 ht;lk)'.......-IH(.Ch 23 lh 101((1 fl\r.I'.WfI<:t.~ (;I Y.1nh_... .'.oq:: 0(..-; If you have any questions or would prefer to discuss this matter further, please feel free to contact me at 407/541-1344. Thank you for your consideration in this matter. Sincerely, THE PIZZUTI COMPANIES cA~ Mark W, Rieker Vice President of Construction Orlando Cc: Ken Simback Kip lockcuff/Cily of Winter Springs Bill StarmerlSRI Architects h f: i' 'Ii: eVil" d'J(:lJrJl'_"lt~'....1f\df1U hcJr"""""nuc.:h 2J Ih 10 (on mclt.....netu 0( W'infCf .:;pg~.doc Trotwood Connector Budget Value as per 3/22/99 City of Winter Springs Commission Minutes Costs-to-date: JMHC Contracting (See letter dated 3/24/00,) SRI Architects (Per ContracVP.O.) Pizzuti's management expenses (valued at approx $4,500) Pizzuti's direct expenses (valued at approximately $1,000) Subtotal of Expenses Proposed payment to City of Winter Springs: Proposed Settlement $30,771.00 $4,760.00 n/c n/c $83,247.00 $35,531.00 $41,116.00 3/27/00 ESTIMATED HARD COSTS FOR CITY COORDINATED CONSTRUCTION of Trotwood Connector (aka Oak Hollow Park) Subcontracted Hard Costs Product Cost Labor Miracle Recreation Equipment Company Playgrounds $8,484.70 City Course Tech Materials Sand $977,50 City Castille Company Concrete w/o Bollards $22,785,00 Vendor/City Bollard Material SCH 40 Steel pipe $800,00 City Florida Power Corp, Light Posts $3,443,00 Vendor Landscape Trees, plants, mulch, sod $4,308.00 City Irrigation Pipe, valves, heads, trencher $2,700.00 City TOTAL $43,498.20 OPTIONS Raised Brick Planters (2) $1,000,00 City & Vendor Concrete Landscape Curbing $3,200,00 Vendor ITOTAL w/options $47,698.201 $47,716.001 :t> ---t ---t :t> ("") :::I: s:: m ::z: ---t ::z: o . IAvailable Funds from Pizzuti ~ Oak Hollow Park Landscape Plan View All landscape island boarders to be decorative concrete curbing (terra-cotta color). LANDSCAPt PLANTING NOTES: ~l ~ ~t:~~ ~U;2t ~E Hk~X- t;~~~S &'j~~A~s~~'fo ~s:~~~~ ~,:,~~ AA't) STA.IIDARIY.; rORNURS(RY Pv.N~. 3) AU. PlANTS ARE' SUBJECT TO APPROVAl BY tHE LANDSCAPE ARCHITECT AND O\'r.'ltR. WORE. OURIN!;. AN{} AfTtR JUST.t.LLAnOU. ~~ ~II~~~;gE"::.~~~[~~~A ~~L ~~ ~ ~~~~t6G ~;'5:R~Ll1~~'ffi.A_L LEADLR A..";tO HAVE A fULL. oo:~ CRQ....,:. 61 A.u. TREES 91/1.lL BE ST""'~O -'NO CUYE'O AS SHCV\N iN PL.,f,ffUHG DeTAIlS. 1 AlL UUlCH pt......,nN(; AAE4S SHAll Bt A, M1W\oIIJM or 2"' IN D(PlH~ 8 JI..LL PlA..mNC AREAS SHAll HAVE A I.llNWUI.t or 3" lQPSO:L 9 .ALL lREES $J1ALL BE FREt Of OPEN l,I,'O!JNOS AIiD Vt'QUNO SCARS Hi rrlE Q..(AR 'TRUNK A..q(A. 1 ) U~{~l~lm~T~r B~r LA":...NftI~L n;rrH~fu~~S~~ ~~ ~~~ll'j RJ~1~ l~~::D 'go-.m 1/3 or ntt ROOTBAll. LANDSCAPE CONTRACTOR NOTES: I) ~~J~~~~~s.c~~m.A~f ~ ~~S:~~8UO ~~Rr~t~~t~~. 6~~~.I:%t~~~SE WAl'tRING. PEST CONtROL. MUL<:H1NG. WOWJiG, fERi!UZlNG AND R[SETllNG TRf.:ES lHA.l ARE OUT Of PLUME, 2) mE LANOSC.A.pt CONTR"'CTOR SHA.U COMPLETELY CUARANT[( AlL INS1.ALLED PL.ANI Il4AT(RIAl . FOR " PERlOQ Of ONE C.A.U:NOAR 'rEA..q B(Glm{ING eN THE DA IE 0; 100:;; COUPlE110N. . ~y MID .A.lL RtOUIRto PlANT REPlAC[l.tOHS StlAll BE MADE PROI.I.PTL'r' AND A T NO ADDITIONAL CDS i TO THE OWNER. J) THE lJoNOSCAPE CONTRACTOR SHAll STAKE lHE LOCATIONS OF ALL p!"'AUT MATERIAL """''0 PL.&.N'T1NC 8(0 UNC$ roo R(V1(Vl BY THE lANDSC",P( ARGHIT(CT AND O~ 4) TH~ lANDSC'-PE CONlRACTOR SH.6J...l. BE RESPQt{S!BlE FOR IJ(R!DC.ATIQN or A.Ll lIa'RfTl[N PLANT C\JANlnES PRIOR fO INmAnOH Of THe WORl':. IN THE (vun lHAT mE PlANS CONtRADICT THE PLAtn LIST. lHE PLA.t1$ RULE:. " 5)IHE lANDSCAPE CON'lRACTOR SHAU BE FAJ,fllA,P \lol1H A/{D ACCCPT THC ()JSllNC SITE CONDITIONS PRIOR TO INITIAnON Of mE: wa:u<. Atn.V,ARlA.Tl0N mOM tHE SPEClf'lro WORK SHAll BE 1'HE RE$POtJS!B:UiY OF THE tAf:OSCAP( CONTRACTOR. 6) ~t~~J~~c~~~:'g~S~~W~KRS~~~SZi~ 6~(~~:J:l1sA~~~D~~g;~~D o~~~~~g. .,1, OURIHe; THE \Io'ORK. 7) THE LANDSCAPE CON1'RAClOR SH~l or RESPONSlBLE: TO ~A'<E ANY ANO ALL NECESSARY REPAIRS TO DAMAGE C"'USED BY !;itS wQRKA.l NO ADDITIONAL COST TO JHE OWNER OR LANDSCAPE. ARCHl1ECi. a) THE LANDSCAPE CONTRACTOR SHMl. BE RESPONSIBLE fOR OB'TAIM;NG AU NECESSARY PERMITS. AND FCt.LOWtNG ill APPliCABlE LOCAL CODES PERTAINING 10 THE. PRO..E:Cl DURtNG 'THE COURSE. Of' HIS WORK. City Mtg: 1-Sep-2000 r l.: Cost savings: All trees to be obtained from Tree-Bank. Alternate plant options specified by City Arborist. TROTWOOD CONNECtOR>:-: PLANt liST 5"r'MSO'_ auANTITY DE5CRIFTICN R::r1AR<S eaT ANrc~l.. NAM"": COt"1'1ON N.!.."1E Tl<EE5 (...or walters Iburnum)1 15 gal. ~ ~Ae.~ P';'~Ti<A. :-40LLY -a;.le. 4.. >: 4'.5. 5FR!). M1N./~6 I .~::: ~'"'1 5p.t:.CE AS &f...IO.1N R..'LJ; ;SYMME.TRlCAL C~5 I 3' c.t. MIN. \ ~IVE OLK 12'-i4i !-ol..:.. :;.'-b. SF"R:)./:' 1i;:"-3 u-:.. ~j~GI r-' ~~c.e AS ~OJN IEP n ILEX 'EAST PAlAT~~' QV 12 QUERCU5 V!RGINIANA 5I<I<U85 t .~Qr Zamia) ...or illicium) :'~R 1 LEG 41" RI 483 LIRIOFE MU5CARI 'EV'E~EN G:IANl IANT 60RDER GRA.55 4.~ FPP MIN. I FULLI k:; ]4" o,c. 1O"~'S." I-;T.)( 12"-te-.. &PRO. I P~LL 1;0 .30" o.c, !lOD I Bahia (Sod along sidewalk & planters, Seed eve __TLM _ID, FR:E C~ UEEOSF=Si5 ..:..N:; DiSEL.$:& TO 'COVER ALL BARE OR ~15TU'R9ED A~A& reD STENOTA , I ! J (...or mulch MJLCfl reD 2- ~TT.:..':D DEPT~ M~IMUM - PREE c::: DE~3' __ MINI FiNE BARK t-.'l..lGtGzET5 MINI PiNE BAR< NUGGETS sources: CAD by SRI (15-Jun-99, 9-Sep-99), Grading by Mcintosh (15-Dec-98), Equip by GameTime, 5 Oak Hollow Park Hammerhead Detail (Typical) one end shown, duplicate other end. ~~~c~c~~~~c~cccc~c~~cc~~~~~ccc~c~~~~c~~cc~~c~~~c~~~c~c~c~~~ l~'~'~'~'~'~'~'~'~'~'~'~'~'~'~'~'~'~'~,~,~,~,~,~,~,~,~.~.~.~.~.~.~.~.~.~.~.,.~.~.,.~.~.,.,.~.~.,.,.,.~.~.,.,.,.,.,.~. .,~.~.~.,.~.~.~.~.~.~.~.,.~.~.,.~.~.,.,.~.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.~ .~.~.,.,.~.,.,.~.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,-,.,. _.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.,.~.~.,.,.,.,.,.,.~.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.~.,.,.,.,-,., . r- ,h_ - - ~- - -- ~-.-~ - --,-- -_ -- -- --- .-- . Built-up planter outlined with decorative building-block wall, terra-cotta color, rough-face. i '~ENLARGED PLAN j: ~,,_~. , :,e=~,'-e-.'o'c (at north-end only): I Move drain to provide clearance for planned landscape I REMO"Y1:!:AeL.e eoL.LAq::) EMElQG:ENCY' ACCE&6 0Nl.. T -- 12"11. 2-4' ~leeoN ar.:e WI- (;J~ 8,A~ ear-.TNJ0J6 'e ".q)~ -i'--r#- ~. ~ ~ _ u~__ _____. 11 Removable' ~ ~' -~ - --- ,11 Fixed 'r _. -. I FixED 6OLLA!':D5 ~i Terra-cotta color concrete . Add enough . Fixed Bollards to extend all the way to .."... ".". ".".". ".".". "."."...". ".".".". ". ".". ". ". " ".". ".".". !".". .!!,l~~~.~~"<<:"~C?C?~.~~ "t;"~9~:."."."."."."." ..~.~.~.~.~.~.~.~.,.~.~.~.~.~.~.~.~.~.~.,.~.~.,.~.~.~.~.~.~.~.,.~.~.~.,.~.,.~.,.,.~.~.~.~.~.~.~.~.,.,.~.~.~.,.~.~.~.~ I~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.,.~.~.~.,.,.~.~.,.~.~.~.~.~.~.~.,.,.~.,. ..~.~.~.~.,.~.~.~.~.~.~.~.,.~.~.,.~.,.~.~.,.~.~.~.~.~.,.~.,.~.~.,.~.,.,.,.,.,.,.,.~.~.~.,.~.,.,.,.,.,.~.~.,.,.,.,.,.~ I~.~.~.'.~.'.'.'.~.~.'.'.~.~.'.'.'.'.~.~.'.~.'.'.~.'.'.,.,.,.,.,.,.,.~.~.~.~.,.,.~.,.,.,.,.,.,.,.,.~.~.,.,.,.,.,.~.,. ..~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~ City Mtg: 1-Sep-2000 sources: CAD by SRI (15-Jun-99, 9-Sep-99), Grading by Mcintosh (15-Dec-98), Equip by GameTime, 2